| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.9 LAccepted-AOC | L1 | Accepted-AOC BEING THE LOWEST BIDDER | |
| 2 | L2₹46.5 L+₹3.6 L (8.44%)Rejected-Finance | L2 | Rejected-Finance Other than the lowest bidder | |
| 3 | L3₹46.8 L+₹4.0 L (9.22%)Rejected-Finance | L3 | Rejected-Finance Other than the lowest bidder | |
| 4 | L4₹53.6 L+₹10.7 L (25.0%)Rejected-Finance | L4 | Rejected-Finance Other than the lowest bidder |
Tender Value
Refer Docs
EMD Value
₹98,580
Closing Date
21 Jan 2020, 6:00 pmClosed
GE AF CHILODA
VAYU SHAKTI NAGAR CHILODA
MANNING AND OPERATION OF WATER SUPPLY INSTALLATIONS FOR FILTRATION PLANT, SWIMMING POOL, TYPE-II AND TYPE-III BUILDINGS AT VAYU SHAKTI NAGAR CHILODA
2019_MES_307359_1
8975/19-20/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
VAYU SHAKTI NAGAR CHILODA
AS PER NOTICE OF TENDER
8 documents required · 8 mandatory
₹500
Yes
GE AF CHILODA
₹98,580
Yes
31 Jan 2020
18 Dec 2019
23 Jan 2020
18 Dec 2019
21 Jan 2020
1 Jan 2020
18 Dec 2019 - 1 Jan 2020
Amount
Provision of services for operation of filteration plant at AF chiloda for management of water supply installation comprising of submersible pump, centrifugal pumps, water pump,sluice valve, UG sump and DG set complete all as specified and directed for round the clock (03 shifts for 08 hrs) operation with one FGM per shift of 08 hrs in three shifts complete all as directed by Engineer-in-charge.
Provision of services for operation of Swimming Pool at AF chiloda for management of water supply installation comprising of centrifugal pumps,sluice valve, balance tank and Vacuum pump complete all as specified and directed for 16 hrs (02 shifts for 08 hrs) operation with one FGM per shift of 08 hrs in two shifts complete all as directed by Engineer-in-charge.
Provision of services for operation of MAP officers pump house at AF chiloda for management of water supply installation comprising of submersible pump, centrifugal pumps,sluice valve, UG sump and DG set complete all as specified and directed for 16 hrs (02 shifts for 08 hrs) operation with one FGM per shift of 08 hrs in two shifts complete all as directed by Engineer-in-charge.
Provision of services for operation of type-2/3 pump house at AF chiloda for management of water supply installation comprising of submersible pump, centrifugal pumps,sluice valve, UG sump and DG set complete all as specified and directed for round the clock (03 shifts for 08 hrs) operation with one FGM per shift of 08 hrs in three shifts complete all as directed by Engineer-in-charge.
Provision of services for operation of borewell pump house and STP at AF chiloda for management of water supply installation comprising of submersible pump, centrifugal pumps,sluice valve, UG sump and DG set complete all as specified and directed for round the clock (03 shifts for 08 hrs) operation with one FGM per shift of 08 hrs in three shifts complete all as directed by Engineer-in-charge.
Provision of services for operation of fire fighting pump house at AF chiloda for management of water supply installation comprising of centrifugal pumps,sluice valve, UG sump and DG pump set complete all as specified and directed for round the clock (03 shifts for 08 hrs) operation with one FGM per shift of 08 hrs in three shifts complete all as directed by Engineer-in-charge.
Note for Sch `A Item no 1.00 to 06.00 above:-
(i) Electrician hand tools, tester, Meggar, test lamp, safety shoes , Helmet and hand gloves, instulation Tape,Cotton waste and all tools DO rod, spanner set, tool kit, tool bag etc. Hand gloves suitable for working pressure 11000 Volts and tested up to 22000 Volts and pressure guage clamp meter will be provided by the contractor without any extra cost.
(ii) The contractor should always keep in mind that it is only the services of these contract labours is outsourced & not manpower.So providing reliever will be sole responsibility of contractor.
(iii)DHPP for running of DG set shall be issued by department all as directed by Engineer - in - Charge.
(iv) Rates quoted shall be including minor repair as per daily weekly or monthly check.
(v) Electrcity as required shall be made available to the contractor free of cost by department.
(vi) Contractor shall maintain the shut down register and log books for running pump sets as per format and all as specified and directed by Engineer in charge.
(vii) Cleaning of Substation/pump house premises and surrounding the area inside fence/compound wall complete all responsibility of contractor.
(viii) Emergency light will be provided by the contractor during night hours without any extra cost.
(ix) All safety precautions as per IE rules should be strictly followed by contracted employees & department shall not be held responsible for any untowards incident.
(x)Attendence Register of Staff Employed will be maintained by JE E/M. If any labour found absent, necessary penalty/recovery will be made by Engineer-in-charge as per CA clause.
(xi) The contractor should always keep in mind that it is only the services of these contract labours is outsourced & not manpower.So providing reliever will be sole responsibility of contractor.
(xii) Qualification & experience certificate of contracted labours should be produced by contractor.
(xiii) Contractor has to produce Photo ID of the staff employed with security pass number issued by Main Guard Air force Station. (xiv) Staff employed will be given 2 sets of uniform. (xv) GST / EPF paid certificate should be enclosed with RAR. (xvi) It should be ensured by contractor that minimum labour charges are paid as per the minimum fare wages act and wages register duly signed by concerned labour will be produced alongwith RAR by the contractor. If rates quoted by the L1 bidder are less than Schedule of Minimum Fare Wages, then that bidder will not be accepted and tender will be recalled as per the instructions of Accepting Officer. (xvii) The payment to every staff employed on work shall be made in the Aadhaar linked bank account through account payee cheque only.
divyarsh entrprise
Shreeganesh Construction
nirman construction
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .