| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technical bid documents found correct as per the tender conditions |
| 2 | Accepted-Technical | Accepted-Technical Technical bid documents found correct as per the tender conditions |
| 3 | Accepted-Technical | Accepted-Technical Technical bid documents found correct as per the tender conditions |
| 4 | Accepted-Technical | Accepted-Technical Technical bid documents found correct as per the tender conditions |
| 5 | Accepted-Technical | Accepted-Technical Technical bid documents found correct as per the tender conditions |
Tender Value
₹7.0 Cr
EMD Value
₹14.1 L
Closing Date
5 Aug 2026, 10:30 amClosed
Dy Comdt. (Engr) SHQ (Chandigarh) ITBP Chandigarh
SHQ Chandigarh Airport Road Behlana Camp ITBP Chandigarh U.T Pin 160003
Construction of 01 No 120 Men Jawan Barrack at 26th Bn ITBP Ludhiana Punjab
2026_ITBP_917469_1
ITBP/SHQ(CHD)/Engg/26- 4071-77
Open Tender
Construction Works
Percentage
540 days
26th Battalion ITBP Ludhiana Punjab
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14.1 L
SHQ Chandigarh Behlana Camp ITBP Chandigarh U.T
29 Aug 2026
15 Jul 2026
6 Aug 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
15 Jul 2026 - 5 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. All kinds of soil | 1,339 | cum | 172.71 | ₹2,31,258.69 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 127.18 | cum | 253.27 | ₹32,210.88 |
| 3 | Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m :All kinds of soil Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm dia | 325 | meter | 342.64 | ₹1,11,358 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 586.3 | cum | 190.71 | ₹1,11,813.27 |
| 5 | Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. | 772.8 | cum | 681.59 | ₹5,26,732.75 |
| 6 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil | 366.69 | cum | 123.38 | ₹45,242.21 |
| 7 | Supplying and filling in plinth with local sand under floors, including watering, ramming, consolidating and dressing complete. | 46.86 | cum | 2,066.41 | ₹96,831.97 |
| 8 | Filling with available fly ash and earth (excluding rock) in trenches or embankment in layers (each layer should not exceed 15 cm), with intermediate layer of compacted earth (Soil density of 98%) after every four layers of compacted depth of fly ash, sides & top layer of filling shall be done with earth having total minimum compacted thickness 30 cm or as decided by Engineer -in-charge, including compacting each layer by rolling/ ramming and watering, all complete as per drawing and direction of Engineer -in - charge. | 780 | cum | 299.88 | ₹2,33,906.4 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 Cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) | 127.59 | Cum | 6,342.6 | ₹8,09,252.33 |
| 10 | Providing and laying C.C. pavement of mix M-25 with ready mixed concrete from batching plant. The ready mixed concrete shall be laid and finished with screed board vibrator , vacuum dewatering process and finally finished by floating, blooming with wire brush etc. complete as per specifications and directions of Engineer-in charge. (The panel shuttering work shall be paid for separately).(Note:- Cement content considered in this item is @ 330 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately). | 1 | cum | 9,558.56 | ₹9,558.56 |
stage.html
html • 0.03 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
Tendernotice_2.pdf
PDF • 2.54 MB
BOQ_964163.xls
BOQ • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .