Tender Value
₹52.5 L
EMD Value
₹52,500
Closing Date
15 Jun 2026, 6:00 pm
Executive Engineer, panchayat, R & B Division, Surat.
PROPOSED RENOVATION OF VARIOUS BUILDING AT VILLAGE : KAVAS,TA: CHORYASI,DIST: SURAT.
309657
03 0F 2026-27
Open
Civil Works - Others
Surat
5 documents required · 5 mandatory
₹2,400
Executive Engineer, panchayat R & B Division, surat
₹52,500
1 Jun 2026
1 Jun 2026
1 Jun 2026
15 Jun 2026
1 Jun 2026
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
1 Demolition of Brick work and stone masonry including 2.17 CMT. 577.92
stacking of serviceable materilas and disposal of
unserviceable materials with all lead and lift.(ii) In
CementMortar
2 Removing and scraping of old deteriorated plaster of any 197.40 CMT. 20.55
thickness fromm wall / R.C.C member including
stacking of serviceable material and disposal of
unserviceable from site of work with all lead and lift
3 Brick work using common brunt clay building bricks 3.26 CMT. 4214.32
having crushing strength not less than 35 kg/sqcm. in
foundation and plinth in cement mortar 1:6 (1 cement :6
fine sand) etc.comp. (B) Conventional Ground floor
4 Providing 15mm thick cement plaster in single coat on 16.80 SMT 161.19
Rough (Similar)side of single or Full/half brick walls
for interior plastering upto floor two level and finished
even and smooth in (ii) Cement mortar 1:4 (1-cement :4-
sand) Ground Floor
5 Providing 15mm thick cement plaster in single coat on 16.80 SMT 185.75
Rough (Similar)side of single or Full/half brick walls
for interior plastering and finished even and smooth in
(ii) Cement mortar 1:4 (1-cement :4-sand) First Floor
6 Providing & laying 10 mm. thick cement plaster in 9.45 SMT 148.31
single coat on fair side of ceilings for interior plastering
upto floor two level and finishing with smooth mala
plaster.(i) Cement mortar 1:4 (1 cement : 4 sand)
Ground Floor
7 20mm thick sand faced cement plaster on walls upto 163.80 SMT 315.68
Any height metres consisting of 12mm thick backing
coat of C.M. 1:3 (1-cement : 3-sand) and 8mm thick
finishing coat of C.M. 1:1 (1-cement : 1-sand) etc.
complete. Upto Ground Floor to Terrace (LMR) Floor
8 Removing old colour by a washing and scraping and 1036.56 SMT 96.23
sand papering the wall surface smooth including
necessary repairs to scratches complete and Wall
painting (two coats) with plastic emulsion paint of
approved brand and manufacture on undecorated wall
surface,Ceiling surface to give an even shade including
throughly brushing the surface free from mortar
droppings and other foreign matter and sand papered
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
9 Removing old colour by a washing and scraping and 7097.63 SMT 177.76
sand papering the wall surface smooth including
necessary repairs to scratches complete and Priming:
Apply a liberal coat of exterior acrylic primer and allow
it to dry for 4-5 hours. Application of putty is not
recommended.Minimum 4-6 hours duration is required
between each coat of weather shield max paint
Finishing wall with weather proof max exterior paint on
wall surface (two coats) to give an required shape even
shade after thoroughly brushing the surface to remove all
dirt, and remains of loose powdered materials.etc
10 Providing & applying 3 to 4mm thick single coat of 959.62 SMT 511.06
textured (ruff N turf) at external surface at all floor
levels at outer side of the building on RCC or Masonary
walls. Rate to include for all labour, materials, staging,
scaffolding, cleaing, curing etc. application of texture
after throughly brushing the surface to give an even
shade free from mortar dropping/other foreign matter
etc. complete. application of textures & paints must be
as per company's standard instructions. Texture and
Unit Rate of 1 Sq.Mt.
11 Applying priming coat over new steel and other metel 782.67 SMT 128.62
surface after and including preparing the surface by
throughly cleaning, oil,grease, dirt and other foreign
matter and scoured with brushes fine steel wood,
scrapers and sand paper with ready mixed priming paint
brushing red lead. and Painting two coats (excluding
priming coat) on new steel and other metal surface with
enamel paint, brushing, interior to give an even shade
including cleaning the surface an even shade including
cleanicn the surface of all dirt, dust and other foreign
12 Crack Repairs:-Crack filling using fiber reinforced 240.45 RMT 207.05
polymer modified mortar after openning crack in "V"
grove, Making Surface dust free, with a bond coat of
polymer as per the data sheet for crack repairing cracks
less than 10mm
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
13 Providing and applying cement mortar (1:3) modified by 67.83 RMT 2517.93
using polymer and expanding grout additives at various
thickness for repair/strengthening of various RCC
elements at all floor levels, lead, lift, including breaking,
chipping, dismentling existing cover concrete and
exposing existing reinforcement, applying wirebrush for
making surfaces of steel and concrete free from rust and
other loose materials, applying rust removing chemical
on existing reinforcement, applying anti-corrosive
coating on existing reinforcement, applying polymer
bonding agent on existing concrete surfaces before
applying polymer modified mortar in specified thickness
as directed by the Engineer-in-charge. The rates shall
also include providing and applying 12 mm thick cement
mortar (1:3) modified with plasticizer for finishing
smooth the repaired surfaces, providing and applying
curing agent on the repaired surfaces, etc. complete as
directed by the Engineer-in-charge. The make and
quality of rust removing chemical, anti-corrossive
coating, polymer bonding agent, polymer and expanding
grout additives, plasticizer, curing agent, etc. shall be
approved by engineer-in-charge. The procedure for
application shall be strictly in accordance with
manufacturer's detail specification, which shall be
submitted before start of work and shall be approved by
the Engineer-in-charge.
14 The rates shall
Providing andinclude
layingthe cost of cement
integral providing, erecting
based water 1692.59 SMT 880.72
proofing treatment including preparation of surface as
required for treatment of roofs, balconies, terraces etc.
consisting of following operations.
(a) Applying and grouting a slurry coat of neat cement u
',brick bats is finally covered by jointless cement plaster
20mm th. in C.M. 1:4 added with special water proofing
compound confirming to IS:2645 & top smooth finished
with trowel with false chequered marking of
mm.size.The treatment is carried along
15 Providing and laying broken chine mosaic flooring 1780.01 SMT 779.69
for terrace using 12 mm to 20 mm broken pieces of
glazed tiles to be laid over cement mortar 1:3 to plain or
slope and to be tempered to bring mortar creme out
upto surface using
16 Providing and laying cement concrete 1:2:4 (1-Cement : 6.30 CMT. 3923.85
2- coarse sand : 4- hand Machine crushed stone
aggregates 40 mmnominal size) and curing complete
including cost of formwork in (A) PCC
SHEDULE B Page
Description of Item (With brif Specification And Rate in
Item No. Quantity Unit Amount
Reference to Book of Specifications) Figures
17 Providing and laying polished Granite Slab 18mm thick 36.00 SMT 2534.09
in Flooring, Risers of steps, Dedo, window sill, jembs
and pillars laid 10mm thick Cement Mortar 1:4 (1-
Cement : 4-Coarse Sand) and jointed with Grey Cement
Slurry including full molded round front edges , rubbing
and polishing etc. complete. Unit rate 1Sq.Mt.
Rupees FiftyTwo Lakh FourtyFive Thousand Five Hundred SeventyEight Paise EightySix Only
I we am / are willing to carry out the work at …................................ % above/ Below percent ( Should Be writen
in figures And words) of the estimated rate mentioned above. Amount of my / our tender works out as under.
Estimated Amount Put to tender. 52,45,578.86 Estimated Amount Put to tender.52,45,578.86
Deduct…........ % Below Deduct…........ % Below
In Words In Words
(1) The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge
for which no extra payment shall be made.
(2) The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
(3) GST and Income tax TDS will be deducted at a source while making payments of bills
(4) In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item at the rate
of input rate mentioned in all the tender.
Signature of Bidder
Deputy Executive Engineer Divisional Accountant
Panchayat ( R&B) Sub Division Panchayat ( R&B) Division
Choryasi Surat
Executive Engineer
Panchayat ( R&B) Division
SHEDULE B Page
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
3.Cement Standards -11-05-17 GR 2 Side.pdf
4.Tender Negotiation.pdf
5.Laboratory GR.pdf
6.GST GR.pdf
7.Steel Lap.pdf
11. Other GR.pdf
8.Clause 47 48.pdf
14 Building Booklet civil.pdf
Cement consumption gr.pdf
GST GR 1.pdf
Inspection 1.pdf
Laboratory GR 1.pdf
Steel Lap 1.pdf
5.GR.pdf
4.0 tender booklet.pdf
GR.pdf
Environment GR_11zon (1).pdf
2. SBD RENOVATION KAVAS BUILDING.pdf
3.0 Specification RENOVATION KAVAS BUILDING.pdf
3.1 Building-Specification Book.pdf
BOQ RENOVATION KAVAS BUILDING.pdf
CamScanner 04-09-2025 15.03.58.pdf
DMO_2876_01-May-2025_273.pdf
GRs - SBD with Index_11zon (3).pdf
Download all tender documents and submit your bid