Loading…
Loading…
Tender Value
₹88.6 L
Closing Date
2 Jul 2026, 4:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
R G DESAI
Tender for Bi-ARC Emergency Restoration work of 66KV/132KV/220KV Transmission line on Tower / H Frame structure with ACSR Dog/Panther/Zebra/Equivalent AL-59 Conductor under Himatnagar circle.
317277
2026-27/HTC / 21
Open
Electrical and Maintenance Works
Sabarkantha
18 documents required · 18 mandatory
₹5,900
GETCO,Himatnagar
24 Jun 2026
24 Jun 2026
24 Jun 2026
2 Jul 2026
24 Jun 2026
SR No. Amount
Tender for Bi-ARC Emergency Restoration work of
66KV/132KV/220KV Transmission line on Tower / H
1 Frame structure with ACSR
Dog/Panther/Zebra/Equivalent AL-59 Conductor
under Himatnagar circle.
Welfare cess @ 1.00 %
Total in Rs
Item Wise Rate
Sr. Description. Unit Rates
Work of an original survey with line route alignment, preparation &
submission of detail reports as per requirement of EIC in 6 copies
including excavation for trail pits in any type of soil for soil
classification work, the size of trial pits is 1x1x3 meter, 2 Nos. of
such pits in 1kmlength & providing and fixing of pre-cast permanent
concrete blocks/stones of 150mm
x 100mm x 300mm (LxBxH) on each deviation point I trial pit on
entire line with chain age
I Trail Pit number (TP-1) painted on it as per instruction of the EiC.
The rate is inclusive of back filling of the pits so excavated after
classification of soil for foundation.
Detail scope of Work :-
(a) Submission of feasible and shortest 3 numbers of line route on
survey of India topo sheet and kmz file. Also, fixing and submission
of one final route on survey of India Topo Sheet, on google map
and kmz file as per requirement.
(c) Preparing tower schedule with details like type of tower with
summary ·Indication of all angle point with fixing of suspension
tower in between angle point, foundation type, sectional length, lat-
longs (co-ordinate), name of village, land type (Waste or
agriculture), BOQ of foundation, BOQ of tower etc. as per
requirement of EIC.
(d) To take level of major crossing with detail & indicate detail
about major nearby installation Like defense, Airport, Oil filled etc.
(e) Submit all type of statutory details with drawing, which require
for statutory approval
i.e. Crossing of Electric Line (all type), Gas Line, National I State
highways, Railway, Canal Forest etc
x 100mm x 300mm (LxBxH) on each deviation point I trial pit on
entire line with chain age
Check Survey along with plotting of line route on village (tika) map
2 with Coordinates including detailed survey, preparation of profiles KM
and revision in original route alignment, if any
Excavation excluding back filling, but including shoring, shuttering,
dewatering, tree cutting for tower footings etc. for :-
a) Normal soil either dry or wet/Sandy soil Cu.m
b) Black Cotton Soil either dry or wet Cu.m
c) Normal submerged/marine soil where dewatering is necessary. Cu.m
d) Black cotton submerged/marine soil where dewatering is Cu.m
necessary.
e) Soft Rock Cu.m
f)Hard Rock Cu.m
Installation of steel reinforcement in concrete foundation including MT
4 supply of GETCO Approved M.S. bars, binding wire & their cutting,
bending, shaping and laying in position as per drawing.
Stub-setting with prop or template including back-filling of excess
soil and levelling of site is to be done as per inst of EIC but MT (up to 6 Meter extn)
5 excluding excavation and concreting etc. for all types of
towers/extensions except special towers. (Weight of stub, cleat & (up to 9 to 25 Meter
template with Bolt & Nuts of stub & template shall be counted) extension
Concreting of foundation by M20/M15/M25 mixture including 10306 (M15
6 shoring, shuttering, dewatering etc. for normal tower / tower with Cu.m mixture)
extension up to 25mtr. After completion of Concrete work,curring (
watering to Concrete) is to be done as per inst EIC. (Rates are with (M25 mixture)
Grounding of towers with pipe type earthing including excavation
and back filling and supply of all materials like 32mm dia heavy Set.
7 duty 3 mtr. long G.I. Pipe & 50 x 6 mm G.I. flat, bolt-nuts, with GI
spring washer salt, coal/charcoal etc. as per drawing and as per
inst of EIC.
Erection of super structure up to 6 meter extension including tree MT
cutting, fixing of tower accessories, attachments except ACD /DP
/NP /CIP /PP and excluding tack welding of bolts AS Per inst of
8 EIC. This includes taking delivery of tower materials and bolt-nuts
from GETCO’s stores etc. for normal, extension & special towers at
destination and keeping them in safe custody and transporting the
same to erection site.
Same as above but erection of 9/12/15/18/21/25 Mtr. extension with MT
Fixing of Anti-climbing devices including supply of barbed wire as
per drawing and as per inst of EIC.
a) 66KV Loc.
b) 132KV Loc.
c) 220KV Loc.
d)400KV Loc
Fixing of DP / NP / PP / CIP including supply of plates and supply of
G.I. bolts-nuts & tack welding as per drawings and as per inst of EIC.
11 a) S/C Loc.
b) D/C Loc.
c) M/C Loc.
Tack welding of nuts up to approx. 10 mtrs. height OR two bottom- Per Bolt.
most panel from ground level at three places on the nuts
diametrically and applying zinc rich paint immediately after tack
welding and as per inst of EIC.
Dismantling of any type of tower including transportation & crediting Per MT
to nearest GETCO’s store as per instruction of Engineer in-charge.
Cutting of stubs of old tower to be dismantled including breaking of Per tower
chimney/cutting of RCC up to 450mm below ground level &
crediting stubs & steel bars to GEB Store including back-filling &
levelling of site as per inst of EIC.
Work of Painting of name of line, location number, colour code of
desired length and telephone number on tower leg with letter of
Guajarati language using ISI marked paint as per inst EIC including
15 supply of paints and other require materials.
All four legs-For 2 Nos of Line M/C per loc
All four legs – for 2 Nos of Line D/C per loc
two legs –For 1 Nos of Line S/C per loc
Stringing of ONE ground wire including laying, jointing, tensioning, RKM
clamping with accessories, Jumpering, & sister wire, vibration
damper earth bond etc.& including tree cutting as per inst of EIC.-
Stringing of ACSR/ AAAC 3 (Three) conductors for single circuit
including laying, jointing, tensioning, clamping with armour rods,
hoisting of insulator string fixing of jumpers, dampers etc. & with
17 required tree cutting on entire length for adequate clearances / safe
charging of line, as per inst of EIC.
66kV Dog Conductor RKM
66kV Panther / 132kV Panther RKM
220kV Zebra Conductor-AL 59 RKM
-do- but for Stringing of ACSR/ AAAC 6 (SIX) conductors for
double circuit.
18 66kV Dog Conductor RKM
66kV Panther / 132kV Panther RKM
220kV Zebra Conductor RKM
Dismantling of conductors and line materials of existing line with :
3-conductors
19 66kV Dog Conductor RKM
66kV Panther / 132kV Panther RKM
220kV Zebra Conductor RKM
Dismantling of conductors and line materials of existing line with :
6-conductors
20 66kV Dog Conductor RKM
66kV Panther / 132kV Panther RKM
220kV Zebra Conductor RKM
Dismantling of conductors and line materials of existing line with RKM
:Single earth wire
Termination and connection for making LOOP-IN-LOOP-OUT
arrangement with existing line during specified outage.(Cold
Condition)
66kV Dog Conductor Job work.
66kV Panther / 132kV Panther Job work.
220kV Zebra Conductor Job work.
Complete Installation of OPGW cable (24/48 fibres) including laying,
providing required hardware’s, in line splices to be encased in Fibre
Optic Splice Enclosures, Laying and termination of a fibre optic
approach cable required to connect Overhead Fibber Optic Cable
(OPGW) between the final in line splice enclosure on the
gantry/tower and the Fibre Optec Distribution panel (FODP) to be
installed within the building at both the substation ends as per
technical specifications
66kV Panther / 132kV Panther KM
220kV Zebra Conductor-AL 59 KM
Dismantling of OPGW cable with require accessories and credit to
GETCO Store or Sub station as per instruction of EIC (24/48 fibres)
66kV Panther / 132kV Panther KM
220kV Zebra Conductor-AL 59 KM
Link up of OPGW Cable including all related activities as per inst.of
66kV Panther / 132kV Panther KM
220kV Zebra Conductor-AL 59 KM
Work of attending the fault of Broken conductor / conductors and/or
Snapping from tower only at any one location (Tens on to Tension
Location), in COLD LINE CONDITION including mobilization of
26 man power at site. Required materials i.e., H/W and Conductor will
be provided by GETCO at free of cost. Also, materials to be taken
from the GETCO's store and after using of the materials, balanced
and old dismantled materials to be credited to the GETCO's store.
- Tower Line-Cold Line
66kV Dog Conductor
66kV Panther / 132kV Panther
220kV Zebra Conductor
Work of attending the fault of Broken conductor / conductors and/or Job Work
Snapping from H-frame only at any one location (Tens on to Tension
Location), in COLD LINE CONDITION including mobilization of man
power at site. Required materials i.e., H/W and Conductor will be
provided by GETCO at free of cost. Also, materials to be taken from
the GETCO's store and after using of the materials, balanced and
old dismantled materials to be credited to the GETCO's store.
- H-Frame-Cold Line
66kV Dog Conductor
66kV Panther / 132kV Panther
Work of attending the fault of Broken conductor I conductors and/or
Snapping from tower only at any one location (Tens on to Tension
Location), in COLD LINE CONDITION including mobilization of
man power at site. Required materials i.e., H/W and Conductor will
be provided by GETCO at free of cost. Also, materials to be taken
28 from the GETCO's store and after using of the materials, balanced
and old dismantled materials to be credited to the GETCO's store.
- Tower Line
66kV Dog Conductor
66kV Panther / 132kV Panther
220kV Zebra Conductor
Erection of ‘H’ frame structure with channels, bracings, clamps etc.
for ‘A’/’B’ type location including excavation in Normal/ black cotton
soil (Dry / Wet / submerged) and back filling of earth, ramming and
with supply of bolts, nuts and painting of the complete structure
29 including required tree cutting. Before erection, one coat of good No.
quality primer must be applied to the complete structure and black
Japan paint of standard make should be applied up to 3 mtr. from
bottom. After erection, two coats of aluminium paint of Asian /
Burger / Nerolac make shall be applied to the complete structure.
Original survey with route alignment (3 alternative route) on survey
of India Topo sheets, detailed survey, preparation and submission
30 of route alignment with modern techniques in 6 copies & providing
pre-cast permanent concrete blocks/stones of 600mm x 300mm x
100mm on each deviation point on entire line with chain age
painted on it.
31 As per Item Sr. No. 29, but for angular location up to 60 Degree
deviation / dead end – ‘C’ type.
32 Erection of 105 Lbs./ Rail or RSJ 150 x 150 mm size single pole as
per work indicated in Item Sr. No.
Stringing of ACSR/AAAC Three conductors for single circuit
33 including laying, jointing, tensioning, clamping with armour rod, (For Dog)
hoisting of insulator string, jumpering, fixing of dampers etc.
complete as per specification including required tree cutting with (For Panther)
adequate clearance and safe charging of line and as per inst of
Grounding of above ‘H’ frame/single pole structure with pipe type
34 earthing as per drawing including excavation by auguring & back
filling & supply of all materials like 32mm dia. medium duty 3 mtr.
long GI pipe (B class – Blue mark) & G.I. flat of 50x6mm size
including supply of bolt nuts, salt, coal, charcoal etc. as per
Erection of stay set complete with stay clamp, turn buckle, eye bolt,
35 anchor rod and binding with 7/8 or 7/10 SWG earth wire as per inst Set.
Concreting of foundation for all the structures, with M15 mix.
Including concreting of stay sets with supply of materials like
36 cement of 43 grade, sand, metal etc. with muffing (400 mm Dia x
300 mm Ht. above ground level for all the structures. After CU.M.
completion of concrete work,watering to concrete is to be done as
per inst of EIC.rates are inclusive of supply of GETCO approved
Cement only.
Tack welding of nuts at three places on the nuts diametrically fitted
37 to ‘A’, ‘B’ and ‘C’ TYPE structures and applying red oxide & zinc Per Bolt.
rich paint on it immediately after tack welding as per inst of EIC..
Transportation of Girder / Rail from GETCO’s nearest Store Centre
38 to one end of the line including loading and unloading as per inst of
i) Up to 70 KMs(up to 6MT) LumSum Job/Lot
ii) Up to 70KV (Beyond 6MT)-Proportionate Per MT
iii) Beyond 70 KMs per MT/KM
Conversion of ‘A’ type ‘H’ frame structure into ‘B’ type ‘H’ frame
structure in existing line by replacing necessary channels etc. and
Job work (Per
39 termination and restringing of Dog or Panther 3 conductors for
making LILO arrangement with existing line or for changeover of
line during availability of specified outage only.
Dismantling of ‘A’ & ‘B’ type ‘H’ frame structure by breaking of
40 muffing up to 450 mm depth from ground level and cutting the
girders from 450 mm depth from ground level by gas cutting & Loc.
crediting the material to Const. store as instructed by Engineer
in-charge.
41 - do – but for ‘C’ type structure. Loc.
Dismantling of all three conductors and line materials such as
42 insulators, hardware’s etc. and crediting to the GETCO’s Store or
Substation including transportation as per instruction of Engineer Route Km.
in-charge. with submission of pole wise inventory for preparing
Providing & fixing of NP with name of line / DP including supply of
43 bolts & nuts and tack welding/ punching as per drawings.
44 Providing ft fixing of ACD on Single Pole girders as per drawing and
as per instruction of EiC.
45 Providing ft fixing of ACD on A / B Type Frame as per drawing and
as per instruction of EiC.
46 Providing & fixing of ACD on C Type H-Frame as per drawing and
as per inst of EIC.
Work of Painting of name of line, location number, colour code of
47 desired length and telephone number on H-Frame. (2 legs) with
per loc
letter of Gujarati language using ISI marked paint as per inst of EIC
including supply of paint and other require materials.
48 P&F of fiber type Bird Guard fabricated from 2mm thick GI sheet on
per loc
each location (3 nos Per Loc) as per drawing and instruction of E.I.C.
49 Providing & Fixing of Mud Guard on H Frame str & Tower str on
per loc
three phase conductor as per drawing and instruction of EIC
Remarks- Quantities are considered tentative, Once the exact fault is identified, a
separate sub-work order will be issue for specific quantities and costs.
(1) While calculating the weight of stub-setting, the weight of stub, cleat & templates shall also be added in stub weight.
(2) Red oxide & zinc rich paint shall be applied after tack welding of nuts.
(3) The above rates are with supply of GETCO approved cement and steel by the contractor.
(4) For concreting work, mixture machine is to be used as per site condition and as per inst. of EIC.
(5) Tower dismantling work should be carried out with help of using rust free spray and without cutting of any members
/ leg / stub and as per inst. of EIC,where applicable.
(6) While crediting of material, agency has to submit the original gate pass copy / CR copy with required documents
as per instruction of EIC.
(7) The rate indicated above includes taking delivery of all stringing material from contractor store/ GETCO’s store
keeping them in safe custody and transporting the same to erection site.
(8) For any crediting of material related work, agency has to submit the original gate pass copy / CR copy with required
documents as per inst. and as per requirement of EIC or when demanded.
(9) All ‘H’ frame A, B, C type structures, tension guys are to be fully concreted and wind guys shall be concreted for
mtr. height only.
(10) In case of excavation in SOFT / HARD ROCK for Item Sr. No. 29, 31,32 & 35, additional rate of Rs. 1021- / & 2118/-
per CMT respectively shall be paid separately.
(11) Except item No 39, all the rates indicated above includes taking delivery of all stringing material from GETCO’s store
at destination & keeping them in safe custody & transporting the same to erection site. Similarly the rates of erection
at Sr.No. 29, 31, & 32 above includes transportation of material from one end of line to erection site.
CERTIFICATE
I we am / are willing to carry out the above work at_______________________________________ % above / below (percentage)
should be written in figures and words. ___________________________________________________________Percentage above /
below the tender amount work out Rs. ______________________________________________Rupees in
words____________________________________________________________________________
Signature of Contractor,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
2026-27 HTC 21 Price bid.pdf
2026-27 HTC 21 Tech Bid.pdf
Download all tender documents and submit your bid