| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.7 LAccepted-AOC VYTHIRI P O WAYANAD | VYTHIRI | WAYANAD | KERALA | 673576 | ₹1.7 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ABDUL SAJEER K P L1 |
|---|---|---|---|---|
| 1.00Concrete Road | ||||
| 1.00 | OD265201/2025-2026:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 | 72 | sqm | 33.96 ₹2,445.12 Lowest |
| 1.00 | OD246194/2025-2026:4.11.2 Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers manually on prepared surface, and compacting with rammer to achieve the desired density as per Technical Specification (ii) Using Gravel mix soil. | 7.68 | cum | 2,145.4 ₹16,476.67 Lowest |
| 1.00 | 75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification
(i) Nominal mix (1:2:4) | 11.52 | cum | 8,836.91 ₹1,01,801.2 Lowest |
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 2.62 | cum | 870.25 ₹2,284.41 Lowest |
| 1.00 | OD342968/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 8.4 | cum | 3,844.04 ₹32,289.94 Lowest |
| 1.01 | 11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20 | 0.75 | cum | 9,135.62 ₹6,851.72 Lowest |
| 1.01 | 11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.06 | tonne | 92,804.08 ₹5,568.24 Lowest |
Tender Value
₹1.7 L
EMD Value
₹4,235
Closing Date
13 Feb 2026, 6:00 pmClosed
AE LSGD
vythiri GP
Vythiri GP-Annual Plan -2025-26-Pro No -68/25-26 - Pallithaazhe Road Concrete- Re etender.
2026_LSGD_834057_1
08/25-26/TEN/AE/ LID AND EW/VGP
Open Tender
Civil Works - Roads
Item Rate
180 days
Vythiri GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹555
Yes
₹4,235
Yes
31 Mar 2026
6 Feb 2026
16 Feb 2026
6 Feb 2026
13 Feb 2026
6 Feb 2026
Concrete Road
OD265201/2025-2026:Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50
OD246194/2025-2026:4.11.2 Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers manually on prepared surface, and compacting with rammer to achieve the desired density as per Technical Specification (ii) Using Gravel mix soil.
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth
OD342968/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
11.4.4:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203<br> IV. R.C.C grade M 20
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1402945.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 0.25 MB
Tendernotice_3.pdf
PDF • 0.25 MB
preliminaryagmnt.pdf
Tender Documents • 0.13 MB
affi.pdf
Tender Documents • 0.11 MB
fot68.pdf
Tender Documents • 0.13 MB
viewsbd.pdf
Tender Documents • 1.98 MB
BOQ_1402945.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .