| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-AOC | L1 | Accepted-AOC first lowest | |
| 2 | L2₹12.7 L+₹1.5 L (13.7%)Rejected-Finance | L2 | Rejected-Finance Second lowest |
Tender Value
₹12.7 L
EMD Value
₹19,116
Closing Date
21 Feb 2023, 4:00 pmClosed
Regional Engineer 8111882858
Regional Nirmithi Kendra, RNK, Vattiyoorkavu P.O Ph 0471-2362229
Clearing jungle,uprooting vegetation, earth work,PCC,Miyawaki forest.
2023_KSNK_554906_1
KSNK/TECH/VKV/BLWM-97 /2023
Open Tender
Civil Works - Others
Item Rate
60 days
Malayinkeezhu
Refer NIT
6 documents required · 6 mandatory
₹2,549
₹19,116
Yes
31 Jul 2023
2 Feb 2023
23 Feb 2023
2 Feb 2023
21 Feb 2023
2 Feb 2023
2 Feb 2023 - 21 Feb 2023
Amount
Landscaping
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
30.2.2 : Supplying and stacking of good earth at site including royalty and carriage upto 5 k.m. lead complete (earth measured in stacks will be reduced by 20% for payment).
30.2.4.1 : Supplying and stacking at site dump manure from approved source, including carriage upto 5 k.m. lead complete (manure measured in stacks will be reduced by 8% for payment) :Screened through sieve of I.S. designation 20 mm
30.2.7 : Fine dressing of the ground
30.2.8 : Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately).
30.2.9 : Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge
30.2.12 : Uprooting rank vegetation and weeds by digging the area to a depth of 60 cm, removing all weeds and other growth with roots by forking repeatedly, breaking clods, rough dressing, flooding with water, uprooting fresh growths after 10 to 15 days and then fine dressing for planting new grass, including disposal of all rubbish with all leads and lifts.
Side plants
30.2.1 : Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excluding cost of imported earth, sludge or manure).
30.2.6 : Uprooting weeds from the trenched area after 10 to 15 days of its flooding with water including disposal of uprooted vegetation.
30.2.4.1 : Supplying and stacking at site dump manure from approved source, including carriage upto 5 k.m. lead complete (manure measured in stacks will be reduced by 8% for payment) :Screened through sieve of I.S. designation 20 mm
30.2.8 : Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately).
30.2.9 : Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge
30.2.14.1 : Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts of stacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing including removal of rubbish and surplus earth, if any, with all leads and lifts (cost of manure, sludge or extra good earth if needed to be paid for separately) :Holes 1.2 m dia and 1.2 m deep
2.7.2 : Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (requiring blasting)
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
50.6.3.2 : Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
JCB Work
Leveling ground and making mounds.
Provision for spingler,drip irrigation etc
Springler with necessary accessories.
Providing and laying 20mm ASM/CPVC pipe
Providing and fixing flexi hose.
Providing and fixing 25mm ASM/CPVC pipe.
Providing and fixing 20mm half way angle valve
Providing and fixing butterfly angle valve made of gun metal
Providing over head tank
Providing and fixing ball valve.
Providing and laying 50mm ASM/CPVC pipe
Providing and laying 25mm ASM/CPVC pipe
Purchase of Plants of different sizes and species,pesticides and cow dung
Plant-30cm height
Plant-40cm height
Plant-50cm height
Plant-60cm height
Phyllanthus
Pesticides
Cowdung(dried)
Miyawaki Forest
Preparation of soil : Removing and disposing all debris and weeds from the proposed site using JCB.Soil should be treated for water infilteration with root perforation capacity by using perforated materials like husk,coir fiber etc. for maintaining nourishment .Use organic fertilizer such as cow manure,goat manure ,vermi compost .Provide green net to prevent direct sunlight for maintaining soil moisture and protect young saplings upto 5 months. There should not be waterlogging,excess water must be drained using proper drainage facility.
Creating Miyawaki forest: Create it with natural vegetation best suited to the area being planted. Forest should be multi-layered with four layer vegetation which include canopy trees,trees,sub trees and shrubs. Should plant different locally available species of plants for maintaining bio diversity. Sapling must be evergreen ,deciduous,perennial with ideal height (60-80 cm).40-50% of total number of trees must be major forest species (i.e atleast 5 different forest species). 25-40% common species.Watering must be done using drip irrigation facility only
P ANILKUMAR
Bidder Name
SOBHANA KUMAR PARAMESWARAN
P ANILKUMAR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .