Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAccepted-AOC JHIWAREDI KARBARI DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹1.9 Cr | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹1.9 CrRejected-Finance VILL UPPER NATHANPUR PO NEHRUGRAM NR AMBIWALA GURUDWARA DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.9 Cr | L2 | Rejected-Finance NOT QUALIFIED |
| 3 | L3₹1.9 CrRejected-Finance | ₹1.9 Cr | L3 | Rejected-Finance NOT QUALIFIED |
| Sl No | Description | Qty | Unit | Namdev And Sons L3 | BIJENDRA KUMAR POKHRIYAL L2 | Shashi Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00SUPPLY OF MATERIAL PORTION | ||||||
| 2.00 | STAY CLAMP FOR SP-33 WITH NUT & BOLT | 45 | NOS | 15,750 ₹15,750 | 18,000 ₹18,000 | 20,250 ₹20,250 |
| 3.00 | PP & CLAMP WITH N&B ST POLE SP-33 | 24 | NOS | 9,600 ₹9,600 | 9,840 ₹9,840 | 12,960 ₹12,960 |
| 4.00 | Bracing Clamp For ST SP33 Top With N&B | 16 | NOS | 4,800 ₹4,800 | 6,400 ₹6,400 | 7,200 ₹7,200 |
| 5.00 | BRACING CLAMP FOR ST POLE WITH
N&B | 16 | NOS | 4,800 ₹4,800 | 6,400 ₹6,400 | 7,200 ₹7,200 |
| 6.00 | 33 KV Tension clamp with Bail & IPC | 261 | NOS | 10,44,000 ₹10,44,000 | 10,44,000 ₹10,44,000 | 11,48,400 ₹11,48,400 |
| 7.00 | 33 KV Cable ties for Pin insulator | 399 | NOS | 13,56,600 ₹13,56,600 | 9,97,500 ₹9,97,500 | 11,97,000 ₹11,97,000 |
| 8.00 | 33 KV IPC for covered to covered conduct | 168 | NOS | 5,88,000 ₹5,88,000 | 7,39,200 ₹7,39,200 | 7,22,400 ₹7,22,400 |
| 9.00 | 33 KV IPC for covered to Bare conductor | 50 | NOS | 1,80,000 ₹1,80,000 | 1,80,000 ₹1,80,000 | 1,80,000 ₹1,80,000 |
| 10.00 | 33 KV Mid span jointing kit | 35 | NOS | 1,22,500 ₹1,22,500 | 94,500 ₹94,500 | 1,13,750 ₹1,13,750 |
Tender Value
Refer Docs
EMD Value
₹3.9 L
Closing Date
6 Feb 2026, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
Replacement of 33 KV bare line by AAAC covered conductor from Langasu to Nandprayag against Capital (SI) Head under EDD Gopeshwar on Semi-Turnkey basis
2026_UPCL4_91163_1
38/EDC(K)/2025-26
Open Tender
Repair and Maintenance Works
180 days
GOPESHWAR
AS PER NIT
3 documents required · 3 mandatory
₹11,800
EE EDD GOPESHWAR
₹3.9 L
6 Jun 2026
21 Jan 2026
7 Feb 2026
21 Jan 2026
6 Feb 2026
22 Jan 2026
SUPPLY OF MATERIAL PORTION
STAY CLAMP FOR SP-33 WITH NUT & BOLT
PP & CLAMP WITH N&B ST POLE SP-33
Bracing Clamp For ST SP33 Top With N&B
BRACING CLAMP FOR ST POLE WITH N&B
33 KV Tension clamp with Bail & IPC
33 KV Cable ties for Pin insulator
33 KV IPC for covered to covered conduct
33 KV IPC for covered to Bare conductor
33 KV Mid span jointing kit
IPC with aluminium bail for earthing
33KV Polymer Tension Insulator
33KV Polymer Pin Ins.(For Convered Cond)
33KV AAAC COVERED COND. AL-59, 160 SQMM.
LABOUR PORTION
CONSTRUCTION OF RETURNING WALL & PLINTH
CHEMICAL EARTHING
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 33 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-33 POLE
ERECTION OF SP-33 DOUBLE POLE
GROUTING OF POLE
CARTAGE SP-33 POLE, 71-100 KM
CARTAGE OF PETTY MATERIAL,71-100 KM
HEADLOAD CARTAGE SP-33 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
BACK CARTAGE OF PETTY MATERIAL,151-200KM
DISMANTLING OF 33KV LINE WITH EARTH WIRE
FIXING OF 33 KV TENSION CLAMP WITH IPC
FIXING OF 33 KV IPC FOR CC TO CC COND.
FIXING OF 33 KV IPC FOR CC TO BARE COND.
FIXING OF 33 KV MID SPAN JOINTING KIT
FIXING OF IPC WITH AL. BAIL FOR EARTHING
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
FIXING OF 33KV CABLE TIES
FIXING OF DISC INS. FOR AAAC CONDUCTOR
FIXING OF 33KV PIN INSULATOR
LAYING, SAGGING OF COVERED COND FOR 33KV
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
TENDERDOCUMENT38.pdf
Tender Documents • 1.12 MB
BOQ_107986.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid