Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.3 L+₹27,677.94 (3.95%)Rejected-AOC | ₹7.3 L+₹27,677.94 (3.95%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.4 L+₹37,861.79 (5.40%)Rejected-AOC | ₹7.4 L+₹37,861.79 (5.40%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | RANS CONSTRUCTION L1 | MAHSHOOK M. L3 | SHABEER K.K. L2 |
|---|---|---|---|---|---|---|
| 1.00Appendix C - Pre-monsoon Works | ||||||
| 1.00 | OD43646/2026-2027:Cutting of grass and light jungle using bush cutter with all expense | 450 | hour | 200 ₹90,000 Lowest | 211.05 ₹94,972.5 | 208.12 ₹93,654 |
| 1.00 | OD43648/2026-2027:Engaging Man Mazdoor for lifting , removing and replacing the cover slabs for clearing the chocked culvert and drains, Helping wood cutter for cutting standing and fallen trees, assisting revenue team for fixing boundaries of the road, Clearing road land by uprooting rank vegetation, grass, bushes, shrubs..etc and other charges. | 152 | each | 857 ₹1,30,264 Lowest | 902.62 ₹1,37,198.24 | 890.53 ₹1,35,360.56 |
| 1.00 | OD43649/2026-2027:Engaging JCB for removing the obstruction such as unserviceable soil and dumped earth along shoulder side of carriageway and clearing the road surface for traffic worthy etc complete | 215 | hour | 1,162 ₹2,49,830 Lowest | 1,225.08 ₹2,63,392.2 | 1,208.09 ₹2,59,739.35 |
| 1.00 | OD43666/2026-2027:Engaging Tipper | 150 | hour | 623 ₹93,450 Lowest | 656.3 ₹98,445 | 647.19 ₹97,078.5 |
| 1.00 | OD43667/2026-2027:Engaging woodcutter with tools and accessories required for cutting trees,branches of trees of any girth overhanging above any structures including stacking of serviceable materials and disposal of unserviceable materials without any damages to nearby structures etc complete | 27 | Day | 1,202 ₹32,454 Lowest | 1,266.29 ₹34,189.83 | 1,248.72 ₹33,715.44 |
| 1.01 | OD43668/2026-2027:Engaging Truck for Removing materials | 10 | Day | 1,860 ₹18,600 Lowest | 1,960.13 ₹19,601.3 | 1,932.94 ₹19,329.4 |
| 1.01 | OD43669/2026-2027:
Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg | 149 | each | 579 ₹86,271 Lowest | 610.28 ₹90,931.72 | 601.81 ₹89,669.69 |
Tender Value
₹8.5 L
EMD Value
₹21,179
Closing Date
24 Jun 2026, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer, PWD Roads Sub Division, Manjeri, Malappuram
GENERAL-Urgent Pre monsoon works on various PWD roads having no RC works under Manjeri roads section for a length of 12.66 km- Total 4 Nos of roads-Manjeri and Malappuram lac-General Civil Work-1
2026_PWD_856299_1
PWD/RB/TR/8868/2026_5_1_1/1
Open Tender
Civil Works - Roads
Item Wise
Manjeri
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,870
Yes
₹21,179
Yes
16 Jul 2026
17 Jun 2026
27 Jun 2026
17 Jun 2026
24 Jun 2026
17 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix C - Pre-monsoon Works | |||||
| 1.001 | OD43646/2026-2027:Cutting of grass and light jungle using bush cutter with all expense | - | hour | - | - |
| 1.002 | OD43648/2026-2027:Engaging Man Mazdoor for lifting , removing and replacing the cover slabs for clearing the chocked culvert and drains, Helping wood cutter for cutting standing and fallen trees, assisting revenue team for fixing boundaries of the road, Clearing road land by uprooting rank vegetation, grass, bushes, shrubs..etc and other charges. | - | each | - | - |
| 1.003 | OD43649/2026-2027:Engaging JCB for removing the obstruction such as unserviceable soil and dumped earth along shoulder side of carriageway and clearing the road surface for traffic worthy etc complete | - | hour | - | - |
| 1.004 | OD43666/2026-2027:Engaging Tipper | - | hour | - | - |
| 1.005 | OD43667/2026-2027:Engaging woodcutter with tools and accessories required for cutting trees,branches of trees of any girth overhanging above any structures including stacking of serviceable materials and disposal of unserviceable materials without any damages to nearby structures etc complete | - | Day | - | - |
| 1.006 | OD43668/2026-2027:Engaging Truck for Removing materials | - | Day | - | - |
| 1.007 | OD43669/2026-2027:
Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg | - | each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Affidavit.pdf
Tender Documents • 0.41 MB
BOQ_1447380.xls
BOQ • 0.30 MB
preliminaryAgreement.pdf
Tender Documents • 0.30 MB
form.pdf
Tender Documents • 0.18 MB
integritypact.pdf
Tender Documents • 0.05 MB
SBD_merged.pdf
Tender Documents • 1.67 MB
epay1.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .