Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹33.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹33.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹33.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹33.8 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹33.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹33.8 LAdmitted-Fee/PreQual/Technical/Finance AT PO BISRA DIST SUNDARGARH ODISHA 770036 | BISRA | SUNDARGARH | ODISHA | 770036 | +0.00% | ₹33.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹33.8 LAdmitted-Fee/PreQual/Technical/Finance CUTTACK CUTTACK ODISHA | CUTTACK | ODISHA | 752120 | +0.00% | ₹33.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹33.8 L
EMD Value
₹33,773
Closing Date
7 Sept 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BONAI
Construction of Govt Homeopathic Dispensary Building and boundary wall at Kundehidiha of Gurundia Block in the District of Sundargarh for the year 2025-26
2026_CERWI_139513_1
ONLINE-EEBNI-05 of 2026-27
Open Tender
Civil Works - Buildings
Percentage
180 days
Bonai
2 documents required · 2 mandatory
₹6,000
₹33,773
Yes
8 Sept 2026
24 Aug 2026
8 Sept 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
24 Aug 2026 - 6 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation of foundation in all kinds of soil including dressing and levelling the bed to required depth and width and deposting the excavated materials away from work site as directed by Engineer in charge. | 133.97 | cum | 304.95 | ₹40,854.82 |
| 2 | Filling in foundation and plinth with sand well watered and rammed including cost conveyance and royalty etc. complete. | 67.33 | cum | 872.45 | ₹58,742.06 |
| 3 | Cement Concrete (1:3:6) with 4cm size hard granite metal in Foundation and Plinth. | 21.8 | cum | 6,789.55 | ₹1,48,012.19 |
| 4 | Brickwork with Cement K.B Bricks in cement mortar (1:6) in Foundation and Plinth | 19.16 | cum | 6,285.26 | ₹1,20,425.58 |
| 5 | Brickwork with Cement Cement Flyash bricks in cement mortar (1:6) in Super structure | 73.94 | cum | 6,318.59 | ₹4,67,196.54 |
| 6 | RCC wok of M-25 grade with 20mm downgraded size hard granite chips including hoisting and laying | 0.01 | cum | 0.01 | ₹0 |
| 7 | A.Column Base & footing | 30.5 | cum | 7,980.49 | ₹2,43,404.95 |
| 8 | B. Column & Beam | 18.78 | cum | 19,652.34 | ₹3,69,070.95 |
| 9 | C. Shelves | 9.88 | sqm | 1,294.9 | ₹12,793.61 |
| 10 | D.Lintel Band | 2.54 | cum | 15,643.81 | ₹39,735.28 |
stage.html
html • 0.06 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.14 MB
Tendernotice_2.pdf
PDF • 1.02 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_607117.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .