Tender Value
₹14.7 L
EMD Value
₹15,000
Closing Date
1 Sept 2026, 6:00 pmClosed
Dy.Minicipal Commissioner - West Zone
P/L paver block in the around the municipal anganwadi and in other municipal building area in Sabarmati ward Of WZ .
339124
2/26-27 (T.N.64)
Open
Civil Works - Others
Works
Ahmedabad
4 documents required · 0 mandatory · 4 optional
₹900
Municipal Commissioner, Ahmedabad
₹15,000
28 Aug 2026
28 Aug 2026
28 Aug 2026
1 Sept 2026
28 Aug 2026
2. Tender Estimated Cost extra by AMC/Authority at prevailing rate to the
1% of the Tender Cost in the form(Rs. 15,000.00)
3. Earnest Money (For work upto 1cr. EMD in form of
D.D./PayOrder/Local MicrCheck/B.G. & for works
above 1 cr EMD in form of D.D./PayOrder/B.G.
4 Tender Fee Rs Demand Draf tof Rs.
6. Time-Limit 12 months
7. Validity Period 120 Days
8. Eligibility Criteria Register “E-2” class in PWD in Govt. R&B/CPWD/AMC
or equivalent registration with any other state Govt. or
(i)Last Date of Submission of
9. the Tender Dt.01.09.2026 upto 18:00 PM
a) In Sealed cover in duplicate copies by Registered Post
(ii)Mode of Sending A.D, or by Courier.or hand delivery
b) Tender sent by ordinary post will be rejected out right.
(iii)Description essential to be
a) Name of work, Tender Notice No. & Tender No.
Made on sealed cover b) Date of receiving tender by Corporations.
(iv)Mode of quoting rates in
The Price bid shall be submitted online only.
Schedule of Quantities and It shall not be submitted Physically.
10. Date of Opening Dt..02.09.2026 15:00 PM
Place of Submission & Submission of EMD. Tender fee and other Documents during
11. office hours: On Dt.02.09.2026 &12:00pm West Zone, 2nd
Opening of Tender Floor, A.M. Office, Dr. Ramanbhai Patel Bhavan,
Usmanpura. Ahmedabad Municipal Corporation, W.Z.
Office, Ahmedabad-380013.
(1) Rs.1000/- per day (for tenders amounting upto
Lakhs), (2)Rs.2500 per day (for tenders amounting above
12. Penalty Due to Delay of
work 10 Lakhs andupto30Lakhs), (3) Rs.5000perday( for
alltenders amounting
above30Lakhs) but not more then10% of bill
13. Defect Liability Asper ‘B-1FormClose
Whenever a work is allotted by Engineering staff, whether
Time permitted to start minor ormajor of part thereof of any amount, the contractor
14. shall be bound to start the works within 48 hour sof
intimation of work. Communicationd one telephonically via
SMS,Via Whatsapp and Through letter /E-mail shall be
considered legal and binding for the same. Failure of comply
to start the works in 48 hours of intimationas above by
contractor the contractor shall be levied penalty of
(1)Rs.1000/-perday
(fortendersamountingupto10Lakhs),(2)Rs.2500 per day (for
tenders amounting above 10 Lakhs and
upto30Lakhs),(3)Rs.5000 perday (for all tenders amounting
above 30 Lakhs). Three times failures by contractor shall
make contractor responsible tobe black listedunless and
otherwise justified properly inwriting /bindingwithin 15days
of last notice of penalty.
The staff of the contractor shall wear safety
jackets,hoes, helmets etc. while on duty and any violation will
attractfineofRs. 5,000/-foreach incident.
16 Safety Failure to erect safety signage or trying to carr you the
works with out properpre cautions/safety measuresas equired
will attractafine of Rs.5,000/-for each incident.
Contractor'sSign Addl.C.E.(westzone)
AHMEDABAD MUNICIPALCORPORATION
ENGINEERING DEPARTMENT (WEST ZONE)
AMDAVAD MUNICIPAL CORPORATION
Name of Work :- P/L paver block in the around the municipal anganwadi and in other municipal building
area in Sabarmati ward Of WZ .
Name of Zone:West Zone
Sr. No. Quantity Item Rate Unit Amount
Earth work in cutting in all sorts of soil &
murrum incldg.conveyaning ,breaking clods
spreading the stuff as & where dire. With in a
lead of 50 mt. from end of cutting. (R&B SOR-2015-
16, SOR Item Code- 04001, Item 4.1 / Ch. 4, Pg. 39–
Conveyance charge of earth, lime, murrum,
building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind
Including spreading & levelling etc. complete.(R&B
SOR-2015-16, SOR Item Code- 01001C, Item 1.1 /
1000 c)Lead up to 5 Km. 117.2 Cmt
Dismantling the following including loading,
unloading and disposal of unserviceable material
for all lead or as directed by Engineer-In-Charge
and stacking the serviceable material and
3 backfilling the resulting trenches and pits complete.
5 central verge -kerb stone (R&B SOR-2015-16, SOR 8 Rmt
a Item Code- 03001 , Item 3.1 / Ch. 3, Pg. 28–32)
Dismantling tiled or stone floors laid in mortar
including stacking of serviceable material and
500 disposal of uservicalble material with all lead and 27.44 Smt
lifts (R&B SOR-2015-16, SOR Item Code-
b Item 3.1 / Ch. 3, Pg. 28–32)
Demolition & disposal of unservisable material
with all lead and lift for unreinforeced concrete.
(R&B SOR-2015-16, SOR Item Code- 03008, Item
Demolition of brick work & stone masonry
including stacking of serviceable materials and
50 disposal of unserviceable materials with all lead 314.5 Cmt
and lift (1) In cement mortar. (R&B SOR-2015-16,
d SOR Item Code- 03010, Item 3.1 / Ch. 3, Pg. 33-36)
Demolition including stacking of serviceable
materials and disposal of unserviceable materials
20 with all lead and lift. (I) R.C.C work. R&B SOR- 604.74 Cmt
2015-16, SOR Item Code- 03012, Item 3.1 / Ch.
Extra rate over item of excavation of earth for
excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing
the asphalt carpet, metal,s oiling/cutting
Reinforcement etc.comp. with stacking the
material as directed. (Based on Previously
4 approved rate by C E sir ) (AMC RATE)
a up to 0.20 meter thickness (By Manual)
0.20 to 0.30 meter (By any type of Breaker
20 Machine or R.C.C.Cutter machine including cost 176 Smt
b of operator, fuel, & transportation etc complete.
0.30 meter & above (By any type of Breaker
20 Machine or R.C.C.Cutter machine including cost 311.08 Smt
c of operator, fuel, & transportation etc complete.
Supplying and fixing of 380 mm H x 300 mm L x
mm B Kerb block for Central Verge in M-20
grade using 20 mm nominal size black trap
aggregate of Sevaliya/Timba or equivalent
quality for pre-cast blocks, reasonably exposed
finish/ formwork, mould with well equipped
with vibratory system for kerb stones of
approved design including curing, etc. complete,
including the cost of formwork etc. complete. The
rate shall also include necessary cutting of asphalt,
fixing the Kerb stones in line and level on 5 cm thick
sand bedding with necessary equipments and
materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the
kerb stone fixed with Bituminous concrete
mixed in proper position as directed by Engineer
in change to form a portable mixture. In any case
Gravel or such type of materials shall not be
allowed for productiona) Laying on 5 cm thick Sand
Bedding (R&B SOR-2023–24, Ch. 14 / Item 14.23,
Supplying and fixing of 300 mm-L x 150 mm-B x
380 mm-H Kerb block for Footpath in M-20 grade
using 20 mm nominal size black trap aggregate of
Sevaliya/Timba or equivalent quality for pre-
cast blocks, reasonably exposed finish/
formwork , mould with well equipped with
vibratory system for kerb stones of approved
design including curing, etc. complete, including
the cost of formwork etc. complete. The rate shall
also include necessary cutting of asphalt, fixing the
Kerb stones in line and level on 5 cm thick sand
bedding with necessary equipments and
materials. The rate shall also include the flush
pointing in CM (1:3) for all joints of the
kerbstones. Filling of zari alone the sides of the
kerb stone fixed with Bituminous concrete
mixed in proper position as directed by Engineer
in change to form a portable mixture. In any case
Gravel or such type of materials shall not be
allowed for production. a) Laying on 5 cm thick
Sand Bedding (R&B SOR-2015-16, SOR Item Code-
Providing and Laying of Rubber Moulded
Paver Block Grey/Coloured 60 mm thick, M-35
Grade of any size ; shape (Usually Uni-Paver
Blocks) using black trap good quality aggragate
of 20 mm nominal size for footpath, parking areas,
service lanes and other areas as
mentioned in the drawing / instruction of
engineer in charge. Cost includes formworks
using rubber mould, Rate providing and laying
paver blocks as per required grading and
specification. The paver block shall be
mechanically compacted. The work of paving
blocks shall be executed in line and level by
skill mason of flooring work only. It should be laid
in such a way that the no cutting of the paver
block to be necessary. if cutting of paver block
necessary then it should be cut by machine
only and carting. The finished surface of the
paver block shall have resonably good, plain
finished. Paver blocks shall be compacted and shall
be relaid if necessary. Gravel or such type of
materials shall not be allowed for production.
Laying on 5cms thick sand beddding. (R&B SOR-
Providing and laying of interlocking grey paver
blocks of high density 80 mm thick made from M-
40 grade concrete using 6 mm to 20 mm machine
crushed well graded stone aggregate, sand of
approved quality, OPC 53 grade cement with
8 contractor's own concrete mix design as
approved by AMC, for parking, road. Cost Includes
formwork, using rubber/FRP mould, laying paver
block as per required grading and
specification laid paver block shall be
mechanically compacted. The work of the paving
blocks shall be executed in line and level by
skilled mason of flooring work only. It should be
laid in such a way that the no cutting of the paver
block to be necessary. Cutting of paver block by
machine cut only and carting to be done. The
Finished surface of the Paver Block shall have
reasonably good plain finish. Paver blocks shall
be compacted and shall be re-laid if necessary.
Gravel or such type of materials shall not be
allowed for production. Laying on 5 Cms thick
sand bedding. (R&B SOR-2023–24, Ch. 14 / Item
Paver Block Providing and laying shot blasted
Non - interlocking, Paver blocks of specified
thickness, size, grade of concrete and colour
machine made and blasting by automatic shot
blasting machine and high density of as per
approved sample of approved make for
footpath, parking areas, service lanes,cross over
and other areas as mentioned in the drawing.
Including providing and laying 50 mm thick
averave bedding layer of coarse sand below paver
block as per required grading and specification.
Laid paver block shall be mechanically compacted.
The work of the paving blocks shall be executed in
50 line and level by skilled mason of flooring work 669.65 Smt
only. Small size of paver block with same
specification shall be used at residue or at end. It
should be laid in such a way that the no cutting of
the paver block to be necessary. If cutting of paver
block shall be required , than cut by machine only
and laying to be done by skilled flooring
mason. The finished surface of the paver block
shall have coarse sand Texture Finish. Pave blocks
shall be compacted and shall be re-laid if
necessary. Actual laid area shall be measured
and paid without any wastage. (A) 60 mm thick M-
35 grade Grey (R&B SOR-2023–24, Ch. 14 / Item
Paver Block Providing and laying shot blasted
Non - interlocking, Paver blocks of specified
thickness, size, grade of concrete and colour
machine made and blasting by automatic shot
blasting machine and high density of as per
approved sample of approved make for
10 footpath, parking areas, service lanes,cross over
and other areas as mentioned in the drawing.
Including providing and laying 50 mm thick
averave bedding layer of coarse sand below paver
block as per required grading and specification.
Laid paver block shall be mechanically compacted.
The work of the paving blocks shall be executed in
line and level by skilled mason of flooring work
only. Small size of paver block with same
specification shall be used at residue or at end. It
should be laid in such a way that the no cutting of
the paver block to be necessary. If cutting of paver
block shall be required , than cut by machine only
and laying to be done by skilled flooring
mason. The finished surface of the paver block
shall have coarse sand Texture Finish. Pave blocks
shall be compacted and shall be re-laid if
necessary. Actual laid area shall be measured
and paid without any wastage. (A) 80 mm thick M-
35 grade Grey (R&B SOR-2023–24, Ch. 14 / Item
Labour work of fixing kurb any design of central
verge, (both side) footpath kurb, items includes
necessary excavation, asphalt cutting of any
thickness, erecting in line and position and pointing
with cement mortar (1:3), watering, etc complete,
filling with zari along the side of the kurb, the kurb
stone fix prepared with bitumnious top surface, as
directed by engineer in charge. (R&B SOR-2015-16,
SOR Item Code-L-1401, Labour Chapter, Pg. 180–
Provdg. & laying cement concrete 1:5:10 (1
cement : 5 coarse sand : 10 hand broken stone
aggregates 40 mm nominal size) and curing
complete excluding cost of form work in. (R&B
SOR-2015-16, SOR Item Code-05003, Item 5.3.4 /
Providing TMT Bar FE500D reinforcement for R.C.C.
Work including bending,binding and placing in
10 position complete upto floor two level (R&B SOR- 63.1 Kg
2015-16, SOR Item Code- 05015, Item 5.5.1 / Ch.
Providing and Casting in situ ordinary
cement concrete M200 for R.C.C. Raft and cutt off
walls including necessary shuttering laying,
2 vibrating, ramming and curing complete.(B) Walls, 3672.3 Cmt
fom top of foundation level upto floor two level
(upto 10ton). (R&B SOR-2015-16, SOR Item Code-
Labour work for fixing any kind of paving with
cement pointing in CM 1:2, including watering,
ramming etc comp. as directed For pavement (R&B
SOR-2015-16, SOR Item Code-L-1401, Labour
15 Chapter, Pg. 180–185)
Laying on Sand bedding as per requirement
200 to fix the C.C.Block / Nibhada Stone in Line & 68.64 Smt
For Water Table & Kerb on Sand bedding as per
50 requirement to fix the C.C.Block / Nibhada Stone in 30.8 Rmt
b Line & Level.
Providing, laying, spreading and compacting
graded stone aggregate to wet mix macadam
specification including premixing the Material
with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site,
laying in uniform layers in subbase / base course on
well prepared surface and compacting with
vibratory roller to achieve the desired density as
per MoRTH clause 406. (MoRTH-2015-16, SOR Item
Code- 0406, Clause 406 / Ch. 4, MoRTH Pg. 110–
(A) Supply of WMM
60 (B) Laying of WMM 111.87 Cmt
Colour Washing with lime on all wall surface (two
coat) over and including a primary coat of white
washing t ogive an even shade after through
10 brooming the surface to remove all 6.96 Smt
dirt,dust,mortasr drops and other foreigh matter.
(R&B SOR-2015-16, SOR Item Code-
Repairing damaged I.C./ Raising removing damaged
brick work and repairing by brick masonry in C.M.
1:5 and plaster in C.M. 1:3 and fixing C.I. steps and
10 existing chamber sheet cover, removing the debris 401.78 No.
from chamber and carting the same as directed.
(GWSSB SOR-2009-10, SOR Item Code-24008B,
18 Item 24.27 / Ch. 24, Drainage SOR Pg. 42–46)
Repairing damaged M.H. and rasing M.H. up to
road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster
in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and
carting the same as directed.(GWSSB SOR-2009-10,
SOR Item Code-24008B, Item 24.27 / Ch.
19 Drainage SOR Pg. 42–46)
5 (A) up to 0.15 mt. (@ Two Coarse) 732.14 No.
3 (B) up to 0.35mt. (@ Four Coarse) 1160.71 No.
2 C) up to 0.65 mt. (@ Seven Coarse) 1794.64 No.
Providing F.R.C. MH seat cover incl. carting to the
work site etc. comp. Directed. (GWSSB SOR-2009-
10, SOR Item Code-24015, Item 24.15 / Ch.
20 Drainage SOR Pg.50–54)
(A) FRC heavy duty cover size 730 mm. & 90 mm
thick circular cover 20 M.T. design load and frame
size 560 mm clear opening size 890 x 890 x
(B) FRC medium duty cover size 670 mm dia &
3 mm thick 10 M.T. load design and frame size 883.93 No.
560 mm clear opening outer size 780 x 780 x
(C) FRC medium duty Chamber seat cover (FRC)
cover 706 x 556 x 50 mm rectangular cover frame
size 600 x 450 mm clear opening outer size 816 x
2 (D)FRC light duty Chamber seat cover (FRC) 883.93 No.
cover with rectangular frame (LD-2.5)
Supplying Electric Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using
Operator, fuel, power Supply etc. Complete as
Directed. (No payment should be allowed for non
3 1071.43 Shift
working condition of machinery and for pipe line
excavation and M.H. work. Allowed only for break
down work) ( Based on Previously approved rate by
Levelling or orientation of existing gully trap
chamber incl. Nece. masonry in CM 1:6 and plaster
3 in CM 1:3 etc. using old G.T.stone and cover etc. 71.43 No.
comp. (GWSSB SOR-2009-10, SOR Item Code-
22 24005, Item 24.5 / Ch. 24, Drainage SOR Pg.38–40)
Providing and fixing 75 mm thick Tree Grating
950*950*75 mm as per design and drawing. The
rate shall be inclusive of providing and laying 50 to
80 mm thick average bedding layer of coarse sand
below tree grating as per required grading and
5 specification. The centre of the grating to be same 824.56 No.
as the centre of the tree trunk. The grating to be
pieces as per drawing. The work of the grating
blocks shall be executed in line and level by skilled
mason of flooring work only. (Sola Scienecity Road
23 tender Rate)
Gully Trap: Providing & fixing S.W. Gully trap with
C.I. grating brick masonry chamber & water tight
C.I. cover with frame of 300 mm x 300 mm size
(inside) with standard weight. (GWSSB SOR-2009-
10, SOR Item Code-24001, Item 24.15 / Ch.
24 Drainage SOR Pg.35–37)
(C) 300 mm x 300 mm Size Trap
Total Amount Rs.
Total Amount Rs.
Contractor'sSign Addl.C.E.
MobilNo:- (westzone
AHMEDABADMUNICIPALCORPORATIONENGINEERDEPARTMENT
TECHNICALSPECIFICATION
Nameof Work :- P/L paver block in the around the municipal anganwadi and in other municipal
building area in Sabarmati ward Of WZ .
GeneralTechnicalSpecificationSection
FollowingtechnicalspecificationsshallbeapplicabletotherelevantitemsofBOQ
Earth work in cutting in all sorts of soil & murrum incldg.conveyaning ,breaking clods spreading the stuff as &
where dire. With in a lead of 50 mt. from end of cutting.
The mode of payment for this item shall be on Cmt. Basis.
Conveyance charge of earth, lime, murrum, building rubbish, manure, garbage, sludge, excavated rock, fly ash, aggregates
of any kind Including spreading & levelling etc. complete.
The mode of payment for this item shall be on Cmt. Basis.
Item No.3 : Dismantling the following including loading, unloading and disposal of unserviceable material for all
lead or as directed by Engineer-In-Charge and stacking the serviceable material and backfilling the
resulting trenches and pits complete.
Mode of measurement.
(A) central verge -kerb stone
Mode of measurement
Measurement shall be paid by Rmt. basis
(B) Dismantling tiled or stone floors laid in mortar including stacking of serviceable material and
disposal of uservicalble material with all lead and lifts.
Mode of measurement
Measurement shall be paid by Smt. basis
(C) Demolition & disposal of unservisable material with all lead and lift for unreinforeced concrete.
Mode of measurement
Measurement shall be paid by Cmt. basis
(D) Demolition of brick work & stone masonry including stacking of serviceable materials and
disposal of unserviceable materials with all lead and lift (1) In cement mortar.
Mode of measurement
Measurement shall be paid by Cmt. basis.
(E) Demolition including stacking of serviceable materials and disposal of unserviceable materials
with all lead and lift. (I) R.C.C work.
Mode of measurement
Measurement shall be paid by Cmt. basis.
Extra rate over item of excavation of earth for excavation of asphaltpavement / RCC of thickness up to 0.20 meter including
demolishing the asphalt carpet, metal, soiling/cutting Reinforcement etc. comp. with stacking the material as directed. (a)
upto 0.20 meter thickness (By Manual)(b) 0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine
including cost of operator, fuel, & transportation etc complete.(c) 0.30 meter & above (By any type of Breaker Machine or
R.C.C. Cutter machine including cost of operator, fuel,& transportation etc complete.
The Item shall be carried out as per Item description and as per instruction of Engineer-in-Chargeand/or his authorized
representative.The rate ncludes the cost of excavation of bituminous macadam i.e. bituminous layers only like DBM,
BCetcincludingthelabours,tools, equipmentandallotherincidentalexpenses.NonBituminous Sub-layer/Subbaseare
notconsideredinthisitem. Work shall be carried out manually or by Machinery as per siter equirements.
Themodeofpaymentforthisitemshall beon Smt. Basis.
Supplying and fixing of 380 mm H x 300 mm L x 200 mm B Kerb block for Central Verge in M-20 grade using 20 mm nominal
size black trap aggregate of Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably exposed finish/
formwork, mould with well equipped with vibratory system for kerb stones of approved design including curing, etc.
complete, including the cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt, fixing the Kerb
stones in line and level on 5 cm thick sand bedding with necessary equipments and materials. The rate shall also include the
flush pointing in CM (1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed with
Bituminous concrete mixed in proper position as directed by Engineer in change to form a portable mixture. In any case Gravel
or such type of materials shall not be allowed for productiona) Laying on 5 cm thick Sand Bedding (R&B SOR-2023–24, Ch. 14 /
Supplying and fixing of 300 mm-L x 150 mm-B x 380 mm-H Kerb block for Footpath in M-20 grade using 20 mm nominal size black
trap aggregate of Sevaliya/Timba or equivalent quality for pre-cast blocks, reasonably exposed finish/ formwork , mould
with well equipped with vibratory system for kerb stones of approved design including curing, etc. complete, including the
cost of formwork etc. complete. The rate shall also include necessary cutting of asphalt, fixing the Kerb stones in line and level on
5 cm thick sand bedding with necessary equipments and materials. The rate shall also include the flush pointing in CM
(1:3) for all joints of the kerbstones. Filling of zari alone the sides of the kerb stone fixed with Bituminous concrete
mixed in proper position as directed by Engineer in change to form a portable mixture. In any case Gravel or such type of
materials shall not be allowed for production. a) Laying on 5 cm thick Sand Bedding .
Thespecifictionoffollowingmaterialsshallbeconformingwithspecificationmentionedforrelaventmaterial/itemsinGeneraltechnicalspe
cification for buildingworkofR&B DepartmentofGujarat.
Water shall conform to M-1
Graded stone aggregate 20 mm.nominal size to M-10
Contractor shall have to manufacture the blocks as per the dimensions given in the drawing. Specific machineries shall be used
tomanufacturetheprecastblocks.Thesemachineriesshouldbecompatibletoproduceblocksofrequiredstrengthanddimensions. The
machine shall contain hydraulic Press or advanced equipment to generate required compaction & Grade andfinish. Moulds/ Steel
Plates/ Dies of the machine shall be dimensionally checked & to be got approved before commencing theproduction. Contractor
shall prepare proper Drying Yard for keeping the blocks before curing. The drying yard shall be
levelledandcoveredsothatnoshrinkagecracksareformed.Contractorshallprepareadequatesizecuringpondtocuretheblocksfornotles
sthan21Days.Noothermeansofcuringshallbeallowed.ThetechnicalspecificationofconcreteshallconfirmtoIS456-2000. The concrete
mix is not required to be designed and only nominal mix as per IS: 456-2000 shall be followed. The proportionof the concrete mix
shall be 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm. nominal size) by volume.Concrete work shall have
fairly exposed concrete surface or as specified in the item. The designation ordinary M-10, M-15, M-20,M-25 specified as per I.S.
corresponds approximately to 1:3:6, 1:2:4, 1:1.5:3 and 1:1:2 nominal mix of ordinary concrete, byvolume respectively. The
ingredients required for ordinary concrete containing one bag of cement of 50 Kg. by weight (0.0342m3.) for different
proportions of mix shall be as per IS 456-2000. The proportion of the aggregate for the kerb stone shall bemodified as per the
approval of the engineer-in-charge. The water cement ratios shall not be more than those specified as per IS.The cement of the
mix shall be increased, if the quantity of water in a mix has to be increased to overcome the difficulties ofplacement and
compaction so that the water cement ratio specified in the table is not exceeded. The maximum size of coarseaggregate shall be
as large as possible within the limits specified but in no case greater than 1/4th of the minimum thickness
ofthemember,providedthattheconcretecanbeplacedwithoutdifficultysoastosurroundallreinforcementthoroughlyandtofill the
corners of the form. For reinforced concrete work, coarse aggregates having a nominal size of 20 mm. are generallyconsidered
satisfactory. Admixture shall be used in concrete only with approval of the Engineer-in-charge based upon theevidence that with
the passage of time, neither the compressive strength of concrete is reduced nor are other requisite qualitiesofconcrete impaired
bythe useofsuch admixtures.
Proportioning shall be done by volume, except cement which shall be measured in terms of bags of 50 kg weight. The volume
ofone such bag can be taken as 0.0342 m3. Boxes of suitable sizes shall be used for measuring sand and aggregate. The size of
theboxes (internal)shall be 30cm.x30 cm.and38 cm.deep. While measuring the aggregate andsand,the boxshall be filledwithout
shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry volume and in case of
dampsand;allowancesforbulkageshallbe made.
For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall be kept in first class
workingcondition and maintained throughout the construction. Measured quantity ofaggregate, sand, and cement required for
eachbatch shall be poured into the drum of the mechanical mixer while it is continuously running. After about half a minute of
dry-mixing, measured quantity of water required for each batch of concrete mix shall be added gradually and mixing continued
foranother one and a half minute. Mixing shall be continued till materials are uniformly distributed and uniform colour of the
entiremassisobtainedandeachindividualparticleofthecoarseaggregateshowscompletecoatingofmortarcontainingitsproportionate
amount of cement. In no case shall the mixingbe done for less than 2 minutes after all ingredients have been putinto the mixer.
Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before putting in a newbatch. Unless
otherwise agreed to by the Engineer-in-charge, the first batch of concrete from the mixture shall contain only2/3rds of normal
quantityof coarse aggregate. Mixing plant shall be thoroughlycleanedbefore changingfrom one type ofcement toanother.
The degree of consistency which shall depend upon the nature of the work and methods of vibration of concrete shall
bedetermined by regular slump tests in accordance with IS: 1199-1959. The slump of 10 mm. to 25 mm. shall be adopted
whenvibratorsare used.
All Moulds shall be cleaned and made free from standing water, dust, snow, or ice immediately before placing of
concrete.Formwork/MetalMould forexposed concrete surface(Ifindicated):
Allthemouldsshallbecheckedforexactdimensionsoftheprecastblocks.Alltheedgesoftheprecastblocksshallconfirmthe
profile of the final drawing & edges/ curvatures of the moulds shall be checked accordingly. Moulds shall be regularly checked
forcorrectnessofdimensionsofBlocks, twists, bendsdueto handling, etc.Beforestartingevery dayswork.
Care shall be taken to set all form work/Mould in perfect line, level (or in required camber or slope as specified) and plumb.
Formwork/Mould propping shall be strong, rigid, and sturdy. The form work/Mouldshall be as per pattern & design shown
indrawings. Form work/Mould shall be done accurately and precisely so as to achieve neat, clean and smooth concrete surface,
inline, level and plumb. Clinks, twists, offsets, warps, riveting etc. in plates or forms shall not be allowed. Before placing
concrete,forms shall be thoroughly cleaned off of all rust, dust, and loose materials. Colourless oil or grease of approved quality
shall beappliedbeforeplacingsteel.Alsotheformworkmaterialwillbeofwood/plywood/steeloranysortofsuchmaterial,as approved
by the Engineer-in-Charge and/or his authorized representative; so that all exposed concrete surfaces have uniformcolour.
Forallkindofexposedconcreteworkonlyonebrand(tobeapprovedbytheEngineer-incharge)ofcementshallbeused.
RemovalofMoulds:
Specific time shall be identified for removal of moulds, such that the concrete of the precast blocks shall gain strength
towithstand the stresses generated due to self weight and handling to drying yards without any deformation to shape/
dimensions/edges.
Sufficient time shall be given to the block after it is removed from the mould so that it can gain strength and dry in shade
toprevent anycracksdue to shrinkage. Thisshall be doneindryingyards.
Curingofblockshallbedoneonlyincuringpondandcuringshallbedoneforminimum14days.
Drying period after removing from pond & before delivery to site:Water should be drained of from the block before it is
actuallysent to the site. Time should be provided for proper draining of water which may be present in the block kept for curing
Precautionshallbetakenwhiletransportingoftheblocksto site.
Theblocksshouldbeloadedandunloadedwithduecaresoastoavoidgenerationofstressesleadingtobreakingofblock.Careshould be
taken toprevent the block from breakingduring transporting.
The pits of the size 150mm in width and required depth shall first be excavated, true to line and level. The relevant
specificationsof item A- 1 shall be followed for excavation work. The pits shall be filled with a layer of 50mm. thick sand bedding.
The curbsthen shall be placed in position of which 50mm. shall be below road. Care should be taken to maintain proper line and
level.Thejointsbetween thekerbsshallbepointed withC.M.1:2and curedforminimumsevendays.
Samplingandtestingofconcrete:
Samples from fresh concrete shall be taken as per IS : 1199-1959 and cubes shall be made, curedand tested at 7 days or
daysas per requirements in accordance with IS : 516-1959. A random sampling procedure shall be adopted to ensure that
eachconcrete batch shall have a reasonable chance of being tested i.e. the sampling should be spread over the entire period
ofconcretingandcoverallmixing units.
At least 1 sample shall be taken from each shift. Ten test specimens shall be made from each sample, 5 for testing at 7 days,
andthe remaining 5 at 28 days. The samples of concrete shall be taken on each day of the concreting as per above frequency.
Thenumber of specimens may be suitably increased as deemed necessary by the Engineer-in-charge when procedure of tests
givenabove reveals a poor quality of concrete and in other special cases. The average strength of the group of cubes cast for each
dayshall not be less than the specified cube strength of 200 Kg/cm2 at 28 days. 20% of the cubes cast for each day may have
valueless than the specified strength provided the lowest value is not less than 85% of the specified strength. If the concrete
made inaccordance with the proportions given for a particular grade, does not yield the specified strength, such concrete shall
beclassified as belonging to the appropriate lower grade. Concrete made in accordance with the proportions given for a
particulargrade shall not,however,be placedinahighergrade onthe ground thatthe teststrengthare higherthanthe
minimumspecified. If rock pockets/honeycombs in the opinion of Engineer-in-charge are of such an extent or character so as to
affect thestrength of the structure,materially or toendanger the life of the steel reinforcement, he may declare the concrete
defectiveand requirethe removalandreplacement oftheportionofthe structureaffected.
PrecastKerbStones:
The relevant specifications of concreting as per item above shall be followed except that work shall be carried out for
precastconcrete kerb stones as specified in the item. All Precast members shall be cast at workshop. Sufficient curing shall be
donebefore placement of the samethe method of transporting and placing the precast members shall be as approved by
theEngineer-in-charge. Members shall be so transported that no breakage or undue stresses are induced in them. If required,
allmembers shall have a key provided on both the faces i.e top and bottom surfaces, of adequate size so as to fill the same
withconcrete while laying. The function of this key is to avoid the leakage through the joint between the precast member and
thememberonwhichit islaid.
ModeofMeasurementsandPayment:
Therate shallinclude costof formworkandcost ofreinforcement. Thevolumeoccupiedbyreinforcement shallnot
bedeductedfromR.C.C.work.
The rate shall be for a unit of Rmt.
Providing and Laying of Rubber Moulded Paver Block Grey/Coloured 60 mm thick, M-35 Grade of any size ; shape (Usually Uni-
Paver Blocks) using black trap good quality aggragate of 20 mm nominal size for footpath, parking areas, service lanes
andother areas as mentioned in the drawing / instruction of Engineer-in-Charge and/or his authorized representative.
Costincludes formworks using rubber mould, Rate providing and laying paver blocks as per required grading and specification.
Thepaver block shall be mechanically compacted. The work of paving blocks shall be executed in line and level by skill mason
offlooring work only. It should be laid in such a way that the no cutting of the paver block to be necessary. if cutting of
paverblock necessary then it should be cut by machine only and carting. The finished surface of the paver block shall have
resonablygood, plain finished. Paver blocks shall be compacted and shall be relaid if necessary. Gravel or such type of
materials shall notbe allowedfor production.Layingon50mmthick sandbedding.
• Layingon50mmthicksandbedding.
Providing and laying of interlocking grey paver blocks of high density 80 mm thick made from M-40 grade concrete
using 6 mm to 20 mm machine crushed well graded stone aggregate, sand of approved quality, OPC 53 grade
cement with contractor's own concrete mix design as approved by AMC, for parking, road. Cost Includes
formwork, using rubber/FRP mould, laying paver block as per required grading and specification laid paver
block shall be mechanically compacted. The work of the paving blocks shall be executed in line and level by
skilled mason of flooring work only. It should be laid in such a way that the no cutting of the paver block to be
necessary. Cutting of paver block by machine cut only and carting to be done. The Finished surface of the Paver Block
shall have reasonably good plain finish. Paver blocks shall be compacted and shall be re-laid if necessary. Gravel or
such type of materials shall not be allowed for production. Laying on 5 Cms thick sand bedding.
Excavation and compaction up to 300 mm in height for footpath paving in all sorts of soil murrum includingsorting
outsandstackingofusefulmaterialsstuffupto 50mt.
The scope of work includes manufacturing, supplying, and lying of precast paver blocks at various Retail outlets. The
workincludes: Verification of the existing site condition and advising our project in charge to lay suitable base course if
required.Contractors are required to satisfy themselves with quality of sub grade, sub-base course before the paver blocks are
laid andsuggest strengthening ifrequired.
Clearing the site by removing all obstacles such as stones, debris etc. for laying of paver blocks. Manufacturing of paver blocks
inyour plant as per requirements in technical specification enclosed. Supplying of paver blocks at site, including handling at
Laying of paver blocks at site as per requirement in technical specification on 50 mm thick sand bedding, within shortest
possibletime the site is public place hence care should be taken to ensure that the routine activities should not be disturbed. The
job oflayingmayrequired tobe carried outduringnightalso.
TestingofpaverblocksshallthroughreputedGovt./NonGovt.Testhouseonlyandsubmissionoftestresultsasperrequirements in
Technical Specifications. AMC reserves the right to carryout test at random. Cost for such tests to be borne byparty. The
contractor shall guarantee that all material and components designed, fabricated, supplied, and laid by him shall befree from any
type of defect due to faulty material and/or workmanship/erection for a period of One year from the date ofcompletion
ofwork.However,thecontractorone year'sshallrender freemaintenance.
TECHNICALSPECIFICATIONS:
PaverBlockManufacturingFacilities:
ThePaverBlock shallbemadeinfactorywithfollowingminimumfacilities:
ConcreteBlockmakingMachines:
The machine shouldbe capable of producinghighqualityPaverBlocks byobtaininghighlevelof compactionbyapplication of
hydraulic compaction and also by high intensity vibration to the moulds. The machine should haveautomaticcontrol
foruniformityinstrength.
ConcreteBatching&MixingPlant:(Notessential)
The concrete Mix Design should be followed for each batch of materials. The concrete ingredient should be mixed
inconcrete Batching & Mixing plant with minimum capacity of 30 cum/hour. The plant should equipped with
automaticcontrol panel formaintaining watercement ratiofrombatch to batch to obtain concrete of uniform quality
andstrength.Theplantshouldbeequippedwithadequatemechanismformechanizedloadingofrawmaterialsintomixer
andconveyorbeltfortransportationofconcretefrommixertoconcreteblockmakingmachinetomaintainqualityofwet cement.
Thefactoryshouldhavewelldesignedcuringareatoensureadequatecuringofpaverblocks.
Laboratory(Desirablebutnotessential):
The testing equipment should have required in the Laboratory as perthe
following:ACompression testingmachineofadequate capacity.
Othertoolsandequipmentfortestingrawmaterialsandpaverblocks.
Systematic record of test results of various paver blocks manufactured in the
factory.ConcreteMixDesignfor variousgradeofconcreteusedformakingofpaverblocks.
SpecificationsForColouredPaverBlocks:
Coloured concrete paver blocks shall be manufactured as per attached specifications using or equivalent
approvedcolourPigmentof“BAYER”Make“BAYFERROXIRONOXIDEPIGMENTS”withminimumcolourpigmentof3%byweight
of cement. The colour shade shall be “RED” as selected by AMC before commencement of the work. White cement
shallbe used for colored pavers to obtain the desired colour shade. The job also includes providing 50 mm thick sand
beddingto matchthe shadeofthe paverblock.
Thecolourofthepaverblockshallbeguaranteedagainstfadingofcolourforperiodof12monthsfromthedateoflayingofthe
Allothertechnicalspecifications&Procedurefortesting,laying&samplingofcolouredpaverswillbeasperattachment.
PaversBlockCharacteristics:
The concrete pavers should have perpendicularities after release from the mould and the same should be retained
untilthe laying. The surface should be reasonably smooth and of anti skid and anti glare type. The paver should have
uniformchamfers to facilitate easy drainage surface run off. The pavers should have uniform interlocking space of 2mm
to 3mmto ensure compacted sand filling after vibration on the paver Surface. The concrete mix design should be
followed foreach batch of materials separately and automatic batching plant is to be used to achieve uniformity in
strength andquality.The pavers shall be manufactured in single layer only. Skilled labour should be employed for laying
blocks toensure line and level of laying, desired shape of the surface and adequate compaction of the sand in the joints.
Thepavers shall be of cement gray colour without any pigment & for coloured pavers refer “specifications for
colouredpave`” The pavers are to be skirted all round with kerbing using solid concrete blocks of size 150mm X 250mm X
380mm.The kerbing should be embedded for 100mm depth. The concrete used for kerbing shall be cured properly for
PaverBlockDimensions:
Shape Unipaver,IshapeordirectedbyAddl.C.E.
Chamfer 4mmto6mmalongtopedges
Colour Naturalcementgreycolourwithoutuseofanypigment.
Forcolouredpaversrefer“specificationsforcolouredpavers”
DimensionalTolerance (+/-)2mmforlength&width,
(+/-)3mmforHeight(Thickness)
TestingofPaverBlocks:
SR.NO *TEST AverageValues Frequency
1. CompressiveStrength Min.35N/Sqmmfor60mm 250Smt/1Test
2. FlexuralStrength Minimum4.5N/Sqmm
3. AbrasionResistance Maximum1.5
4. WaterAbsorption Maximum5.80%
*Samplingandtestingprocedureasperenclosedspecifications
SamplingandTestingProcedureforPaverBlocks
INTERNAL–Averageofminimum3samplesper 5000Blocks.
SamplingforTesting
SamplingofPaverblocks.
Methodofsampling :
Before laying paver blocks, each designated section comprising not more than 50000 blocks, shall be divided into
tenapproximately equalgroups. Threeblocksshallbe drawnfrom each group.
Markingandidentification:
All samples shall be clearly marked at the time of sampling in such a way that the designated section of part thereof,
andtheconsignmentrepresentedbythesample,areclearlydefined.
The sample shall be dispatched to the approved test laboratory taking precaution to avoid damage to the paving intransit. Protect
the paving from damage and contamination until they have been tested. The testing shall be carried assoon as possible, after the
sample has been taken. As soon as practicable after sampling. The samples shall be stored inwaterat20degreeC5 degreeC for24
hourspriortotesting.
The item is to be executed as per instructions and to the entire satisfaction of Engineer-in-Charge and/or his
authorizedrepresentativeusingRubbermould andTablevibratorforKerb instead ofmechanicalpresssystem.
Extra rate for excavation of asphalt payment of any thickness including demolishing the asphalt carpet, metal, soling etc.complete
with stacking the materials as directed. The road surface of asphalt shall carefully be opened to full width asdirected by the
Engineer-in-Chargeand/or hisauthorizedrepresentative.
Excavationareashallbeproperlyidentifiedandmarkedinrectangularshape.Theroadcrustshallbeopeneduptoentire depth i.e. including
soling. All the materials shall be separately deposited in such a way and in places as may bedetermined by the Engineer-in-Charge
and/or his authorized representative. In case rubble not being so deposited orbeing mixed up with the excavated materials will
not be allowed for refilling. The cost of materials shall be charged fromthecontractor.The decision oftheC.E.shall befinal and
bindingtothecontract
For detailed specification for Laying of Paver Block on sand bedding, refer R & B Department booklet for
GeneralTechnicalSpecificationforbuilding works.
Therate shallbefor aunitofSMT
Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10- graded brick bat aggregates 40mm nominal
size)and curingcomplete.
Before starting the concrete the bed of the foundations trenches shall be cleared of all loose materials and watered and
rammedas directed. The proportion of cement, sand and hand broken stone aggregates shall be one part of cement, 5 parts of
coarsesand, 10parts of hand broken stone aggregates and shall so measured by volume. The concrete shall be mixed in a
mechanicalmixer at the site of work. Hand mixing may however be allowed for smaller quantity of work if approved by the
Engineer-incharge.WhenhandmixingispermittedbytheEngineer-
inchargeincaseofbreakdownofmachinery’sandintheinterestofthe work. itshall be carriedout on a water tight platform and care
shall be taken to ensure that mixing is continued until themass is uniform in colour and consistency. The quantity of water
shall be sufficient to produce a dense concrete of requiredworkability for the purpose. The concrete shall be handled from the
place of mixing to the final position in not more than 15minutes by the method as directed and shall be placed into its final
position, compacted and finished within 30 minutes of mixingwith water i.e. before the setting commences. The concrete shall
be laid in layers of 15 cms. to 20 cms. The concrete shall berammed with heavy iron rammers and rapidly to get the required
compaction and to allow all the gaps to be filled with mortar.After the final set, the concrete shall be kept continuously wet, if
required by pounding for a period of not less than 7 days fromthe date of placement The concrete shall be measured for its
length breadth and depth, limiting dimensions to those specified onplan or asdirected.
ModeofmeasurementsshallbeonCMTbasis
Item No.13 Providing TMT Bar FE500D reinforcement for R.C.C. Work including bending,binding and placing in position
complete upto floor two level
Mode of measurement
Measurement shall be paid by KG.. basis
Item No.14 Providing and Casting in situ ordinary cement concrete M200 for R.C.C. Raft and cutt off walls
including necessary shuttering laying, vibrating, ramming and curing complete.(B) Walls, fom top of
foundation level upto floor two level
Mode of measurement
Measurement shall be paid by cmt.. basis
Item No.15 abour work for fixing any kind of paving with cement pointing in CM 1:2, including watering, ramming
etc comp. as directed For pavement
a. Laying on Sand bedding as per requirement to fix the C.C.Block / Nibhada Stone in Line & Level.
Mode of measurement
Measurement shall be paid by smt.. basis
b. For Water Table & Kerb on Sand bedding as per requirement to fix the C.C.Block / Nibhada Stone in Line &
Mode of measurement
Measurement shall be paid by Rmt.. basis
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers in sub-
base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Codal
Production & Supply of WMM to site of
worksLayingof WMM
This work shall consist of laying and compacting clean, crushed, graded aggregate and granular material, premixed with water,
toa dense mass on a prepared sub-grade/sub- base/ base or existing pavement as the case may be in accordance with
therequirements of these Specifications. The material shall be laid in one or more layers as necessary to lines, grades and cross-
sectionsshownon the approved drawingsorasdirected bytheEngineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than 75 mm. When vibrating or other
approvedtypes of compacting equipment are used, the compacteddepth of a single layer of the sub-base coursemay be upto
mmwith the approval ofthe Engineer.
PhysicalRequirements
Coarseaggregatesshallbecrushedstone.TheaggregatesshallconformtothephysicalrequirementssetforthinTable19-1.
Sevaliya/Timba/Ankodiya special aggregate is only acceptable.
Ifthewaterabsorptionvalueofthecoarseaggregateisgreaterthan2percent,thesoundnesstestshallbecarriedoutonthematerialdelivered
to site asperIS:2386 (Part-5).
Table19-1:PhysicalRequirementsofCoarseAggregatesforWetMixMacadamforSub-base/BaseCourses
S.No. Test TestMethod Requirements
1. LosAngelesAbrasionvalueorA IS:2386(Part-4) 40percent(Max.)
ggregateImpact value
IS:2386(Part- 30percent(Max.)
2. CombinedFlakinessandElongationindices(To IS:2386(Part-1) 35percent(Max.)*
* To determine this combined proportion, the flaky stone from a representative sample should first beseparated out. Flakiness index is weight of flakystone
metal divided by weight of stone sample. Only the elongated particles be separated out from the remaining (non-flaky) stone metal. Elongation index
isweightofelongatedparticlesdividedbytotalnon-flakyparticles.Thevaluesofflakinessindexandelongationindexsofoundareaddedup
GradingRequirements
TheaggregatesshallconformtothegradinggiveninTable19-2.
Table19-2:GradingRequirementsofAggregatesforWetMixMacadam
ISSieveDesignation PercentbyweightpassingtheISSieve
Materialfinerthan425 micronshallhavePlasticityIndex(PI)notexceeding6.
The final gradation approved within these limits shall be graded from coarse to fine and shall not vary from the low limit on
onesievetothehighlimit ontheadjacentsieve orviceversa.
Construction Operations:-
Preparation ofBase
The surface of the sub-grade/sub-base/base toreceive the Wetmixmacadam courseshall be preparedtothe specifiedgradeand
camber and cleaned of dust, dirt and other extraneous material. Any ruts or soft yielding places shall be corrected in anapproved
manner and rolleduntil firmsurface isobtained.
Where the Wet mix macadam is to be laid on an existing metalled road, damaged area including depressions and potholes
shallbe repaired and made good with the suitable material. The existing surface shall be scarified and re-shaped to the required
gradeand camberbeforespreadingthe coarseaggregate forWetmixmacadam.
PreparationofMix
WetMixMacadamshouldbepreparedinanapprovedmixingplantofsuitablecapacityhavingprovisionforcontrolledadditionof water
and forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching plant.For small quantity ofwet
mixwork,theEngineermay permitthemixingtobedone in concrete mixers.
Quantityof watershouldnotvaryfrom OMC determinedas perIS : 2720 (partVIII)bymore thanagreedlimit.The mixedmaterialshould
be uniformly wetand nosegregation should be permitted.
Immediately after mixing, the aggregates shall be spread uniformly and evenly upon the prepared subgrade/sub-base/base
inrequired quantities. In no case should these be dumped in heaps directly on the area where these are to be laid nor shall
theirhaulingover a partlycompleted stretchbe permitted.
The mix may be spread either by a paver finisher or motor grader or as per instruction of Engineer-in-Charge and/or
hisauthorized representative. For portions where mechanical means cannot be used, manual means as approved by the
Engineershall be used.The motor grader shall be capable of spreading the material uniformly all over the surface. Its blade shall
havehydrauliccontrolsuitableforinitialadjustmentsandmaintainingthesame soasto achievethespecifiedslopeand grade.
Thepaver finishershallbeself-propelled,havingthefollowingfeatures:
(i) Loadinghoppersandsuitabledistributionmechanism
screedshallhavetampingandvibratingarrangementforinitialcompactiontothelayerasitisspreadwithoutruttingorotherwisemarringth
e surface profile.
(iii) Thepavershallbeequippedwithnecessarycontrol mechanismsoas toensurethatthefinishedsurfaceisfreefrom surfaceblemishes.
The surface of the aggregate shall be carefullycheckedwithtemplates andall high or low sports remediedbyremoving oradding
aggregate as may be required. The layer may be tested by depth blocks during construction. No segregation of layer
andfineparticlesshouldbeallowed.Theaggregatesasspreadshouldbeofuniformgradationwithnopocketsoffinematerials.
Afterthemixhasbeenlaidtotherequiredthickness,gradeandcrossfall/camberthesameshallbeuniformlycompacted,tothefulldepthwith
suitableroller.Ifthethicknessofsinglecompactedlayerdoesnotexceed100mm,smoothwheelrollerof80to
100 kN weight may be used. For a compacted single layer upto 200 mm, the compaction shall be done with the help of
vibratoryrollerofminimum staticweightof80to100kNorequivalentcapacityroller.Thespeedoftherollershallnotexceed5km/h.
In portions having unidirectional cross fall/superelevation, rolling shall commence from the lower edge and progress
graduallytowards the upper edge. Thereafter, roller should progress parallel to the centre line of the road, uniformly over-lapping
eachpreceding trackbyatleastone thirdwidthuntil theentire surfacehas beenrolled.Alternate trips of the rollershallbeterminated
instopsatleast 1m away from any preceding stop.
In portions in camber, rolling should begin at the edge with the roller running forward and backward until the edges have
beenfirmly compacted. The roller shall then progress gradually towards the centre parallel to the centre line of the road
uniformlyoverlappingeach oftheprecedingtrack by at least one-third width untiltheentiresurfacehasbeen rolled.
Any displacement occurring as a result of reversing of the direction of a roller or from any other cause shall be corrected at
onceasspecifiedand/or removedandmade good.
Along forms, kerbs, walls or other places not accessible to the roller, the mixture shall be thoroughly compacted with
mechanicaltampers or a plate compactor. Skin patching of an area without scarifying the surface to permit proper bonding of the
addedmaterialshall notbepermitted.
Rolling should not be done when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-
base/basecourse or subgrade. If irregularities develop during rolling which exceed 12 mm when tested with a 3 metre straight
edge, thesurface should be loosened and premixed material added or removed as required before rolling again so as to achieve a
uniformsurfaceconformingtothedesiredgradeandcrossfall.Innocaseshouldtheuseofunmixedmaterialbepermittedtomakeupthe
depressions.Rolling shall be continued till the density achieved is at least 98 per cent of the maximum dry density for
thematerialasdetermined by the method outlinedin IS :2720(Part-8).
Aftercompletion,thesurfaceofanyfinishedlayershallbewell-closed,freefrommovementundercompactionequipmentorany
compaction planes, ridges, cracks and loose material. All loose, segregated or otherwise defective areas shall be made goodto
the fullthicknessofthelayer andrecompacted.
Settinganddrying:
Afterfinalcompactionofwet mixmacadamcourse,theroadshallbeallowedtodryfor24hours.
OpeningtoTraffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix macadam surface till it has dried and
thewearingcourse laid.
Surface Finish and Quality Control of
WorkSurface evenness:
ThesurfacefinishofconstructionshallconformtotherequirementsofClauseinItemNo.16&17&18.
Qualitycontrol:
ControlonthequalityofmaterialsandworksshallbeexercisedbytheEngineerasperTable19-3.
Table19-3:TestandFrequencyforMaterialsforWetMixMacadam
Type Test Frequency ISCode
ofConstructi (Asper CircularNo.66)
Wet Gradation Onetestper200Cu.m. IS:2386,Part-I-1963
MixMacada AggregateImpactValue Onetestper1000Cu.m. IS:2386,Part-IV
Combined Flakiness Onetestper500Cu.m. IS:2386,Part-I
andElongationIndices
Atterberg Limits of portion Onetestper200Cu.m. IS:2720,Part-V
ofaggregatespassing
Densityofcompactedlayer Onesetofthreetestsper IS:2720,Part-VIII
RectificationofSurfaceIrregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible tolerances or where the course
isotherwise defective due to subgrade soil getting mixed with the aggregates, the full thickness of the layer shall be scarified
overthe affected area, reshaped with added premixed material or removed and replaced with fresh premixed material as
applicableand recompacted. The area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide. In no case
shalldepressionsbefilledup withunmixed andungraded materialor fines.
ArrangementforTraffic
Duringtheperiodofconstruction,arrangementsforthetrafficshallbeprovided.TheContractorshalltakeallnecessarymeasures for the
safety of traffic during construction and provide, erect and maintain such barricades, including signs, marking,flags, lightsand
flagmenasper instruction oftheEngineer-in-charge.
MeasurementsforPayment
Therateshallbe foraunit ofonecubic meter.
Colour Washing with lime on all wall surface (two coat) over and including a primary coat of white washing t ogive an even
shade after through brooming the surface to remove all dirt,dust,mortasr drops and other foreigh matter.
Mode of measurement
Measurement shall be paid by Smt. basis.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3
and fixing C.I. steps and existing chamber sheet cover, removing the debris from chamber and carting the same as directed.
Therateshallbe foraunit of No BASIS.
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and repairing by brick masonry in
C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH sheet cover, removing the debris from MH and carting the
same as directed (A) up to 0.15 mt. (@ Two Coarse) (B) up to 0.35mt. (@ Four Coarse) C) up to 0.65 mt. (@ Seven Coarse)
Therateshallbe foraunit of No BASIS.
Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
(A) FRC heavy duty cover size 730 mm. & 90 mm thick circular cover 20 M.T. design load and frame size 560 mm clear opening size
890 x 890 x 120 mm. B) FRC medium duty cover size 670 mm dia & 70 mm thick 10 M.T. load design and frame size 560 mm
clear opening outer size 780 x 780 x 120 mm (C) FRC medium duty Chamber seat cover (FRC) cover 706 x 556 x 50 mm rectangular
cover frame size 600 x 450 mm clear opening outer size 816 x 666 x 100 mm (D)FRC light duty Chamber seat cover (FRC) cover
with rectangular frame (LD-2.5)
Therateshallbe foraunit of No BASIS.
Supplying Electric Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by using Operator, fuel, power Supply etc.
Complete as Directed. (No payment should be allowed for non working condition of machinery and for pipe line excavation and
M.H. work. Allowed only for break down work) ( Based on Previously approved rate by C E sir )
The rate shall be for a unit of shift BASIS.
Levelling or orientation of existing gully trap chamber incl. Nece. masonry in CM 1:6 and plaster in CM 1:3 etc. using old G.T.stone
and cover etc. comp.
Therateshallbe foraunit of No BASIS.
Providing & Fixing 75 mm thick Tree Grating 950*950*75 mm as per design and Drawing . The rate shall be inclusive of
providing and Laying 50 to 80 mm thick average bedding layer of coarse sand below tree grating as per required grading and
specification . the centre of grating to be same as the centre of the tree trunk. The grating to be 8 pieces as per drawing. the
work of the grating blocks shall be executed in line and level; by skilled mason of flooring work only .(Sola Science City Road
Mode of measurements shall be on No basis.
Gully Trap: Providing & fixing S.W. Gully trap with C.I. grating brick masonry chamber & water tight C.I. cover with frame of
mm x 300 mm size (inside) with standard weight. (C) 300 mm x 300 mm Size Trap
Mode of measurements shall be on No basis.
I HAVE ALSO GONE THROUGH TECHNICAL SPECIFICATIONS FOR THE ITEMS (AS PER STANDARD P.W.D. TECHNICAL
SPECIFICATION FOR THE ITEMS AND ALSO I HAVE THE BOOK OF THE SAME) AND AGREE TO ABIDE BY THEM.
IN CASE OF WHERE IS NO TECHNICAL SPECIFICATION FOR THE ANY ITEMS AVAILABLE, SPECIFICATION GIVEN BY THE
ENGINEER-IN-CHARGE SHALL BE FOLLOWED AND FOR THE SAME I AGREE TO ABIDE BY THEM.
Seal and Signature of the Bidder Add.City Engineer (WestZone)
Amdavad Municipal Corporation
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
bntldh muJtmœl – œrûtK vrùbÍtul
vrùb Ítul Ítulj ytuVem,
1. Wvhtuf< xuLzhtu su <u Jdobtk btLg hSMx[uNl ^htJ<t ftuLx[tfxh©eytuyu ChJt.
2. xuLzhle rlg< xuLzh Ve <&t R.yub.ze. ck^ fJhbtkk Wvh lt mhltbu ÁcÁ / hSMxh yu.ze./ MvezvtuMx/ fwhegh&e rlg< mbgbtk btufjJtlt hnuNu.
3. ftuLx[tfxh©eytuyu xuLzhle mt&u BGþrlrmvj btLg hSMx[uNlle/ dJobuLx hSMx[uNlle ftuve, (xuLzh ftuve <&t yLg vwhtJt mt&u) yawf mtbuj
fhJtle hnuNu ylu fJh Wvh xuLzh lkch <&t ftuLxufx lkch sYh MvÐ œNtoJJtltu hnuNu.ck^ fhJh Wvh xuLzh ltuxem lkch, xuLzh lkch, ftblwk ltb
<&t, ftuLx[[tfxhle mkM&tlwk ltb <&t ftuLxufx lkch yJ~g œNtoJJtlt hnuNu. ftuLx[tfxhtuyu xuuLzhbt cukfl wltb, Ft<t lkch, btRfh lkch ylu
mhltb wMvÐ yûthtubtk jFJw.
4. xuLzh Ve vu ytuzoh / zebtLz z[tVx&e aqfJJtlehnuNu. œhuf xuLzh œeX yjd xuLzh xuLzhVe ChJtle hnuNu.
5. ytuAe hfble xuLzh Ve, R.yub.ze. fu xuLzh Ve, R.yub.ze. ÂJltlt xuLzhtu hœct<j (fuLmj) dKtNu.
6. xuLzh mt&u BþfJtbtk ytJ<e yluoMxble, xuLzhle hfblt 1% «btKu cukf duhLxe / zebtLz z[tVx / vu ytuzoh / jtufj btRfh auf&e s MJefthJtbtk
ytJNu. œhuf xuLzh œeX yjd R.yub.ze. ChJtle hnuNu. R.yub.ze. hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf,
rzbtLz z[tVx, vu ytuzoh fu cukf duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu R.yub.ze.le hfb btºt rzbtLz z[tVx, vu
ytuzoh fu ckuf duhkxelt MJYvbtk ytvJtle hnuNu.
7. cukf duhuLxe btºt ybœtJtœ Nnuhle s MJefthJtbtk ytJNu.
8. xuLzh Ve <&t R.yub.ze.le hfblt ze.ze./ aufle vtA¤ ftuLx[tfxh©eyu vtu<tle mkM&tlwk ltb <&t btuctRj lkch yJ~g jFJtltu hnuNu. ftuLx[t¾xhu
vtu<tle mkkM&tlt auf <&t ze.ze. xuLzh R~gw > <theF ctœlt s ytvJt.
9. Nh<e xuLzhtu hœ ct<j dKtNu.
10. stu xuLzhbtk MvÐ WÕjuF fhtguj ntug <tu atubtmtlu fthKu Ft<tfeg MËalt yLJgu ßgthu ßgthu ftb ck^ htFJtLþk &tg <u mbglu ftble BþÆ<btk bshu
ytvJtbtk ytJNu. vhkðþ yt yLJgu ftuE CtJ J^thtu ytvJtbtk ytJNu lne. sule ltuk^ >huf xuLzhh ujuJe.
11. xuuLzhtu ftuEvK fthK ytÃgt rmJtg MJefthJt fu lrnk MJefthJt <ule mkÃËKo m•tt BGþrlrmvj frbNlh©ele hnuNu.
12. xuLzhbtk stu ftuR mwDtht JDtht ntug <tu <u ykd xuLzh Ch<t vnujt AuÕju œJmu rlg< JucmtRx y&Jt fauheyu sYhe <vtm fhelu s xuLzh btufjJw.
13. mefgtuhexe zevtuÍex/ vVtuboLm duhuLxele hfb Yt. yuf fhtuz mwDele ykœtS< hfblt ftb btxu jtufj btRfh auf, rzbtLz z[tVx, vu ytuzoh fu cukf
duhkxelt MJYvbtk <&t Yt. yuf fhtuz&e Wvhle ykœtS< hfblt ftb btxu mefgtuhexe zevtuÍex/ vhVtuboLm duhkxele hfb btºt rzbtLz z[tVx, vu ytuzoh
fu ckufduhkxelt MJYvbtk ytvJtle hnuNu.
14. ytuljtRl yul-«tufgwh JucmtRx vh&e ChJtlt &<t xuLzhbtk ftuLx[tfxh/ yusLmeyu xuLzhle ntzo ftuvebtk CtJ Cgto Jdhle mne mefft fhe
mcbex fhJtle hnuNu. stu <ubtk CtJ Chuj nNu <tu <uJt xuLzh hœ fhJtbtk ytJNu.
15. dwsht< mhfth ©b,ftuiNÕg ylu htusdth rJCtd îtht XhtJ ¢btf:LED/WRT/e-file/11/2024/0293/M2 mraJtjg ,dtk^eldh
<t.15.02.24 lt XhtJ v{btKu yusLme/¢tuLx[fxhtulu îtht ©bgtude ftgœtle studJtR vhevqKo &tg <u mwrlµ< fhJtlwk hnNu.
16. mœh xuLzhbtk ” GST rl<e rlgb bwsc jtdw vzNu ” <u bwsc dK<he fhe xuLzhtu ChJtlt hnuNu.
zebtLz z[tVx / auf “BgwÂlÂmvj fÂb§h©e, ybœtJtœ” lt ltbltu fZtJJtu.
ybœtJtœ BgwÂlÂmvj ftuvtuohuNl
yu.yth.me. xuLzh- Nh<tu
1. yu.yth.me. xuLzhbtk Jfoytuzh ytÃgt ctœ ftb NY fhJtle mbgbgtoœtbtk ftuLx[tfxh îtht ftb NY fhJtle òK fgto ctœ
24 fjtflt ftb NY lrn fhJtbtk ytJu <tu yLg ftuLx[tfxh vtmu btfuox hux&e ftuLx[tfxhlt Faou ylu stuFbu ftbdehe
fhtJJtbtk ytJNu.
2. ftuLx[tfxhlu Jfoytuzoh ytÃgt ctœ yu.yth.me. «fthlkw xuLzh ntuR ftble sYhegt< bwsc xujeVtulef òK fhe su <u ftb NY
fhJt fnuJtbtk ytJNu ylu su ftble òK fgtolt 24 fjtfbtk NY fhJtbtk lrn ytJu ylu rlg< mbgbgtoœtbtk vwKo fhJtbtk
lrn ytJu <tu su <u ytRxblt SOR CtJ&e 1.5 dKe vulÕxe Jmwj juJtbtk ytJNu.
3. ºtK fu J^w Jth Wvh bwscle yLg ftuLx[tfxh vtmu&e ftbdehe fhtJJtle Vhs vzNu ylu/y&Jt ºtK fu J^w Jth vulÕxe
fhJtle Vhs vzNu <tu <u mkstudtubtk ftuLx[tfxhlu çjufjeMx fhJtbtk ytJNu sule ykr<b m•tt Bgw.frb¹lh©elu hnuNu.
AHMEDABAD MUNICLPAL CORPORATION
MAHANAGAR SEVA SADAN
Clause : 1 Contractor shall not employ any child having age 5 to 15 years as it is prohibited by Child Labour Prohibition and Regulation
Act 1986. Hon'ble Supreme Court has given certain guide lines and as per the guide lines. If child labour is employed on the site work,
the contractor shall have to deposit Rs. 20,000.00 (Rupees Tw enty thousand only) in the child labour welfare fund. If the employer
refuses to deposit then action will be taken for contempt of Supreme Court Judgement and also will be prosecuted by concerned
authority. Because of the breach of any provision of child labour prohibition and regulation Act 1986 by the Contractor & Municipal
Corporation becomes liable to pay any amount then the Municipal Corporation shall recover the said amount from the contractor.
Clause : 2 The Standing Committee has decided to deduct 1/2% amount from each running bill as per its Reso. No. 1783 Date 06--02-
97, but the Municipal Corporation Board has recently decided that the actual testing charge is taken and the remaining amount is
refundable at the time of final bill (As per Muni. Board Reso. No. 123 dated 25-02-97)
Clause : 3 Contractor has to follow prevailing Labour act and has to maintain labour register acordingly,and has to follow other
Clause : 4 Quantity taken in tender are tentative and may differ as per execution of work. No claim shall be entertain regarding
* MODIFICATION OF DOCUMENTS
Modification of specifications and correction/corrigendum in respect of the work if required will be made by A.M.C. The same shall
be placed on A.M.C website which may be downloaded by the tendrers enclosed along with the tender duly signed. These shall form
a part of tender. The tenderer shall not add or amend the text of any of the documents except in so far as may be necessary to
comply with any addendum.
* ADDENDAUM/CORRIGENDUM .
Addendum or corrigendum conveying any change or correction in respect of the work shall form the part of the contract documents.
The full consideration shall be given to such addendum or corrigendum or correction before submission tender duly filled in by the
contractor. Therefore, the contractor shall have to watch such addendum or corrigendum or correction published by A.M.C through
its website www.egovamc.com. Tenderes shall verify the number of addendum issued and enclose the same with the tender
documents,failing which the tender shall be liable for rejection and no any complaint in respect to this shall be entertained under any
Clause : 5 SCHEDULE OF MAINTENANCE
To keep paver blocks and footpaths durable, safe, and aesthetically pleasing, a structured maintenance schedule is essential. Pavers are
"interlocking" systems, meaning their strength relies on the sand in the joints; if the sand disappears, the blocks move and eventually
Below is a comprehensive maintenance and repair schedule categorized by frequency.
1. Common Defects & Repair Actions
When inspections reveal issues, use this guide to determine the repair method:
A. Sunken or Uneven Blocks (Settlement)
Cause: Poor base compaction or water washing away the bedding sand.
Repair: 1. Carefully lift the affected blocks using a flat-head screwdriver or paver extractor.
2. Add additional bedding sand to the base and compact it.
3. Re-install the blocks and sweep new sand into the joints.
B. Missing Joint Sand (The "Linchpin" of Pavers)
Cause: Rain, wind, or aggressive power washing.
Repair: Sweep Polymeric Sand into the joints. This sand contains a binder that hardens when misted with water, making it
resistant to washouts and weeds.
C. Cracked or Chipped Blocks
Cause: Heavy vehicle impact or freeze-thaw cycles.
Repair: Individual blocks should be replaced. This is why it is recommended to keep "attic stock" (extra blocks) from the
original installation to ensure a color match.
2. Checklist for Footpaths
Contractor shall execute maintenance works as directed by the client and through self-inspection under the instruction of
Engineer-In-Charge.
Surveying of footpaths and paver blocks shall be undertaken as and when required on the designated roads and chawls, as
instructed by Engineer-In-Charge.
The inspection schedule shall be aligned with the following categories of complaints, with priorities determined by the
Engineer-In-Charge:
o CCRS complaints
o Complaints from MLSs/ Councilors
o Complaints from Officials
The specific roads and chawls shall be surveyed as per below schedule as specified.
o The contractor shall visit the ward office once a week to obtain details of the roads scheduled for inspection
and conduct a survey of footpaths and paver blocks, as directed by the Engineer-in-Charge (EIC)
The Contractor shall adhere to the maintenance schedule outlined in the tender documents and comply with the prevailing
AMC circulars of SOM issued from time to time.
Contractor's Sign Addl.C.E.(westzone)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender No. 64.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .