Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 LAccepted-AOC | L1 | Accepted-AOC Admitted | |
| 2 | L2₹6.6 L+₹14,350.25 (2.21%)Rejected-AOC KUZHIPPALLIL HOUSE KATTAPPANA P O | L2 | Rejected-AOC Rejected. Higher Rate |
| Sl No | Description | Qty | Unit | Saju M J L1 | Tomin K John L2 |
|---|---|---|---|---|---|
| 1.00 | Quoted Amount of BOQ1 in figures | 1 | Nos | 5.1 ₹6,48,494.67 Lowest | 6,62,844.92 ₹6,62,844.92 |
| 2.00 | GST Rate in percentage | 1 | Nos | 18 ₹1,16,729.04 Lowest | 18 ₹1,19,312.09 |
Tender Value
₹6.8 L
EMD Value
₹17,100
Closing Date
10 Aug 2026, 3:00 pmClosed
Assistant Engineer,Electrical Section,Murickassery
Assistant Engineer, Electrical Section, Murickassery - Idukki
Shifting of HT-LT poles from Perinjankutty to Melechinnar as part of Road Widening work - PWD (RW-5711-202526-95) under Electrical Section Murikkassery
2026_KSEB_862411_1
TENDER/2026-27/5711/9 -RW-5711-202526-95-dt. 27-07-2026
Open Tender
Electrical Works
Percentage
Melechinnar
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,652
₹17,100
23 Sept 2026
27 Jul 2026
11 Aug 2026
28 Jul 2026
10 Aug 2026
28 Jul 2026
28 Jul 2026 - 6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 212 - Stringing, shackling, fitting cross arms, insulators and binding, giving
jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place. | 0.08 | KM | 16,967.73 | ₹1,357.42 |
| 2 | 405 - Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. | 46 | No | 341.86 | ₹15,725.56 |
| 3 | 221 - Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. | 3 | No | 240.45 | ₹721.35 |
| 4 | 568 - Dismantling one section fuse from structure and bringing back to section store. | 3 | No | 192.36 | ₹577.08 |
| 5 | 610 - Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. | 8 | No | 492.41 | ₹3,939.28 |
| 6 | 451 - Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. | 17 | No | 96.18 | ₹1,635.06 |
| 7 | 421 - Straightening one slanted LT pole after unbinding the line and binding the line after work. | 1 | No | 1,027.68 | ₹1,027.68 |
| 8 | 407 - Renewal of existing damaged/broken old LT stay in existing stay rod. | 1 | No | 434.91 | ₹434.91 |
| 9 | 559 - Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. | 2 | No | 1,589.09 | ₹3,178.18 |
| 10 | 205 - Providing Stay for LT poles including digging & back filling pit in ordinary soil | 35 | No | 938.82 | ₹32,858.7 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1459157.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
KIIFBDOCUMENT.pdf
Tender Documents • 1.46 MB
BOQ_1459157.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .