| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC LOWEST RATE | |
| 2 | L2₹6.6 L+₹1.7 L (33.7%)Rejected-Finance | L2 | Rejected-Finance HIGHER THAN L1 | |
| 3 | L3₹7.4 L+₹2.5 L (49.8%)Rejected-Finance | L3 | Rejected-Finance HIGHER THAN L1 AND L2 | |
| 4 | L4₹10.6 L+₹5.7 L (115.2%)Rejected-Finance KERALA INDIA 682030 | ERNAKULAM | KERALA | 682030 | L4 | Rejected-Finance IGHER THAN L1, L2 And L3 |
Tender Value
Refer Docs
EMD Value
₹17,150
Closing Date
8 Mar 2021, 2:00 pmClosed
AGMMT
TCC LTD UDYOGAMANDAL ERNAKULAM
Repairs to epoxy lined floor surface and vinyl flooring at sodium chlorate plant
2020_TCCL_371851_3
TCCL/WC/C/741/2020
Open Tender
Civil Works - Others
Item Rate
90 days
THE TRAVANCORE COCHIN CHEMICALS UDYOGAMANDAL
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
₹17,150
Yes
7 Jun 2021
17 Feb 2021
10 Mar 2021
17 Feb 2021
8 Mar 2021
17 Feb 2021
Amount
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within the factory as pointed out by engineer in-charge.
Application of coaltar epoxy screeding, based on ciba solventless or equivalent, Araldite GY-250, Hardner HY-830/850, coaltar quartz system over primer coat of ciba solventless (or equivalent), Araldite GY-257 and Hardner HY-840 coaltar system and final finish seal coat of ciba solventless (or equivalent), Araldite GY-255 and Hardner 45 to a thickness of 3mm (all inclusive), cleaning the existing floor surface thoroughly, removing the coating, acid washing etc., removing wastes to east yard, including all labour charges, hire for tools, all safety precautions to workers, materials, equipments, pipe lines etc.,including cost of Materials complete.
Plastering with cement mortar 1:4, 12mm thick at all elevations and locations, including racking and hacking the surface for proper grip, plastering and keeping the plastering without flooding with water continuously for 48 hours, including all labour charges, scaffolding charges, cost of all consumables, curing charges, all safety precautions etc., complete. (Required cement will be issued free of cost by TCC)
Engaging labourers for removing the existing flooring mat, carefully without damaging the platform, transporting and dumping sheets to places pointed out, all wages, contributions, all safety precautions etc., complete. Skilled Worker
Male Coolies
CR Associates
S & M COATINGS
R. Sajikumar
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .