Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹85.3 L+₹14.0 L (19.7%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹85.6 L+₹14.3 L (20.1%)Rejected-Finance 23 VIKAS NAGAR NEAR SATYAM SCHOOL NANTA ROAD KUNADI KOTA | KOTA | KOTA | RAJASTHAN | L3 | Rejected-Finance L3 |
Tender Value
₹63.2 L
EMD Value
₹63,190
Closing Date
1 Feb 2021, 1:00 pmClosed
Chief Engineer, KSTPS, Kota
New Adm. Building, Kota Super Thermal Power Station, Sakatpura, Kota
Capital, Routine and Breakdown Maintenance of Pumps and Ash Disposal Lines upto Ash Dyke of Stage-I To V of KSTPS, Kota
2021_RRVUN_210759_1
4849
Open Tender
Repair and Maintenance Works
Percentage
365 days
Kota Super Thermal Power Station
As per QR mentioned in Tender documents
2 documents required · 2 mandatory
₹1,180
Digitally as mentioned in tender documents
₹63,190
Yes
5 Jul 2021
20 Jan 2021
2 Feb 2021
20 Jan 2021
1 Feb 2021
20 Jan 2021
Routine, preventive & minor break down maintenance work in general shift of AHP Pump house area, Stg- I to V, associated pumps, pipelines, valves, overhead cranes including checking of oil level & transportation of material from Stores Manpower Required
Unskilled
Semi Skilled
Skilled
Highly Skilled
Routine, Emergency, Breakdown and shift maintenance works for operation of CMR system, drain pump, dewatering pump of both the units including following jobs in shifts. These Man Power will also be utilised by AEN(AHP-I/II) for AHP work in General duty. i) Operation of CMR system regularly in all the three shifts of Unit –1 & Unit-2. ii) Maintenance of CMR system as directed by the Engineer i n-charge. ii) Unloading of hydro bin as required iii) Operation of drain pump. iv) Checking of operation of dewatering pump, if required. Man Power required
Skilled
Petrolling of all Ash disposal lines (line no. 1 to 8) round the clock for checking leakage anywhere from respective pump house to ash dyke & Daily checking of Ash Dyke for: i) Back flow of Ash water ii) Overflow from boundaries / embankment of ash. iii) Proper positioning of all lines on Steel Structure / Pedestal /Ash Bed. iv) Any leakage of pipe coupling etc. vi) Maintain all ADL record for rotation/ replacement of pipe & bends & other associated work as per direction of work incharge. Man Power required.
Skilled
Un -skilled (in Shift)
Bidder Name
Amount
Navdeep Engineer Fabricators(GSTN-08AACFN4499A1ZA)
M/s MITUL ENGINEERING SERVICES(GSTN-08AFRPS6892L1Z7)
Krishna Engineering Works(GSTN-08AQDPS2196L1Z9)
Navdeep Engineer Fabricators
Krishna Engineering Works
Navdeep Engineer Fabricators
Krishna Engineering Works
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .