Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹30 L
EMD Value
₹40,000
Closing Date
30 Nov 2026, 6:00 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
PANDESARA DIVISION
Emergency work of locate 22kv / 11kv UG cable fault locating & attending the fault by providing joining kit etc. [suitable Straight through joining kit & Outdoor end termination kit to be supplied by contractor and 22kv / 11kv XLPE cable will be supplied by DGVCL] under All Sub divisions area under Pandesara Division
364715
T-51/DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026
Open
Electrical
Works
Surat
3 documents required · 3 mandatory
₹1,180
PANDESARA DIVISION
₹40,000
7 Nov 2026
7 Nov 2026
7 Nov 2026
30 Nov 2026
7 Nov 2026
180 days
3 Estimated Cost Rs.
Rs.1180.00 (As per Clause
Tender Fees (Non Refundable) with
4 mentioned in Instruction to Bidders
Rs.40,000.00 (As per Clause
mentioned in Instruction to Bidders
5 Earnest Money Deposit
Clause No. 10) Exemption in EMD
will not allow.
Date & Place of Pre-Bid Meeting (If
Date : 30.11.2026 on
Last Date of On Line (E-Tendering)
submission of Tender
Time : Up to 18.00 Hrs.
Date 30.11.2026 on
Last Date of submission of Tender
Fee & EMD (Through online Mode)
Time : Up to 18.00 Hrs.
Date : 01.12.2026 on
Date of opening of Preliminary Stage
(Tender Fee & EMD)
Time : Up to 10.30 Hrs.
Date : 01.12.2026 on
Tentative Date of opening of
Time : Up to 11.00 Hrs.
Tentative Date of On line Opening of
Time : Up to 16.00 Hrs.
12 Validity of Tender Maximum period of 180 Days
13 Work Completion Period / Time Limit 24 Months (As per quantum of work)
DGVCL GSTIN No. is 24AABCD8912C1Z3.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Every Bidder has to inform their GSTIN No. at the time of payment of applicable fees.
1. Interested Bidders can view these tender documents online. The bidders who are interested in bidding in
these tenders can download tender documents from
website https://tender.nprocure.com and www.DGVCL.com
Bidders, who wish to participate in this tender, will have to register on https://tender.nprocure.com Further,
Bidders who wish to participate in online tenders will have to procure Digital Certificate as per Information
Technology Act-2000 using which they can sign, their electronic bids. Bidders can procure the same from GNFC,
Ahmedabad, who are licensed certifying authority by Government of India and they will assist them in procuring
the same as below mentioned address. Bidders who already have a valid Digital Certificate need not procure a
new Digital Certificate.
n) Code solutions-A PANDESARA DIVISION of GNFC Ltd.,
301, GNFC Info tower, S.G. Road, Bodakdev.
Ahmedabad – 380054 (Gujarat)
Email: [email protected]
2. However, no physical documents required if payment of tender Fee and EMD made through,
RTGS & NEFT(upload receipt online on https://tender.nprocure.com ).
3. Further bidders are requested to submit price bid (Schedule: B) on-line only and not to submit the price bid
in physical form. This is mandatory. If price bid is submitted in physical form, such offer shall be out rightly
4. It is mandatory for all the bidders to submit their tender documents with all relevant documents as desired
in participation of this bidthrough on-line (e-tendering) in schedule time. If tender documents with all
relevant documents submitted in physical form, in that case the online submitted documents shall be
5. Bidders should be in touch with websites https://nprocure.com&www.dgvcl.com for intimation
regarding revision/corrigendum/Amendment in tender till due date of online submission and
thereafter. No separate information shall be sent in this regards and also not publish in
newspaper. The directives and amendments issued by DGVCL will have superseding effect to
relevant section and specifications.
6. Any technical questions, information & clarification that may be required pertaining to this inquiry should
be referred to Executive Engineer PANDESARA DIVISION Office, “Dakshin Gujarat Vij Company Limited”
7. DGVCL reserves the right to reject any OR all tenders without assigning any reasons thereof.
8. Bank Details:
Bank Name: Bank of Baroda
Account Name: DGVCL IND DIV PANDESARA
Account Number:
IFSC Code: BARB0INDPAN
[Note-It is compulsory to mention Tender ID and Bidder name in reference for transaction
confirmation purpose of Tender Fee & EMD. Received online]
If payment make through RTGS/NEFT to the above account then share your UTR No. To the E-Mail
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
ID: [email protected] Also quote your name & amount paid.
You have to compulsory inform to detail regarding Online payment of tender fee and EMD at This office on E-Mail ID:
Executive Engineer
DGVCL, PANDESARA DIVISION
Download Tender Documents in (PDF Format) which consists of:
6. Schedule – A
7. Instructions to Bidder
8. General Conditions of Contract
9. Schedule “B” indicating the quantities, rates & items, drawing if any.
10. Appendix and Annexure
11. Technical Specifications & GTP’s
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe
TENDER DRAFT NOTICE No- 51 DTD
SUB:- Tenderization of Emergency work of locate 22kv / 11kv UG cable fault locating & attending the fault by providing
joining kit etc. [suitable Straight through joining kit & Outdoor end termination kit to be supplied by contractor and 22kv /
11kv XLPE cable will be supplied by DGVCL] under All Sub divisions area under Pandesara Division.
Description Page No.
Section-A: Letter of Invitation of Tender & instructions to the
Section-B: Technical Scope of Work, General Condition of
Section-C: Schedule-B: Schedule of price.
04 Section-D: Schedule of General Particulars. 16 to
Section-E: Other condition of supply, Labor Laws 26 to
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Section-F: Commercial terms and condition and Safety Rule,
Special terms and condition.
INVITATION OF TENDER & INSTRUCTIONS TO THE BIDDERS
BIDDER TO SATISFY THE ENTIRE FOLLOWING QUALIFICATION REQUIREMENT.
1. Experience of having successfully completed similar works during last 7 years ending last day of
month previous to the one in bid applications are invited should be either of the following :
1. Three similar completed works costing not less than the amount equal to 40% of the estimated cost.
2. Two similar completed works costing not less than the amount equal to 50% of the estimated cost.
3. One similar completed works costing not less than the amount equal to 80% of the estimated cost.
2. Average Annual financial turnover during the last 3 years, ending 31st March of previous financial year, should be at least 30% of
the estimated cost and latest Solvency certificate must be attached.(i.e. 2021-22, 22-23, 23-24)(C.A certificate for turnover of last
3. The bidder shall have valid Electrical Contractor License of Gujarat and registered under Sales-Tax Act, Service Tax Act,
GST, should have PF Registration Certificate, Type test.
4. Partnership Deed Attached Online
5. Bids with Consortium Members Joint Venture are not allowed. All supporting documents are required to be attached for verifying &
confirming the all the 5 (Five) pre-qualifying conditions.
The owner may assess the capacity & capability of the bidder, to successfully execute the scope of work covered under the work.
1. Document verification
2. Bidders work/manufacturing facilities visit
1. Manufacturing capacity, details of work executed, works in hand, anticipated in future & the balance capacity available for the
present scope of work
1. Details of testing facilities ,manpower and financial resources
2. Details of quality system in place
3. Past experience & performance
4. Customer feedback & Banker’s feed back
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
6. ADDITIONAL DOCUMENTS:
Apart from various documents to be furnished along with the Bid as required in the GCC and ECC, the following documents/details are to
be furnished by the Bidder:
1. Regn. No. under Shops & Estt. Act/ issuing authority
2. Details of Partners/Directors of the Firm/Company.
3. Experience Record and details of orders pending / executed for various utilities
4. Last three years Audited Accounts
5. Detail of Manufacturing/Fabrication facilities.
6. Factory Registration/license details
7. Solvency certificate from Bank (up to 20 % of Bid value).
1. Tenders for the said works are invited in accordance with the following:
a) Section-A-This letter regarding invitation to tender and instructions to Bidder.
b) Section-B Technical scope of work and General Condition of Contractor as per attached.
c) Section-C-Cost of equipment and other charges as per schedules B. (-C)
d) Section-D-Schedule of General Particular.
e) Section E- Other Condition of Supply, Labor Laws.
f) Section-F- Commercial terms and condition and Safety Rule, Special terms and condition. (Applicable for erection/works to be
carried out at site).
g) Conditions mentioned in This Invitation of Tender & Instructions to the Bidders shall over ride similar conditions mentioned in the
“General terms and conditions of contracts enclosed as Section-E. If you are in a position to quote, your tender should be submitted to this
office on or before due date.
h) In this offer the word “DGVCL” means DGVCL, Surat having its corporate Office at Nana Varachha Road, Kapodra, Surat .Printed
terms & conditions of the Bidder will not be considered as forming part of the tender.
j) Bidder must indicate the official designation and authority of the individual signing
The Bidder shall submit their P.F. code no. allotted to them by Regional P.F. Commissioner and copy of chalan through which PF deposit
in provident office. Failure to do so is likely to result in the offer being ignored.
The tender will be opened on the date and time specified as above in office of the Ex. Engineer (O&M), DGVCL, Pandesara, Surat in
presence of the authorized representatives of the Bidder, who wish to remain present at the time of bid opening.
Bidder is responsible for ensuring that the bids are actually received well in time and at the place mentioned above only. DGVCL shall be
neither responsible for late
Tender neither receipt nor shall entertain Tenders received after due time and date.
3. INFORMATION:
Tender Fee & Earnest Money Deposit Paid Online..
Tender Fee-All the Bidders will be required to pay Tender Fee plus applicable GST as mentioned in the tender Document either in cash(up
to Rs.10000/-Only) at the office Add., specified in the tender document or by RTGS/NEFT/Online.
The Executive Engineer (O&M), Dakshin Gujrat Vij Co. Ltd., Pandesara Division Office, Opp. Batliboi Co., Udhana-Bhestan
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Road, Surat-395023(Post-Bhestan)
4. OFFER TO BE MADE ACCORDING TO TENDER DOCUMENTS:
The offer/Bid shall be in accordance with and responsive to this tender specifications only. Incomplete tender, amendments and additions
to tender, are liable for rejection. Printed General terms and conditions of the Bidder shall not be accepted. The bidders should quote for
minimum one circle. However all price bids should be filled up for online price bid submission.
5 EARNEST MONEY DEPOSIT:
If the EMD amount is more than Rs. 3 Lakhs, it should be paid either by RTGS/NEFT/Online, Or Demand Draft Or Banker’s Cheque Or Pay
Order Or Bank Guarantee. Otherwise, it should be paid either in Cash (up to Rs. 10,000/- only) at the office address specified in the tender
document or RTGS/NEFT/Online it is.
The EMD shall be forfeited by the DGVCL upon failure of the Bidder to hold his offer open in accordance with the terms of this invitation to
The EMD will be released in accordance with the following conditions.
a) In the case of the successful Bidder, the EMD will be refunded after the Bidder has furnished fully security deposit in accordance
with clause 10 below.
b) In the case of unsuccessful Bidder, the EMD will be refunded after the execution of a contract with the successful Bidder or “after
the validity of his” tender expires, whichever is earlier.
If the successful Bidder withdraws his tender within the validity date or fails to give the required security deposit within the time specified
in General Terms and Conditions, he shall be liable for any difference by which the cost of procuring the supplies/works exceeds the
amount of his tender and the EMD shall be adjusted towards off-setting such difference. ( Exemption in EMD will not allow.)
6.00A1 SECURITY DEPOSIT:
Successful Bidder shall pay security deposit equivalent to 5% of the order value within a week from the date of issue of letter of Intent.
The Security Deposit shall be paid by Online, this security deposit will be valid till work completed satisfactorily and final bill is paid.
6.00A2 This Security Deposit is for the due performance of contract and the same is liable to be forfeited by the DGVCL in event of non-
fulfillment of the terms & conditions of this contract by the contractor.
6.00A3 Refund of S.D. will only be made on return of the original money receipt given by the DGVCL or in case of loss of the receipt the
contractor shall furnish an indemnity Bond duly stamped under the Bombay stamps act.
7.1 The Bidder shall quote firm prices only. The prices quoted will not be subject to any escalation till completion of work except of
statutory variation taxes.
The tender shall remain open for acceptance for a period of One hundred Eighty (180) days from the date of price bid opening. The
DGVCL will intimate the date and time for opening of price bids, after receipt and scrutiny of Technical bids.
Any further extension of validity, if and when requested, shall be given without changing prices, terms and conditions. Also the validity of
EMD shall be extended accordingly.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
The Bidder shall have to furnish attested copy of Registration Certificate issued by GST Deptt. Mentioning GST Tax Registration No. and
the same is to be shown in each invoice.
8.1. INCOME TAX:
Deduction of Income Tax from the bill shall be made as per Income Tax Rules prevalent at the time of payment.
9. PAYMENT TERMS:
9.1 No advance payment shall be made.
1. 100% Bill amount to be paid on Successfully completion of work. Bills for this purpose to be raised on basis of actual work
10. PENALTY FOR DELAYS:
The delivery, erection and commissioning periods (as applicable) shall be guaranteed under penalty clause mentioned below. Any delay
that may take place in erection and commissioning activities beyond contractual cut of date shall be subject to penalty at the rate of
1/2% of the sub contract value (of delayed materials/works) per week or part thereof subject to a maximum of 10% of the total order
INSURANCE ERECTION AT SITE:
This is entirely in the scope of the Bidder; the bidder will have to make their own arrangements for insuring the all materials and
equipment’s possessed by him and also for Laborers etc. The DGVCL will not be responsible for any loss or damage either to Bidder’s
personnel or to the equipment/materials.
12. PRINTED TERMS & CONDITIONS WILL NOT BE CONSIDERED:
Printed terms & conditions of the Bidder will not be considered as forming part of the tender.
13. DESIGNATION & AUTHORITY OF THE PERSONS SIGNING THE TENDER:
Bidder must indicate the official designation and the authority of the individual signing the tender.
14. Bidder is responsible for tenders are actually received in time at online.
15. CANVASSING NOT PERMITTED:
Bidder should not canvass their offer personally or otherwise by approaching to any Officers of the DGVCL. If any Bidder wants to make
any representation regarding his offer, he should write to undersigned, but personal oral representation is not permitted.
Inspite of the above clear instructions, if any Bidder is found to canvass his offer or against his competitor’s offer through personal
approach to officers of the DGVCL, his offer will be rejected without assigning any reason and the firm may even be blacklisted.
16. CLARIFICATIONS REQUIRED BY BIDDER:
If any Bidder require any information and/or clarification on any point of technical or commercial nature pertaining to this tender enquiry
or on any of the conditions or requirements indicated in the tender documents, the same should be given in writing in duplicate to the
under mentioned authority.
Executive Engineer (O&M), D.G.V.C.L., Pandesara Division Divn., Surat
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
TIME LIMIT:- The time limit of the work order is 24 Month.
17. ARBITRATION CLAUSE:
All questions, disputes or differences what so ever which may at any time rise between the parties to this agreement touching the
agreement or subject matter thereof, arising out of or in relation thereto and whether as to construction or otherwise shall be referred to
an arbitration (s) appointed under the provision of the Arbitration & Conciliation Act 1996 as amended from time to time and the rules
made there under.
Necessary contract agreement shall have to be executed in prescribed format by successful bidder on a stamp paper of appropriate value
of Rs. 300/- and Indemnity Bond Rs.300/- at their own cost. The agreement is to be executed for the complete work referring to this work
order and shall be signed by an authorized person of your company with seal of the bidder. For this purpose, their authorized signatory
shall have to visit this office on any working day, as some of the documents have to be signed in presence of DGVCL’s officials.
19. TERMINATION:
The DGVCL may terminate the contract at any time by giving a written notice of 30 days for any case if your performance as a whole OR
part, is found unsatisfactory. Whether terminated for a cause of convenience, payment to the actual work done and the calculated pro-
rata and not to lump sum amount payable under the normal conditions for the successful completion of the entire work. In addition in
case of contract is terminated for convenience and though no fault of you. You shall be paid also for commitments, which cannot be
terminated and paid at the time of termination. Upon receipt of written notice, you shall attempt to terminate all commitments and
otherwise minimize all costs.
To order that the work of the contractor be measured up and to take such part thereof, as shall be unexecuted, out of his heads and to
give it to another contractor to complete, in which case, any expenses, which may be incurred in excess of the sum, which would have
been paid to the original contractor, if the whole work had been executed by him (as to the amount of which excess expenses the
certificate in writing of the Engineer-in-charge shall be final, conclusive and shall be borne and shall be paid by the original contractors
and shall be deducted from any money due to him by the DGVCL under the contract or otherwise from his security deposit of the proceeds
sale thereof or a sufficient part thereof.
20. FORCE MAJEURE:
Force majeure is herein defined as
(1) Any cause which is beyond control of a Seller or The DGVCL as the case may be
(2) Natural phenomena including but not limited to weather condition, floods, droughts, earthquakes and epidemics
(3) Acts of any Governmental authority domestic or foreign including but not limited to war, declared or undeclared, priorities,
quarantine, embargoes, licensing control or production or distribution restrictions
(4) Accidents and disruptions including but not limited to fires, explosions, breakdowns, of essential machinery or equipment and
(5) Transportation delay due to force majeure or accidents :
(6) Strikes, slowdown, lockouts and sabotage
(7) Failure or delay in the Seller’s source of supply due to foregoing force
majeure causes and
8. Failure to reach agreements as set forth below.
(A)The Seller shall not be liable for delays in performing his obligation resulting directly or indirectly from any Force Majeure cause as
referred to and defined in paragraph (a) above.
(B)The Seller shall within 10 days from the beginning of any such delay notify the DGVCL in writing of the cause of delay.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
(c)The DGVCL shall ascertain the facts and the delivery period shall subject as hereinafter provided, be extended for a period equal to the
time lost by reason of any such cause even though such cause may occur after the Seller’s performance of his obligation has been
delayed for other causes. If such delay lasts for more than 6 months, the DGVCL and Seller shall immediately consult each other for
purpose of agreeing upon a reasonable basis on which the contractor shall resume production of the unfinished equipment and if the
parties do not agree upon a solution of the problems involved, including adjustment of the price, such price adjustment being both
upwards and downwards depending on the variation in the base indicates of materials and labour (Provided however if complete dispatch
is made within 12 months from the commencement of delay there shall be no price adjustment) then either party may, by written notice,
cancel that portion of the equipment which is delayed. In the event of cancellation, the parties shall endeavor to agree on the amount of
reasonable and proper cancellation charges, if any, if they fail to reach an agreement within 90 days after the date of cancellation, either
party may refer the matter to arbitration pursuant to Article 40. All the provisions clause shall apply whether the disruption caused is total
or partial in its effect upon the ability of the Seller to perform.
21. If you are in a position to quote, your tender in quadruplicate should be submitted to this office on or before due date. If the Bidder
wishes, he may familiarize himself with the site conditions by visiting plant / site office. Any representation at a letter date in this regard
shall not be entertained. On production of proof of purchase of the tender documents, the site officers will permit for site visit.
The DGVCL reserves the right to accept any tender and or to reject any or all tenders without assigning any reason thereof. No
correspondence shall be entertained in this regard.
Yours faithfully, Enclosure:
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
TECHNICAL SCOPE OF WORK
Name of Work :- Emergency work of locate 22kv / 11kv UG cable fault locating & attending the fault by providing joining kit
etc. [suitable Straight through joining kit & Outdoor end termination kit to be supplied by contractor and 22kv / 11kv XLPE
cable will be supplied by DGVCL] under All divisions area under Pandesara Division. .
Intent of specification:-
The scope of work to be done under this contract has been outlined under various sub specifications here under. The contractor shall refer
to appropriate clauses and also visit site of appraise himself about the site for smooth & trouble free execution of work.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Technical Conditions of Contract:
1. Laying of 11 KV / 22 KV U/G cable
1. The local contact office working in full fledge should be opened with a responsible person appointed there by successful bidder so
that the responsible person can be contacted easily.
2. Straight through joint kit & end termination kit will be supplied by contractor as per IS standard specified in this tender. Also the
supplier of the kits should be registered vendor of any of the seven companies of GUVNL. The copy of above registration letter as
vendor is required to be submitted with tender (Technical Bid).
3. Before laying of cable 100 mm Layer of good sand is to be provided under the cable.
4. Contractor has to provide good quality & specified size of RCC half round pipes.
5. Contractor has to transport 11 kV / 22 kV cable drum from TAPI store or Urban Store to site and empty drum from site to store at
his risk & cost.
6. Cable ends should be sealed properly whenever cable is cut & laid before providing straight/end termination to prevent ingress of
moisture/ water/dust etc.
7. Contractor has to carryout work in co-ordination with Municipal Corporation, Nagarpalika, forest department, PWD, Telephone and
other such Govt. agencies.
8. Proposed Plan/ Electrical Lay Out of work should be approved from Electrical Inspector prior to execution of work at his cost, Also
before commissioning of work same should be inspected by Electrical Inspector. All Formalities for the same should be completed by
Bidder adhering to Indian Electricity Act 2003. And Final Inspection Report from Electrical Inspector should be submitted to DGVCL.
TECHNICAL SPECIFICATION FOR 11/22 KV XLPE UNDERGROUND CABLE.
This specification lays down the material properties. Performance requirement of 11/22 KV XLPE Cable termination and jointing system
for use on electrical systems operating at voltage 11/22KV (i.e. voltage at which the cable termination kit is meant for).
EXCAVATION OF TRENCH AND STRAIGHT JOINT PIT:
The Contractor shall have to dig the trench for 1200 mm depth and 400 mm width (for single cable) & 600 mm width (for double
cable) as per instruction of Engineer-in-charge. For 600 mm width, trench length will be considered as one & half (1½) times the length for
400 mm width and payment shall be made accordingly.
Pit for straight joint have to Excavate for 2100mm wide & 1200 mm depth & if more size pit excavate proportionate
rate should be given & agency is fully responsible for excavate pit either by JCB or manually.
LAYING OF XLPE CABLE IN TRENCH AND REFILLING OF TRENCH:
In cable trench sand layer shall be prepared for 100 mm thick & 11 kV / 22 kV XLPE Cable of size up to 240 mm2. to be laid on sand layer
covering the cable with 150 mm diameter x 10 mm thick and 1.0 meter long RCC half round muffs (to be supplied by contractor) and
refilling the same, as per Instruction of Engineer-in-charge
ERECTING XLPE CABLE ON D.P. STRUCTURE
The XLPE cable shall be erected on DP structure in such a manner that cable should be 8 meters above ground level in 100 mm HDPE
(3000 mm in length) and HDPE should be erected 300 mm below ground level and 2700 mm above ground level with G I clamping on both
ends. The XLPE cable should be clamped on DP structure with proper Polymer clits. The material shall be supplied by contractor.
EARTHING OF CABLES ON D P STRUCTURE
Pipe type earthing should be provided & fixed from 80 mm dia class-B GI pipe with pit to be filled with salt & coke and construction of
chamber as per DGVCL Drg. No. dg /100 for DP and cable. All materials including joining of cable with earth pit pipe by providing 1” wide
G.I. strip will be supplied by bidder.
Fixing of end termination & straight through joints.
1. Contractor should clarify the make of cable end termination and straight through joint. The heat & shrink type end termination &
straight through joints shall be utilized for the job.
2. Dual wall molded type should be available in straight through joint.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
1. After completing work of cable laying end termination straight through joints, following test shall be carried out jointly by engineer
in charge of DGVCL and contractor.
2. (A)Insulation resistance test before & after with 5 KV insulation tester. (B) Hypo test.
3. Contractor has to furnish Guaranteed Technical Parameters (GTP) type test certificate of various tests conducted at any Govt./ NABL
approved laboratory for the joints they intend to supply for this job. The test certificate should not be prior to 5 years from the date
of tender. The contractor shall have to submit the same with technical bid and failure in which technical bid will be disqualified & the
price bid of that party will not be opened.
4. One competent skilled supervisor shall have to co-ordinate the site authority and he has to do all communication with engineer in
charge of DGVCL.
5. It is essential to have suppliers certificate of training for cable jointing of cable jointer.
6. Jointer has to ensure safety while making joints so that other nearby cables will not damaged. If any damage to any other utility
then it will be liability of Bidder. DGVCL will not be responsible for this.
7. The material of jointing kit will be inspected at manufacturer’s works by the inspector of DGVCL. The bidder has to give inspection
call 15 days in advance to EE (O&M) for the works to be carried out in their jurisdiction.
24. The Bidder shall have to supply cable end joint / straight joint kit as per IS 13573-1992 with latest amendment No. 2, 1998 IEEE 48-
1990 and shall be Class -1, ESI-09-13 performance specification for high voltage cable accessories.
25. The work of laying of cable along the road / road crossing to be carried out by Horizontal Drilling Machine/ Auger boring machine
enclosed in HDPE Pipe only.
CLASS OF TERMINATION:
The XLPE 11 KV Link Line shall be class 1 termination as per appropriate ISI code nos. i.e. IEEE-48-1990.
APPLICABLE STANDARDS:
IS 13573-1992 with latest amendment – Latest amendment No. 2, 1998. IEEE 48-1990. The termination shall be Class 1. ESI-09-13
performance specification for high voltage cable accessories. The cable accessories being supplied in the form of kit which has different
components to be assembled at site.
The term 11 KV / 22 kV XLPE Cable refers to extruded or Molded Polymeric. Polymeric material which are cross linked by gamma
radiation to develop elastic memory and supplied in an expanded or otherwise deformed size and shape. Bidders should submit the proof
that the tubes are cross linked by gamma radiations. However chemically cross linked, crotch seal and lug seals are permitted. For straight
joints, the insulation over the ferrules should be reinsulated by dual wall tubing. This should have an inner insulating layer vulcanized to
an outer semi- Conducting layer. This is required to ensure reconnection of cable insulation screen of the core from one end of the joint to
the other. The dual wall tubing ensures that there is no entrapment of air pockets between the insulating and semi‑conducting layers.
11 kV / 22 kV XLPE underground flexible polymeric tubing, preferably black colored pre coated with adhesive shall be provided for sealing
the exposed metallic sheaths and sheath/earth connections.
PROVISION OF ADDITIONAL CREEPAGE INDOOR / OUTDOOR TERMINATIONS:
Single piece, 11 KV XLPE underground cable, weather sheds having non-tracking, erosion and weather resistant properties shall be
supplied with the kits for application over non‑tracking tubing. The quantity of sheds to be supplied shall depend on voltage grade and
indoor/outdoor application and shall be indicated along with offer. Each shed shall give an additional creep age length of at least 100mm.
INSULATION AND SCREEN REINSTATEMENT FOR JOINTS:
The reinstatement of insulation shall be by means of heat shrinkable, flexible, polymeric tubing made from a discharge resistant polymer,
preferably colored red. The tubing after complete recovery shall have a minimum wall thickness to ensure provisions of adequate
insulation in step.
EARTH & SCREEN CONTINUITY FOR TERMINATION & JOINTS:
Screen continuity by using tinned copper mesh and earth continuity by using tinned copper braids of appropriate size shall be provided for
transfer of screen/earth in straight through joints. In termination, tinned aluminum/copper braids of appropriate size or equivalent current
carrying capacity of cable conductor along with aluminum /copper lugs of appropriate size shall be provided for continuity of screen to
armour to the earth.
LUGS & FERRULES:
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
The requisite number and type of aluminum/ copper lugs/ferrules shall be provided for termination/joints. The Lugs and ferrules for XLPE
cables shall be crimping type suitable for compacted circular conductor having two nos. of holes.
List of documents forming part of the contract:
1) DGVCL’s Tender Specification No-. Tender No.
2) DGVCL’s Contract booklet – “Tender & Contract of Works”.
13. TECHNICAL SCOP OF WORK:
1. The Technical Specification shall be as per Schedule-B. After completion of work of cable termination of ends, the following test
shall be Carried out by the contractor in presence of DGVCL Engineer in charge of the Work.
2. Insulation resistance test before & after Hypo test with 5 KV insulation testers.
4. Bidder has to furnish test certificate of all type tests conducted at any Govt./NABL approved laboratory for jointing kits of approved
make only. The test certificate should be of a date prior to 5 years from the date of tender.\
5. Contractor site engineer/supervisor shall have to co-ordinate with DGVCL and carry out all communication with the EIC.
6. Cable jointer employed by bidder for cable jointing work shall have to submit Cable jointing kit manufacturer’s/supplier’s certificate
of training for cable jointing work.
7. It is essential to have suppliers certificate of training for cable jointing of cable jointer.
8. It is essential to have suppliers certificate of training for cable jointing of cable jointer.
(viii)Cable jointer will have to ensure that adjacent laid cables are not damaged while carrying out cable jointing work.
(ix) All Materials required for Erection will be supplied at the Company store at Urban Store & R.S.O.Navsari
1. The Technical Specification shall be as per Schedule-B.
The Under Ground Cable to be laid is 3000 meter. You have to excavate a trench of size 1200 mm deep &400 mm wide for first cable. For
spare cable or an additional cable trench 200mm width to main trench is to be excavated. The rate for 200 mm wide trench will be
considered as half the rate of 400 mm wide (as Item No.1 of Schedule “B”)
Before digging work, you are requested to take permission of Gujarat Gas. The Telephone is as under.
#Dial 9924003000 before you digs. #For Damage dials
#Toll Free Emergency number
TECHNIAL INSTRUCTION TO THE TENDERER
1 Tender fee is non refundable.
2 The Tenderers shall have to submit the Tender duly filled in without any additions / alterations, by Online only. The Tenderers are
forbidden from furnishing their own printed / typed commercial and other terms and conditions.
3 The tenderers shall specifically note that the Tenders are invited on percentage basis only.
4 The Tenderers shall specifically note that the quantities mentioned in the Tender are likely to vary as per the actual requirement /
work involved. As such, the successful Tenderer shall have to execute the work at the same rates of the order for the changed / increased
quantities, if any, without any extra compensation whatsoever.
5 The Tenderers will ensure submission of the Tenders duly filled in before the due date and time, Online only. Offer by Hand
Delivery or By Courier will not be accepted.
6 TENDERER HAVE PAID TENDER FEE BEFORE OPENING OF THE TENDER. THE COPY OF MONEY RECEIPT SHOULD BE ENCLOSED
Online THEN DOCUMENT FOR EMD TO BE ENCLOSED Online.
7 Tendered is not allowed to transfer their offer to other firm who have not purchased the tender document nor to the firms who
have purchased the tender document.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
8. REPEAT / ADDITIONAL ORDERS:
The Company reserves the right to place repeat orders / additional orders on the successful Bidder up to 50% of the original quantity of
the A/T at the same prices terms and conditions stipulated in the original order mutually agreed upon.
9. The Company’s General Conditions of contract will apply to all contracts and supplier will be deemed to be fully aware of the
Company’s general conditions of contract for the supply of plant equipment and materials except the conditions modified in this
commercial terms and conditions and any ignorance of these Conditions, will not exempt supplier from their liability to abide by the same.
Copies are available from the Division Office.
[NOTE: - if you are the lowest than , You had to pay SD, Execute the agreement, Indemnity Bond, P.F., License Copy,
Original solvency Certificate, PAN Card No., PF Registration No, GST Registration No, Sub order may be issue after
complete the above official tender formalities.]
4. GENERAL CONDITION OF CONTRACTOR:-
1. Quantities: - The quantities mentioned in the accompanying schedule are only approximate, Actual quantities may increase or
decrease according to the local conditions. The company reserves the right or revising or deleting any of the quantities to be erected
by during the execution of the contractor and the final quantities actually erected by the contractor will be calculated and paid for at
the rates given in the contractor schedule of rates.
2. Whenever there is an excess work carried out by a contractor beyond the technically sanctioned amount against the work order, the
approval for the excess quantity of work done should be obtained from the competent authority as per Company’s rules.
3. Dakshin Gujarat Vij Co. Ltd. Does not bind itself to accept the lowest or any tender.
4. Closing down and recommencement of works at all stages must be intimated by the contractor to Engineer-in-charge or Vice-versa
in writing with reasons if any failing which their claims for extension of time will not be entertained.
5. The work will have to be carried out as per programmed fixed out by the Company and the contractor should employ proper and
competent supervisors who should thoroughly supervise the execution of work by being on present on the work site through out.
6. No tools will be supplied except jointing dies by the Company and the Contractor should make his own arrangement to get adequate
quantities of all other tools in order to complete the job within the prescribed period jointing dies will be supplied free of charge.
7. The contractor shall be responsible for breakage, loss, theft of materials during transit or erection issued to him from stores till the
time, the work is handed over to and taken over by the Company.
8. Starting of work and commenced period: the erection work should be commenced within 7 days from the date specified in the order
issued by the Executive Engineer and should be completed within the prescribed period for each work.
9. Minimum period of Guarantee if during 12 calendar months from the date of handling over charge after completion of work the
erected lines are found defective in any way, the same should be rectified by the Contractor.
10. All the general conditions of contract to the company will be applicable to this order. An agreement is to be sighed in the prescribed
11. R.A. Bills – Bills will be prepared once a month looking to the progress of the work and payment will be as under.
12. Running bills may be paid on the works carried out after measurements are recorded upto 80 % and on submission of material
account by the contractor.
13. Final bill for the contract will be paid after completion of work recording measurement and after submission of materials account by
the contractor.
12. No material of the company’s should be left on the lines without supervision.
13. For stringing of the alluminium of A.C.S.R. Conductor alluminium or wooden pulley must be used for supporting the conductor on
14. While executing the stringing work, the contractor will have to use proper device for rotating the conductor drum required for
unwinding of the cable.
15. Contractor must get the requisition, three days before he requires the materials on site from the Engineer-in-charge.
16. The payment through R.A. Bill shall be made only to extent of 80% of the total value of the work done. The amount so with held will
be released on furnishing by the contractor the material account statement of the relative R.A. bIll.
17. The contrctor after completion of the work shall prepare & tender the final detailed materials account of the materials received by
him from the Company’s stores within one month from the date of completion of work,if,however the contrctor does not tender the
material account a Register A.D. Notice will be issued to him, if within ten days from the date of issue of such notice there is no
replay from the contrctor, the material account will be finalized and recoveries made as per the Company’s account which shall
have to be account which shall to be accepted by the contractor. Disputes if any raised later shall not be entertained.
18. The contrctor is bound to complete the work within the specified period for each work, given by the Executive Engineer.
19. The Contrctor will remain in force for the period of 1 year from ______________________________ to___________________________.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
20. Priority of work would be decided by the Executive Engineer and contractor shall carry out the work within the stipulated period for
the order issued by the Executive Engineer.
21.The contractor must have adequate resources and gang of unskilled and skilled persons to under-take the work at different place.
22. The contractor will be given separate order for each work on the basis of the rate contract order, the date of commencement and
date of completion of work will be stipulated in order which the contractor has to agree otherwise the penalty will be livable for the
completion of work as per Company’s standard condition.
23. The soil may be hard or normal the tender should fill in the rate after seeing the site.
24. The contractor shall be responsible for returning the residual materials after completion of the contract and if he fails to return the
balance material supplied to him by the Company, the cost of the residual materials will be recovered from the contrctor at material
account plus 15% It is certified by the contrctor that-
1. Should this tender be accepted I/We hereby agree to abide by and fulfill all the terms and provision of the ‘’ The Tender and
contract for work’’ as applicable and in default there of to forfeit and pay to the Company sum of money as become due.
2. The full value of the ‘’Earnest Money Deposit’’ paid herewith shall be absolutely forfeited to the Company should I/We not deposit
the amount of specified security deposit-in-time.
3. The competent can delete any item in Schedule ‘’B’’ in the tender.
4. I have filled in rates after visiting the site of work personally.
Date: Signature of Contractor
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Description of Work. Qty. Unit Rate
Labour charge for excavation of
2100mm long x 1200mm wide x
mm deep joint pits for installation of
11kV / 22kV Straight through joints as
1. per instruction of engineer-in-charge & No
covering the cable with 150 mm dia
(Outer), thickness 25 mm, 1.0 meter
long RCC half round muffs & refilling
same as per instruction of EIC .
Supply & fixing of heat shrinkable
straight through joint type for upto
22kV 3C x 185 mm2 size XLPE cable as
2. per DGVCL technical No
specification(Using Approved make
cable kit as per DGVCL technical
Supply & fixing of heat shrinkable
straight through joint for upto 11kV 3C
x 185 mm2 size XLPE cableas per
DGVCL technical specification. (Using
Approved make cable kit as per DGVCL
technical specification)
Supply & fixing of heat & shrinkable
4 end terminations (Indoor/outdoor) for
upto 22 kV 3C x 185 mm2 size XLPE No
cable as per DGVCL technical
specification(Using Approved make
cable kit as per DGVCL technical
Supply & fixing of heat shrink type end
terminations (Indoor/outdoor) for upto
11kV 3C x 185 mm2 size XLPE cable as No
per DGVCL technical
specification(Using Approved make
cable kit as per DGVCL technical
5 specification)
Work of fault finding 11/22 cable under Nos
ground XLPE cable fault locating exact
6 place of fault.
Consecutive more than one Fault Nos
Finding on same cable till the cable
7 charged fully.
8 Labour charge for excavation of cable Meter
trench of 400mm width x 1200mm
depth, in any type of soil for laying of
cable of size up to 240 mm2 (For
additional cable 200 mm additional
width shall be considered i.e. half
trench length is to be considered)
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
9 Labour charge for laying of 11kV / 22 Meter
kV XLPE Cable of size up to 240 mm2 &
preparation of sand layer 100mm thick,
in the cable trench & covering the cable
with 150 mm dia (Inner), thickness
mm, 1.0 meter long RCC half round
muffs and providing and fixing of
4inch width yellow colour polyethylene
tape with printing "CAUTION ELECTRIC
CABLE BELOW" at 0.75 m depth from
ground surface after laying cable in
trench. This will provide indication that
electric cable is passing underground
so as to protect cable from mechnical
injuries, refilling the same, as per
Instruction of Engineer in Charge (EIC).
10 Labour work for RCC concreting on CMT
disputed location and repairing of
damage portion of road crossing for the
work carried out for roads crossing as
well as concreting & muffing of ploes
including all materials (1:2:4)
11 Providing & fixing concrete stone route NO
marker of 300 mm width x 150 mm
thick x 650 mm height embedded in
earth at least 300 mm below &
mm above ground level respectively at
distance approx 50 meters along the
length of cable. The RCC concreting
(1:2:4)(all necessary maeterials will be
in bidder's scope) of route marker is to
be carried out 300 mm width x 150 mm
thick x 300 mm below ground level
as per instruction of EIC. The route
marker should be with name of
company with approved yellow colour-
DGVCL. The distance from marker to
cable and cable depth with feeder
name etc., marked with arrow sign is to
be painted on it.The route marker is to
be fixed at location near to any fixed
permanent location (not necessary to
fix exact on top of cable) as per
instruction of EIC.
12 Providing and fixing of pipe type No
earthing from 80 mm dia class-B GI
pipe with pit to be filled with salt &
coke and construction of chamber as
per DGVCL Drg. No. dg /100 for DP and
cable. The earthing pit should be
joined with cable by G.I. strip of size 1”
width & 2 mm thick. All material GI
pipe, Coke, Salt etc will be supplied by
13 Labour charge for erecting of 11kV /
kV XLPE cable of size up to 240 mm2
on DP Structure with fixing of 02 Nos
polymer cleats on top and middle Per Job
part. Polymer cleats, nut bolts etc.
fixing material to be provided by
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
14 Providing & fixing of 6.11kg/cm2
class-4,Green color, 110mm O.D.
8.5mm thickness H.D.P.E. pipe confirms
to IS 4984 and BIS certification on the
erected DP structure for the
mechanical protection of cable by
inserting the cable inside HDPE pipe.
The HDPE pipe shall be erected in such
a way that 300mm shall be below the
ground level and the rest 2700 mm
shall be supported on the DP
Structure with 01 No Polymer cleat.All
materials including polymer cleat and
Nut bolt to be provided by contractor.
15 Testing of cable at various points and
commissioning the feeder as per
instruction of engineer-in-charge.Test No
result shall be submitted by contractor
16 Supply & fixing of heat shrink type end
terminations (outdoor) for 11kV 3C x
240 mm2 size XLPE cable as per
DGVCL technical specification(Using
Approved make cable kit as per DGVCL
technical specification)
17 Supply & fixing of heat & shrinkable
end terminations (outdoor) for 22 kV
3C x 240 mm2 size XLPE cable as per
DGVCL technical specification) (Using
Approved make cable kit as per DGVCL
technical specification)
18 Supply & fixing of heat shrink type end
terminations (indoor) for 11kV 3C x
240 mm2 size XLPE cable as per
DGVCL technical specification) (Using
Approved make cable kit as per DGVCL
technical specification)
19 Supply & fixing of heat shrinkable
straight through joint for 11kV 3C x
mm2 size XLPE cableas per DGVCL
technical specification. (Using Nos
Approved make cable kit as per DGVCL
technical specification)
20 Supply & fixing of heat shrinkable
straight through joint type for 22kV 3C
x 240 mm2 size XLPE cable as per
DGVCL technical specification(Using
Approved make cable kit as per DGVCL
technical specification)
RS TEN LAC ONLY . Total
ABOVE/BELOW___%
In Words:- Eighteen Lacs only.
Note: (1) Above rates are inclusive of all taxes, levies, duties & PF etc. Exclusive of GST
(2) 22KV XLPE cable will be supplied by DGVCL.
(3) Agency have to supply and provide end termination and St.Jointing kit of 11/22KV rating of
Raychem/ 3M/ dension/tyco brand for the work as per G.T.P. attached with tender.
(4) Pit for straight joint have to Excavate for 2100mm wide & 1200 mm depth & if more size pit excavate
Proportionate rate should be given & agency is fully responsible for excavate pit either by JCB or manually.
(5) In emergency, when Dept. fault finding VAN not available, than only item at Sr. No 6 & 7 In Sch-B may be applicable and justification
must be attached.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
SIGN OF CONTRACTOR
Executive Engineer (O & M)
DGVCL, Pandesara Division
NOTES TO THE PRICE BID (FOR SCHEDULE)
1. Above rates shall be inclusive of all taxes / duties / levies and exclusive of GST etc.
2. Bidders shall have to furnish relevant documents for payment of work contractor tax / GST as per applicable along with each R.A.
3. The work shall be executed by successful bidder within the over all tender / work order value.
4. Individual quantities may vary with actual execution of work. The same shall be accepted within the overall value.
5. 11kV / 22kV XLPE cable, RSJ / PSC Pole, Fabrication Material for DP structure, will be issued by the DGVCL. The same shall have to be
drawn from respective RSO / Division Office Store.
6. All other material like RCC pipes, joint kit. HDPE pipes, lugs, heat shrink sleeves, earthing material, cement, sand, kapchi etc. and
any other material required to complete the work shall be arranged by the bidder.
7. reputed make jointing kits shall be supplied and utilized for the entire work. & same should be approved by DGVCL prior to Work
8. The bidder shall have to keep the tender valid for 180 days from the returnable date of the contractor.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
9. The work shall not be sub let to any other contractor.
If any way leave is not available and if it is required to lay additional cable in the existing trench by widening the same trench then the
rate for excavation for laying additional cable will be considered half the rate of item no.1 of Schedule-B.
10. If the cable is required to be laid in double circuit then contractor has to Excavate the trench of size 1200 mm depth and 600 mm
width then trench will be considered as one & half (1½ ) times the dimensions for 400 mm width and the rate should be considered
of item no. 1 of Schedule-B. and payment shall be made accordingly. Similarly for third, fourth or further cable in the same trench
the width of trench to be increased by 200 mm for each additional cable and excavation quantity to be added accordingly.
Signature and seal of bidder
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
(To be furnished with Technical Bid)
SCHEDULE OF GENERAL PARTICULARS.
1.00 Name of Bidders. :
2.00 Address of Bidders. :
3.00 Telegraphic/Telex Address of the Bidders. :
4.00 Bidder’s proposal no. and Date:- :
5.00 Bid validity period (not less than four months). :
6.00 All schedules filled in - yes/no. :
7.00 All deviations brought out in the schedule of deviations. :
8.00 Is the Bidder agreeable to under take this contract if the :
deviations stipulated by him are not acceptable to the purchaser.
9.00 Whether earnest money furnished as specified and details. :
10.00 Current registration no. with DGTD if any. :
11.00 Place of manufacture (equipment-wise). :
12.00 Service facilities. :
13.00 Name of Bidder’s officer to whom reference may be made :
for expeditions co-ordination.
14.00 Is Bidder agreeable to pay in Cash or in the form of an :
acceptable bank Guarantee for security Deposit &
Performance Guarantee.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
15.00 Price Quoted are firm as required :
(Firm prices are only acceptable).
16.00 Warranty period from take over of plant/ :
17.00 Whether terms of payment is stipulated in bid document :
18.00 Guaranteed completion for
a) Design & Engineering. :
b) Supply of all equipment parts :
c) Erection work
d) Total completion period :
19.00 Are the completion periods as above guaranteed under :
20.00 Are the equipment guaranteed as per various :
guarantee clauses of bid documents ?
Name of the firm………………………………………..
Signature………………………………………
Designation……………………………………
Seal of Company.
DAKSHIN GUJARAT VIJ COMPANAY LTD .
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
IMPORTANT INSTRUCTIONS
1. The Tenderer should clearly give certificate along with the Technical Bid:
“This is to confirm and certify that the offer submitted by me is strictly in accordance with DGVCL Tender specifications, Guaranteed Tech
nical Particulars and drawing as mentioned in the Tender Specifications. There is no commercial or Technical deviation (except the deviati
ons shown in Annexure of Technical Deviations) in the offer from DGVCL Tender Specification. I undertake to
abide by DGVCL Technical specification / Guaranteed Technical Particulars / Drawing, I undertake to supply
materials strictly as per DGVCL Technical specification / Guaranteed Technical Particulars / Drawing, even if any
technical deviations are mentioned by me. I also undertake to abide by all commercial conditions of DGVCL, including delivery schedule.”
(Signature of the Tenderer)
2. Any offer without above certificate will not be considered and the tender will be out rightly ignored in the absence of above certificate.
3. After opening of the Tender, if it is found that the offer given by the Tenderer is not according to DGVCL specifications, Guaranteed
Technical Specifications, Drawing and commercial terms and conditions and false certificate is given by the Tenderer, then DGVCL will not
deal with the firm for the present Tender. It is, therefore requested that the Tenderer should take care in giving their offer and submission
of documents, including Type Test certificate.
4. The conditional tenders will not be accepted.
SCHEDULE FOR DEVIATIONS FROM TECHNICAL SPECIFICATIONS
(Clause No-22”To be furnished with Technical Bid”)
All deviations from the specification shall be filled in by the Bidder in the schedule.
sl. Reference Deviations Justifications
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
It is hereby certified that the above mentioned are the only deviations from technical specification of the inquiry.
Seal of Company. Name of the Firm
SCHEDULE FOR DEVIATIONS FROM GENERAL TERMS & CONDITIONS OF THE CONTRACT
(To be furnished with Technical Bid)
All deviations from the General Terms & conditions shall be filled in by the Bidder in this schedule.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Section Specification No. Clause No. Deviations
It is hereby certified that the above mentioned are the only deviations from General Terms & conditions of the contract.
Seal of Company. Name of the Firm
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Bidder’s experience
The bidder should furnish here a list of similar jobs executed by him to whom a reference may be made by the purchaser in
case of the purchaser considers such a reference necessary.
Sr. Name & Value of work Period of Client with Person to whom
Description of Construction and detailed reference to be
No. work date. address made.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Seal of Company. Name of the Firm
Guaranteed Technical Particulars a
For Heat Shrink Outdoor end termination on 11 KV (E) XLPE Cable
Sr.No Particulars Unit Guaranteed Values
1.0 APPLICABLESTANDARDS As per IS:13573
GUARANTEED PARTICULARS For the nominal
2.0 (phase to phase) System Voltages KV 11KV - 12KV
Maximum system voltage
A.C. withstand voltage (ph / ground) Time
2.1 KV Mins 35KV1Min.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
2.2 Partial Discharge at 2 Uo pC <5 pC
2.3 Impulse Withstand, 1.2 / 50 / Us kV 75KV
Load Cycle Test
a) Each Cycle Heating Duration
Temperature Cooling duration
b)Number of Cycles
c) Continuous phase to ground Voltage
Withstand 2.5Uo
2.5 ThermalWithstandShortcircuitcurrent1Sec. Ka As per IS:13573
2.6 Dynamic short circuit withstand Ka Peak 2.55 xls as per IS:13573
2.7 DC Voltage KV 48 KV for 30 Mins.
3.0 KITPARTICULARS
3.1 Material of the tubing/ moulded party Polyolefin
3.2 Method of stress control High permittivity Material.
3.3 Method of environmental seal H. S. Black Insulating Tubes
List of items included in the Kit
a) For Terminations Yes. Normal Ambient
3.4 Temperature. More than
b) Allowable Kit storage Temperature. years.
c) Kit self life
4.0 Cable Termination Instruction Manuals Yes/ No Yes
Guaranteed Technical Particulars Annexure b
Heat Shrink Straight through joint on 11 KV (E) XLPEC able
Particulars Unit Guaranteed Values
1.0 APPLICABLESTANDARDS AsperIS:13573
GUARANTEEDPARTICULARS
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
For the nominal (phase to phase)
System Voltage KV 11KV
Maximum system voltage KV 12KV
A.C. withstand voltage Dry (ph/ground) KV 35KV
Time duration Mins 1 Min.
2.2 Partial Discharge at 2 Uo pC <5pC
2.3 Impulse Withstand, 1.2/50/Us kV 75KV
Load Cycle Test
a) Each Cycle Heating Duration Hrs
2.4 Cooling Hrs.
b) Number of Cycles
c) Continuous phase to ground voltage
60 Nos. at 2.5Uo as per
Water tightness test KV
2.5 ThermalWithstandShortcircuitcurrent1Sec. ka As per IS;13573
2.6 Dynamic short circuit withstand 2.55 xls As per IS:135373
2.7 DC Voltage kV 48 kV for 30 Mins.
3.0 KITPARTICULARS
3.1 Material of the tubing/ moulded party Polyolefin
3.2 Method of stress control High permittivity Material.
3.3 Method of environmental seal H.S. Black Insulating Tubes.
List of items included in the Kit Yes/No
a) For joints Yes
3.4 b) Allowable Kit storage Temperature ºC Normal Ambient
c) Kit shelf life Years More than 5 years
Cable Termination Instruction Manuals
Guaranteed Technical Particulars Annexure c
Heat Shrink Indoor termination on 22 kV (E) XLPE Cable
Particulars Unit Guaranteed Values
1.0 APPLICABLESTANDARDS As per IS:13573
GUARANTEEDPARTICULARS
For the nominal (phase to phase)
System Voltage KV 22 KV
Maximum system voltage KV 24 KV
A.C. withstand voltage Dry (ph/ground)
Time duration Mins 1 Min.
2.2 Partial Discharge at 2 Uo pC <5pC
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
2.3 Impulse Withstand, 1.2 / 50 / Us kV 125KV
Load Cycle Test
a)Each Cycle Heating Duration Hrs
2.4 Cooling duration Hrs.
b) Number of Cycles
c) Continuous phase to ground voltage
Thermal Withstand Short circuit current
2.5 ka AsperIS:13573
2.6 Dynamic short circuit withstand 2.55xlsAsperIS:135373
2.7 DC Voltage kV 96kVfor30Mins.
3.0 KITPARTICULARS
Material of the tubing/ moulded party
3.2 Method of stress control High permittivity Material.
3.3 Method of environmental seal H.S. Anti tracking Tubes.
List of items included in the Kit
a) For Terminations Yes
3.4 b) Allowable Kit storage Temperature ºC
Normal Ambient Temperature
c) Kit shelf life Years Morethan5years
Cable Termination Instruction Manuals
Guaranteed Technical Particulars Annexure-d
Heat Shrink straight through joint on 22 kV (E) XLPE Cable
Particulars Unit Guaranteed Values
1.0 APPLICABLESTANDARDS As per IS:13573
GUARANTEEDPARTICULARS
For the nominal (phase to phase)
System Voltage KV 22KV
Maximum system voltage KV 24KV
A.C. withstand voltage Dry (ph/ground)
Time duration Mins 1 Min.
2.2 PartialDischargeat2Uo pC <5pC
2.3 ImpulseWithstand,1.2/50/Us kV 125KV
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Load Cycle Test
a) Each Cycle Heating Duration Hrs
Cooling duration Hrs.
b) Number of Cycles
c) Continuous phase to ground voltage
60 Nos. at 2.5 Uo as per above
Water tightness test KV
Thermal Withstand Short circuit current
2.5 ka AsperIS:13573
2.6 Dynamic short circuit withstand 2.55xlsAsperIS:135373
2.7 DC Voltage kV 96kVfor30Mins.
3.0 KITPARTICULARS
Material of the tubing/ moulded party
3.2 Method of stress control High permittivity Material.
3.3 Method of environmental seal H.S. Anti tracking Tubes.
List of items included in the Kit
a) For Joints Yes
3.4 b) Allowable Kit storage Temperature ºC
Normal Ambient Temperature
c) Kit shelf life Years Morethan5years
Cable Termination Instruction Manuals
Guar`anteed Technical Particulars Annexure -e
Heat Shrink outdoor termination on 22 kV (E) XLPE Cable
Particulars Unit Guaranteed Values
1.0 APPLICABLESTANDARDS As per IS:13573
GUARANTEEDPARTICULARS
For the nominal (phase to phase)
System Voltage KV 22KV
Maximum system voltage KV 24KV
A.C. withstand voltage Dry (ph/ground)
Time duration Mins 1 Min.
2.2 Partial Discharge at 2 Uo pC <5pC
2.3 ImpulseWithstand,1.2/50/Us kV 125KV
Load Cycle Test
a) Each Cycle Heating Duration Hrs
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
2.4 Cooling duration Hrs.
b) Number of Cycles
c) Continuous phase to ground voltage
Leak Tightness 9 Cycles
Thermal Withstand Short circuit current
2.5 ka AsperIS:13573
2.6 Dynamic short circuit withstand 2.55xlsAsperIS:135373
2.7 DC Voltage kV 96kVfor30Mins.
3.0 KITPARTICULARS
Material of the tubing/ moulded party
3.2 Method of stress control High permittivity Material.
3.3 Method of environmental seal H.S. Anti tracking Tubes.
List of items included in the Kit
a) For Terminations Yes
b) Allowable Kit storage Temperature Normal Ambient Temperature
c) Kit shelf life Years Morethan5years
Cable Termination Instruction Manuals
Sign. of Contractor
OTHER CONDITION OF SUPPLY :
1. The Company’s General Conditions of contract will apply to all contracts and supplier will be deemed to be fully aware of the
Company’s general conditions of contract for the supply of plant equipment and materials except the conditions modified in this
commercial terms and conditions and any ignorance of these Conditions, will not exempt supplier from their liability to abide by the same.
Copies are available from the Division Office
2. Although the materials have to be supplied as per ISO and or as per the tender specifications, the Company will take random samples
from the materials supplied and subject them to tests according to ISS in approved laboratories. The materials should stand these tests
and if the materials do not stand these tests, they will be summarily rejected and the supplier should make immediate arrangement to
replace them with standard materials and after getting them duly inspected and approved.
3. If in any company, the interest of any employee of the DGVCL or his relative as defined in Section VI of the Company’s Act. 1956, is
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
10% or more, DGVCL will not deal with such company at all. Tenderer therefore, must specifically disclose this fact in his technical Bid.
Non-disclosure of such facts would disqualify the Tenderer for further dealing with DGVCL.
4. JURISDICTION:
All questions, disputes or differences arising under out of or in connection with the Tender / Contract if concluded shall be subject to the
exclusive jurisdiction of the court under whose jurisdiction the place from which the tender / Acceptance of tender is issued, is situated
i.e. DGVCL,CORPORATE OFFICE; SURAT.Tenderers are submitting their offers with the conditions of advance payment along with the order;
such conditions are not acceptable by the Company.
5. The Tenderer if being an agent, who submits its offer to Company, will have to give information and declare the name of the principle
from which he will procure the materials and supply to Company along with company’s written confirmation about quality and backup
performance guarantee. Only on getting complete information from Agent, such offer if found suitable shall be taken in consideration.
6. Company reserves the right to cancel any or all the offers / bids or to accept any offer without assigning any reasons. Also in case
Company finds that there is an attempt of cartel in the prices, Company reserves the right to consider or reject any or all the parties offers
without assigning any reasons thereof.
7. Company reserves the right to increase or decrease the quantity against each item/s while placing the order.
8. All the suppliers / manufacturers should possess high quality ISO 9001 / ISO 9002 Certificate within 2 years. Other things being equal
the company possessing the ISO 9001 / ISO 9002 license will be given preference if other requirements match.
9. The tenderers are required to furnish the technical information and the guaranteed technical particulars (GTP) along with company seal
and signature of the Tenderer on each and every page / papers of the tender documents.
10. All the costs of the stamp papers are to be borne by you as per the Govt. Of India’s latest guidelines.
11. Tenderer should invariably fill up all the details of all the Annexure including the prices in the Price Bid Annexure of this tender
document. This is mandatory. Also all the Annexure should be duly signed by authorized signatories with their rubber stamp and along
with Company’s Rubber (Round) seal / stamp affixed on each paper.
12. If the Tenderer fails to pay the Security Deposit or defaults in execution of the order placed or if Company suffers any financial loss
due to this, then Company will be at liberty to adjust the amount from other orders of the same firm or by encasing the Bank Guarantee.
13. LABOUR LAWS:-
Persons below the age of 18 years shall not be employed for the work. No female workers shall be employed in the night shift between
07.00 P.M. and 6.00 .A.M. next day. Contractor shall maintain a valid labour license under the Contract Labor (Regulation and abolition )
Act for employing necessary manpower required by him. In the absence of such a licensee, the contract shall be liable to be terminated
without assigning any reason thereof. Contractor should also employ qualified and experiences persons as per requirement of Electricity
Act and rules for carrying out supply and erection work under this contract.
The Contractor shall at his own expenses comply with all labour laws and keep the DGVCL indemnified in respect thereof. Some of the
major liabilities under various labour and industrial laws which the Contractor shall comply which are as under:
Payment of contribution by way of Employer’s Contribution towards Provident Fund. Family Pension Scheme Deposit Linked Insurance
Scheme, Administrative charges etc. at the rates made applicable from time to time by the Government of Gujarat / Government of India
or others Statuary / Authority.
Payment of Deposit in respect of each contract labour with the Office of Commissioner of Labour as per the Contract Lab our (Regulation
and Abolition) Act.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
License fee as prescribed under the Contract Labour (Regulation and Abolition) Act and Rules framed there under depending upon the
number of workmen.
Paid leave facility and wages as per the provision of the Factories Act., at the rate of one day for every 20 days of working. Identify Cards
as prescribed under the Factories Act., with photo affixed thereto for identification.
Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial Dispute Act., Any payment to the Contractor’s
employee arising out of any claim of dispute under the Industrial Disputes Act,1947 or any other Labor Laws.
Payment of compensation in case of accidental injury. Provision of crèche if the female laborers employees are more then 30. Maternity
leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed under the various labor laws, in force
from time to time, from Statutory Authorities like State Government / Government of India, which the Contractor shall have to comply
14. PROVIDENT FUND AND FAMILIY PENSION SCHEME :
The Contractor shall submit along with his bills (Month wise) a Statement regarding deduction against employees Provident Fund and
Family Pension Scheme in respect of each concerned employees. The contractor’s contribution and the workers’ contribution towards
Provident Fund and Family Pension Scheme shall be done at the rate made applicable by the Government from time to time and deposited
by the contractor with Regional Provident Fund Commissioner SURAT.
15. DEPOSIT LINKED INSURANCE SCHEME:-
The contractor shall have to deposit 1.2% of the wages in respect of employees who are members of the Provident Fund as the
contribution to the Deposit Linked Insurance Scheme with Regional Provident Fund Commissioner, SURAT.
16. ADMINISTRATIVE CHARGES:-
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contactor with Regional Provident Fund
Commissioner, SURAT at the rates applicable.
17. PAID LEAVE FACILITY:-
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labour shall be provided by the Contractor to his
workers. He shall maintain Leave Records, Leave cards for individual labourer which shall be duly verified approved and certified by the
authorized Officer of the DGVCL.
18. WORKMEN’S COMPENSATION ACT AND EMPLOYER’S LIABILITY INSURANCE:
The Contractor shall cover all his employees under workmen’s compensation act and under its liability insurance. The DGVCL shall not be
responsible for any payments of compensation to the workers / supervisor of the contractor for fatal or non fatal accidents during the
tendency of the contract.
The contractor shall employee adequate number of qualified and experienced staff at site for daily supervision and for maintenance of
various registers and records rejected under the law and contract. No payment for supervision shall be admissible. The list of names of
such persons with their qualification and experience should be furnished with the tender.
19. CONTRACTOR TO INDEMIFY THE DGVCL:-
The Contractor shall indemnify the DGVCL and every officer and employees of the DGVCL including, Engineer – In-charge and his staff
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
against all actions, proceedings, claims, demands, cost and expenses whatever, arising out of or in connection with the matter referred
herein above and elsewhere and against all actions, proceedings, claims demands, cost and expenses which may be made against the
DGVCL or Government for or in respect of performance of the obligation under the contract documents. The DGVCL shall not be liable for
or in respect of or in consequence of any accident or injury to any workman or other person in the employment of the contractor or his
sub-contractor and the contractor shall indemnify and keep indemnified the DGVCL against all claims, demands, proceedings, cost,
charges and expenses whatever in respect thereof or in relation thereto.
20. WORKMEN’S COMENSATION AND EMPLOYEES LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employees engaged in the performance of this contract. If any of the work of subject
matter, the Contractor shall require the Sub-Contractor to provide workmen’s employers’ liability insurance for the latter’s employees and
ensure that such employees are covered under the Contractor’s Insurance.
21. WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR:-
The Contractor shall pay minimum wages per day to his Labours / Workers as per rates fixed under the minimum wages Act. The wages of
every Contract Labour employed by him under this contract shall also be paid by him before the expiry of 7th day from the last day of the
month in respect of which the wages are payable
(i.e. wages of a month have to be paid by him in the first week of the next month).
Any default will result in cancellation of contract work with or else the Contractor shall be punishable to the extent of Rs. 100/- for each
day of default.
The Contractor shall give his Addresses, Telephone Number and etc. to the DGVCL, so that, in case of labour trouble etc. the Contractor
can be contacted. The Contractor shall arrange to have his office within working area and the contractor keep himself present throughout
the working hours.
The contractor who are having separate P.F. Code No. from RPFC, it should be ensured that all the contract labourers are covered under
the Provident Fund
scheme, and employees’ pension scheme and their contributions are remitted regularly to the concerned Xerox copies of the challans in
this regard be collected from the concerned contractor and kept in the file of the concern contractor.
22. INCOME –TAX:-
Income-tax at source at the prevailing rate will be deducted from your bill in accordance with the provision of Income-Tax Law sand to
that effect a certificate will be issued to the contractor.
As the material is to be procured by the successful bidder, the contractor shall make its own arrangement to avoid breakage, losses and
wastages of material etc. And no wastage on this account shall be considered payable by the DGVCL.
DGVCL reserve the right to check all the activities carried out by the successful bidder at each stage or during execution to see that the
work is executed as per the various drawings, standards, norms, rules and the regulations of the DGVCL.
24. PRESENTATION OF BILLS:-
The bills for the work executed including cost of material consumed is to be prepared in Quadruplicate and submitted 03 copies to the E.E.
(O&M) Pandesara Division in Charge of the work who will in turn process the same and for necessary payment. These bills shall be
serially numbered.
The contractor may note that no payment shall be released for the additional quality supplied which is not required for completion of line.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
The Contractor has to submit the final bill along with the material consumption statement along with other required data’s of the work
carried within 3 months from the date of completion of work.
For non-submission of part submission of above information, no bills shall be processed.
25. WAY LEAVE /ACCESS TO LOCATION / RIGHT OF WAY:-
DGVCL will arrange to get the permission from various government agencies for carrying out the underground cable laying work i.e.
SMC/B&C/ Forest etc.The successful bidder shall have to cut tree branches/tree at his cost. It will be the contractor’s sole responsibility to
take the materials up to the location. Any path way, temporary road, temporary bridge required will have to be provided by the contractor
at his cost. If for any reasons, the above is not feasible, the contractor at his own cost shall have to arrange transportation by head loads.
The contractor will be deemed to be very well familiar with the route of the Distribution line before giving the offer. Not withstanding the
difficulties of terrain location approaches way leave and other obstructions the price quoted for all the items of erection I the Schedule of
Section shall not undergo or any change at any stage or granted by DGVCL for any special rates / consideration.
26. The enclosed List of Annexure and Documents should be invariably submitted along with the tender:
1) Technical Bid should be submitted online with all Annexure and all relevant papers as asked in tender.
2) Schedule–“B” Price Bid to be submitted in the Online
3) Technical Specifications with Guaranteed Technical Particulars.
All the above documents should be duly filled in, signed & stamped with company’s seal should be submitted along with the Technical Bids
and Schedule–“B” to be kept in the Online.
27. Please note that any additional conditions / deviations, if any, found in the Commercial terms & conditions then the Price Bids of such
tenderers will not be opened and no further correspondences in the matter will be allowed.
28. All the tenderers must ensure that all the relevant documents / papers submitted Online
29. All the above points should be complied by the Tenderers. If not, tenders are likely to be ignored without making any further
Signature of Contractor
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
F. COMMERCIAL TERMS & CONDITION FOR :- Emergency work of locate 22kv / 11kv UG cable fault locating & attending
the fault by providing joining kit etc. [suitable Straight through joining kit & Outdoor end termination kit to be supplied by
contractor and 22kv / 11kv XLPE cable will be supplied by DGVCL] under All Sub divisions area under Pandesara Division.
1. TENDER SPECIFICATIONS :
All technical specification should be ISS/ISI/BIS. Specification framed out by the Company is separately brought out in the tender
documents. No deviation in specification shall be allowed and Company’s decision shall be final. The Company also desires that all the
suppliers should possess high quality ISO 9001 / ISO 9002 certificate within 2 years from 1/1/2001 and other things being equal, suppliers
who possess ISO 9001 / ISO 9002 certificate will be given preference in quantity distribution. The technical scrutiny committee of the
Company shall evaluate the techno-commercial view of the tender. Tender should be in two bids.
a) Techno – Commercial Bid and b) Price Bid.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Incomplete bids and amendments and additions to bids after opening of the bids will be ignored out rightly.
The price bid of those who are techno-commercially qualified shall be opened. After technical bid is opened, for modification, if any, all
shall be given equal chance.
2. The Tenderer must give in his offer Online with Representative who has been authorized by the Tenderer to do work with the
Corporation on their behalf.
3. The tenderers should invariably write the name and address of the Company, both on Online of EMD, Technical & Price Bids.
THE TENDER SHOULD BE Online
For Other Inquiry: The EXECUTIVE ENGINEER (O&M), DGVCL, PANDESARA DIVISION, PANDESARA, Surat.
(NO COURIER SERVICE WILL BE ACCEPTED).
4 DELAYED AND LATE TENDER Fee and EMD:
TENDER Fee and EMD SHALL BE ACCEPTED / OPENED IN ANY CASE WHICH ARE RECEIVED AFTER DUE DATE AND TIME OF THE RECEIPT OF
TENDER Fee and EMD Online
5. Tender fee (Non-refundable) as notified in the tender notice should invariably be paid by the tenderers in CASH (at DGVCL, Corporate
Office; SURAT) and enclose the zerox Money receipt in the EMD Online.
6. PRICE EVALUATION:
No price preference shall be given on any account. All tenders will be evaluated on firm price basis. Company may go for the price L-2
depending upon the exigency. If Company feels that there is lack of serious competition or any other reasons, Company may negotiates
with the L-1 party. Company’s decision shall be final and binding to all the parties.
7. QUANTITIES:-
The quantities mentioned in the schedule attached herewith are tentative and to be procured / executed by the successful contractor at
the same rates accepted by the DGVCL in various A/T and all the terms and conditions of the order. However payment shall be made only
for the actual quantities utilized / executed to complete the work
8. PACKING AND FORWARDING CHARGES :The prices shall be inclusive of packing & forwarding charges. The stores should be strongly
and adequately packed to ensure safe arrival at destination.
9. COMPLETION PERIOD:-
The Tenderer should agree activity wise time bound programme for completion of supply and erection work in all respect as per terms
and conditions of tender specifications. The Tenderer shall confirm that on placement of order, the work will be commenced, executed and
competed as per schedule given by DGVCL Pandesara Divison / sub division only.
10. POST TENDER CORRESPONDENCE / ENQUIRIES:
Any correspondence or enquiry subsequent to opening of Technical and Commercial bids is not desirable, if the same is indulged into,
it will be considered for disqualifying the tender. The Tenderer will be required to abstain from pursuing / canvassing the matter, directly
or indirectly with any Officers of the Company, otherwise the same would also amount to disqualification of the tender.
11. Tenderer must submit offers / bids along with requisite descriptive literature etc. in Duplicate (separate sets) clearly indicating as
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Original and Duplicate duly signed and stamped by them. Wherever applicable, Complete Technical data of 11/22 KV XLPE underground
Cable Termination kit must be furnished along with the tender including (i) Dimensional Drawings, (ii) Type Test Certificate from Govt.
Recognized Laboratory (iii) Guaranteed Particulars with the tender which is a must. Tenderer will be at full liberty to provide information
and data’s about his products.
12. TYPE TESTS:
All the necessary Type tests will have to be carried out before submission of the tender and to be submitted along with the Technical Bid.
The Type Tests which are more than 05 (Five) years old (from the date of opening of the technical bid) will not be considered (except
otherwise specifically mentioned in the Guaranteed Technical Particulars (i.e.GTP’s.) and such tenders will be rejected. All the required
type tests should not be older than 5 (five) years. All the required type tests on one particular item must have been conducted in the span
of one year only. If the type tests for the tendered items are not carried out before the submission of the tender, then it will at Company’s
sole discretion to accept them or NOT. However, depending upon Company’s requirement, if the Letter of Intent (LOI) is placed subject to
submission of type tests, then in such cases all the necessary Type tests will have to be carried out by the firm within 30 (Thirty) days of
the issue of LOI or at Company’s discretion, failure to do so the LOI stands cancelled and the detailed purchase/Work order will not be
placed and no further correspondences in this matter will be entertained at any cost and will be out rightly ignored.
13. The purchaser (i.e. Company) shall have the right to make any changes, additions / deletions or modifications in any terms /
conditions of the tender and / or specifications as may be deemed necessary by the Corporation at its sole discretion at any time before
the due date of opening of the tender.
14. Tenderer should furnish a list of orders for similar works executed by them indicating the name of the party and their order reference
to which they have worked to be furnished. Failure to do this will result on suppliers tender being rejected without any reference. In case
of bought out items, they should furnish the back up guarantee from their principals.
15. Company does not accept the printed conditions of any Tenderer. It will be ignored without any reference; hence tenderers should
withdraw such printed conditions if they have any.
16. The materials should be offered strictly confirming to ISS / BIS / Tender specifications given in the tender. If the tenderer desires to
quote with any technical deviations, they should specifically quote the deviation & the ISS or BIS Nos. in the body of the tender itself under
the respective Annexure of this tender document. If technical deviations furnished by the Tenderer are not agreeable to the Company, the
offers may be ignored. However it will be solely at Company’s discretion to consider the technical deviations OR not for considering the
Correspondence with the Tenderer after opening of the bid will be entertained in this matter.
17. Revision of prices or any commercial terms affecting the price after opening of technical bids shall not be considered and will be
18. Please give suitable declarations as under: I / We declare that we are Authorized Distributor OR Dealer for all the tendered items.
19. Tenderer should specifically mention in the offers and should indicate in Block letters the name of the Partners / Proprietor / Directors
who is / are the signing authority.
If the goods, stores and equipments found defective due to bad design or workmanship, the same should be replaced by you free of
charge if reported within 24 months of their installation at site. You will be responsible for the proper performance of the equipments /
materials for the respective guarantee period.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
SAFETY RULES APPLICABLE TO WORK CONTRACTS
1. The contractor shall invariably obtain LINE CLEAR PERMIT through concern in-charge Engineer through supervising department’s
engineer and shall observe all rules and Regulations. The contractor shall provide to his labourer all the equipments / accessories
necessary for safe execution of work.
2. Only trained and experienced persons should be employed for working. Particularly in places where the working environment is
hazardous, it is a must.
3. The contractor shall employ such Supervisor(s) who have good understanding and experience of the job entrusted to him. The
supervisor must be familiar with the associated risks and he will remain present to guide the workers regarding safe execution of work.
4. Contractor shall use 24 volts lamps for lighting purpose, which are having grill around it (insulated handle in case of hand lamp)
wherever required.
5.Safe working environment to workers will be provided and maintained by Contractor e.g. In confined spaces provision of fresh air during
welding / cutting operations, In coal Handling Area, Contractor must provide respirator and Breathing equipments to their workers.
Wherever require, Helmet, Safety shoes, Goggles etc must also be provided. In chlorination plant, breathing equipment must be provided.
6. Tools and Tackles used by the contractor should be in safe working conditions. The test certificate issued by competent person should
be kept on hand shall be produced wherever required by DGVCL authorities or any other authorities such as Factory Inspector, Electrical
7.No person shall be ordered to carry or lift independently heavy weight more than the limit as shown below.
MALE: 55 Kg. (maximum)
FEMALE: 30 Kg. (Maximum)
8.All Electrical equipments on which repair work is to be carried out must be fully isolated and earthen prior to execution of job. Use
insulated gloves of adequate safe voltage rating. Use safety belt and lifeline in case where work is at elevated place. Use of appropriate
helmet is must while working. Use double insulated tools of appropriate voltage rating. All above equipments must be checked
periodically for its ratings. Use only proper connectors and socket. Loose wires and connections are strictly prohibited. All portable
electrical tools should be suitably earthen. All amendments coming in force in Factories Act, State Factory Rules must be strictly followed
from the date of enforcement.
Signature of Contractor
SPECIAL TERMS AND CONDITIONS:
1.The work is to be executed in the area of DGVCL in all respect as per the instructions of Engineer-in-charge by arranging all required
materials tools, tackles equipment including labours, transportation etc. DGVCL will not pay anything extra on this account.
2.The DGVCL reserves the rights of retrenching and dismissing any person employed for the work if there is complaint against his
misbehavior, misconduct or disloyalty towards job.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
3.Terms and conditions regarding industrial laws and other related matters shall be complied by the contractor in all respect.
4.No part of the contract nor any share of interest there in shall in any manner of degree be transferred/assigned or subject by the
contractor directly or indirectly to any person/firm or Corporation whatsoever.
5.The contractor shall ensure that all persons are provided with the safety tools, shoes, etc. as may be required from safety point of view
and all his persons shall follow the instructions issued by the D.G.V.C.L from time to time related with the safety and security to carry out
6.DGVCL shall not be liable for any damages or compensation for any injury or for any accident occurred to any person engaged by the
contractor. The contractor shall keep the DGVCL indemnified thereof.
7.The contractor shall be liable for making good all damages/losses arising out of workmanship, breakages, pilferage, etc. to the DGVCL.
8.Contract period: The contract period will be 24 Months from the date of issue of the Order. However if required, the period of order may
be extended for further 12 months approval by next authority of order authority.If during the contract period, execution of work is not
found satisfactory in any respect, job will be got executed through other agency at the risk and cost of the contractor. DGVCL reserves
the right to terminate your order without assigning any reason.
9. The rates agreed herein shall remain firm till the expiry of contract. The contractor shall not be entitled to any increase or
revision (Statutory or otherwise) or any other right or claim. What so ever by way of representation, explanation statement or any
undertaking or promise given or alleged to have given by any employee of the company or due to contractor’s own ignorance on account
of any difficulties or hardships faced by him. The rates as such are all inclusive of all.
10. The rates should be quoted in percentage in enclosed schedule only, both in words and in figures, as specified therein. In case of any
discrepancy between the rates/amount quoted in words & figure, the rates/amount most favorable to the DGVCL shall be considered.
11. Conditional tender will not be accepted and likely to be rejected.
12 .The DGVCL do not bind them selves to accept lowest or any tender.
13. The DGVCL reserves all rights to accept or reject any or all tenders without assigning any reason. The terms and conditions stated
above are carefully read by me/us and are acceptable to me/us.
14.The quantity given in Schedule ‘B’ is approximate. There will be increase or decrease in the quantities. Please note that within the
estimated cost quantities of item may very as per the requirement of the Board. In such event, payment will be made on the basis of
actual quantities executed. For making any change in the quantities, the E.E (O&M), DGVCL, SURAT is only authorized. Successful bidder
shall submit monthly report for work executed by them giving details of Name of s/s, Name of feeder, type of kit used ,date of providing
kit, sub order no. etc. utilized by them to the E.E (O&M), DGVCL, SURAT.
15. “The Contractor has to pay 1% Labour welfare Cess of order value to the concern Government Department. The rates Shall be
inclusive of the same.”
The proof of 1% Workers Welfare Cess payment made by the contractor to the appropriate department shall be submitted to DGVCL along
with bill, falling which appropriate amount shall be deducted from the bill and deposited to the respective government department by
Signature of Contractor
Ref: - Tender Notice No:
In connection with the above subject and reference I/ We confirm the
1. I / We, the undersigned have read and examined the Tender Specifications in tender mentioned under reference along with the
Commercial terms and conditions.
I / We, declare that our Technical Bid is strictly in line with the Tender specifications (except the deviations shown in Annexure of
Technical Deviations as per clause no.22 of this tender document).
3. Further, I / We also agree that additional conditions / deviations, if any, found in the Commercial terms & conditions (except
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
reference under clause no.22 of this tender document), our offer shall be out rightly rejected without assigning any reason thereof.
Signature of Contractor Executive Engineer (O & M)
DGVCL Pandesara Division.
Work :- work of locate 22kv / 11kv UG cable fault locating & attending the fault by providing joining kit etc.
[suitable Straight through joining kit & Outdoor end termination kit to be supplied by contractor and 22kv
/ 11kv XLPE cable will be supplied by DGVCL] under All Sub divisions area under Pandesara Division.
Description of Work. Qty. Unit Rate
Labour charge for excavation of
2100mm long x 1200mm wide x
mm deep joint pits for installation of
11kV / 22kV Straight through joints as
1. per instruction of engineer-in-charge & No
covering the cable with 150 mm dia
(Outer), thickness 25 mm, 1.0 meter
long RCC half round muffs & refilling
same as per instruction of EIC .
Supply & fixing of heat shrinkable
straight through joint type for upto
22kV 3C x 185 mm2 size XLPE cable as
2. per DGVCL technical No
specification(Using Approved make
cable kit as per DGVCL technical
Supply & fixing of heat shrinkable
straight through joint for upto 11kV 3C
x 185 mm2 size XLPE cableas per
DGVCL technical specification. (Using
Approved make cable kit as per DGVCL
technical specification)
Supply & fixing of heat & shrinkable
4 end terminations (Indoor/outdoor) for
upto 22 kV 3C x 185 mm2 size XLPE No
cable as per DGVCL technical
specification(Using Approved make
cable kit as per DGVCL technical
Supply & fixing of heat shrink type end
terminations (Indoor/outdoor) for upto
11kV 3C x 185 mm2 size XLPE cable as No
per DGVCL technical
specification(Using Approved make
cable kit as per DGVCL technical
5 specification)
Work of fault finding 11/22 cable under Nos
ground XLPE cable fault locating exact
6 place of fault.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
Consecutive more than one Fault Nos
Finding on same cable till the cable
7 charged fully.
8 Labour charge for excavation of cable Meter
trench of 400mm width x 1200mm
depth, in any type of soil for laying of
cable of size up to 240 mm2 (For
additional cable 200 mm additional
width shall be considered i.e. half
trench length is to be considered)
9 Labour charge for laying of 11kV / 22 Meter
kV XLPE Cable of size up to 240 mm2 &
preparation of sand layer 100mm thick,
in the cable trench & covering the cable
with 150 mm dia (Inner), thickness
mm, 1.0 meter long RCC half round
muffs and providing and fixing of
4inch width yellow colour polyethylene
tape with printing "CAUTION ELECTRIC
CABLE BELOW" at 0.75 m depth from
ground surface after laying cable in
trench. This will provide indication that
electric cable is passing underground
so as to protect cable from mechnical
injuries, refilling the same, as per
Instruction of Engineer in Charge (EIC).
10 Labour work for RCC concreting on CMT
disputed location and repairing of
damage portion of road crossing for the
work carried out for roads crossing as
well as concreting & muffing of ploes
including all materials (1:2:4)
11 Providing & fixing concrete stone route NO
marker of 300 mm width x 150 mm
thick x 650 mm height embedded in
earth at least 300 mm below &
mm above ground level respectively at
distance approx 50 meters along the
length of cable. The RCC concreting
(1:2:4)(all necessary maeterials will be
in bidder's scope) of route marker is to
be carried out 300 mm width x 150 mm
thick x 300 mm below ground level as
per instruction of EIC. The route
marker should be with name of
company with approved yellow colour-
DGVCL. The distance from marker to
cable and cable depth with feeder
name etc., marked with arrow sign is to
be painted on it.The route marker is to
be fixed at location near to any fixed
permanent location (not necessary to
fix exact on top of cable) as per
instruction of EIC.
12 Providing and fixing of pipe type No
earthing from 80 mm dia class-B GI
pipe with pit to be filled with salt &
coke and construction of chamber as
per DGVCL Drg. No. dg /100 for DP and
cable. The earthing pit should be
joined with cable by G.I. strip of size 1”
width & 2 mm thick. All material GI
pipe, Coke, Salt etc will be supplied by
13 Labour charge for erecting of 11kV /
kV XLPE cable of size up to 240 mm2
on DP Structure with fixing of 02 Nos
polymer cleats on top and middle Per Job
part. Polymer cleats, nut bolts etc.
fixing material to be provided by
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
14 Providing & fixing of 6.11kg/cm2
class-4,Green color, 110mm O.D.
8.5mm thickness H.D.P.E. pipe confirms
to IS 4984 and BIS certification on the
erected DP structure for the
mechanical protection of cable by
inserting the cable inside HDPE pipe.
The HDPE pipe shall be erected in such
a way that 300mm shall be below the
ground level and the rest 2700 mm
shall be supported on the DP
Structure with 01 No Polymer cleat.All
materials including polymer cleat and
Nut bolt to be provided by contractor.
15 Testing of cable at various points and
commissioning the feeder as per
instruction of engineer-in-charge.Test No
result shall be submitted by contractor
16 Supply & fixing of heat shrink type end
terminations (outdoor) for 11kV 3C x
240 mm2 size XLPE cable as per
DGVCL technical specification(Using
Approved make cable kit as per DGVCL
technical specification)
17 Supply & fixing of heat & shrinkable
end terminations (outdoor) for 22 kV
3C x 240 mm2 size XLPE cable as per
DGVCL technical specification) (Using
Approved make cable kit as per DGVCL
technical specification)
18 Supply & fixing of heat shrink type end
terminations (indoor) for 11kV 3C x
240 mm2 size XLPE cable as per
DGVCL technical specification) (Using
Approved make cable kit as per DGVCL
technical specification)
19 Supply & fixing of heat shrinkable
straight through joint for 11kV 3C x
mm2 size XLPE cableas per DGVCL
technical specification. (Using
Approved make cable kit as per DGVCL
technical specification)
20 Supply & fixing of heat shrinkable
straight through joint type for 22kV 3C
x 240 mm2 size XLPE cable as per
DGVCL technical specification(Using
Approved make cable kit as per DGVCL
technical specification)
RS THIRTY ONLY. Total
ABOVE/BELOW___%
In Words:-. RS THIRTY ONLY
Note: (1) Above rates are inclusive of all taxes, levies, duties & PF etc. Exclusive of GST
(2) 22KV XLPE cable will be supplied by DGVCL.
(3) Agency have to supply and provide end termination and St.Jointing kit of 11/22KV rating of
Raychem/ 3M/ dension/tyco brand for the work as per G.T.P. attached with tender.
(4) Pit for straight joint have to Excavate for 2100mm wide & 1200 mm depth & if more size pit excavate
Proportionate rate should be given & agency is fully responsible for excavate pit either by JCB or manually.
(5) In emergency, when Dept. fault finding VAN not available, than only item at Sr. No 6 & 7 In Sch-B may be applicable and justification
must be attached.
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Letter No: DGVCLSDPND/0061/11/2026 Approved Date: 07-11-2026 15:28
SIGN OF CONTRACTOR
Executive Engineer (O & M)
DGVCL, Pandesara Division
File No: DGVCLSDPND/OTH/e-file/4516/2026/2457/Billing
Approved By: Executive Engineer,Technical,DGVCLDPNDS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .