| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 PARTY. |
| 2 | L2₹1.2 Cr+₹11.0 L (10.0%)Rejected-AOC | ₹1.2 Cr+₹11.0 L (10.0%) | L2 | Rejected-AOC L2 Party. |
| 3 | L3₹1.3 Cr+₹16.7 L (15.2%)Rejected-AOC | ₹1.3 Cr+₹16.7 L (15.2%) | L3 | Rejected-AOC L3 Party. |
Tender Value
₹1.1 Cr
EMD Value
₹50,000
Closing Date
25 Oct 2024, 5:00 pmClosed
HOUT
KMML CHAVARA
Construction of garland drain around iron oxide pond as per bill of quantity tender drawings
2024_KMML_694795_1
KMML/TP/PROJ/C/T/02/2024-25 Dated 07/10/2024
Open Tender
Civil Works - Others
Item Rate
120 days
KMML CHAVARA
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,900
₹50,000
19 Dec 2024
8 Oct 2024
26 Oct 2024
8 Oct 2024
25 Oct 2024
9 Oct 2024
9 Oct 2024 - 23 Oct 2024
Amount
Garland drain around elevated IOP
2.33.1 : Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
od144730/2024_2025 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal & disposal of rubbish,scrap,pipes etc up to a distance of 50 m outside the periphery of the area cleared.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od144731/2024_2025 : Disposal of building rubbish/ malba/ similar unserviceable, surplus earth, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved dumping ground or as directed by Engineer-in-charge, beyond 50 m initial lead and up to 1000m , for all leads including all lifts involved
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
15.3 : Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.7.4 : Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
2.16.2 : Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete (Measurements to be taken of the face area timbered).Depth exceeding 1.5 m but not exceeding 3 m
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
16.73 : Dry stone pitching 22.5 cm thick laid in courses and required profile with hammer dressed stones having no side less than 15 cm, with minimum depth of 20 cm including preparing the bedding surface etc. all complete ( Payment for stone to be made separately)
od144732/2024_2025 : Supplying and stacking of hard stone ( for stone soling ) 22.5 cm thick at stie.
od144733/2024_2025 : Bailing out water/slush using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete.All deposits/slush shall be shifted to designated location with in 1km lead.
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
2.25 : Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
od144734/2024_2025 : Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix(mix design shall be contractor's scope), including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge.All work upto plinth level
5.7 : Reinforced cement concrete work in well - steining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand (Zone - III) : 3 graded stone aggregate 20 mm nominal size)
od144735/2024_2025 : Providing and applying protective primer coating of BARGUARD TMT of Redwop or similar over steel reinforcement as per direction of Engineer-in-charge. The product shall be applied on reinforcement steel after thoroughly cleaning. painted area of steel shall be considered for payment.
od144736/2024_2025 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level(The required reinforcement steel shall be supplied by KMML at our stores)<br>Thermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.9.12 : Centering and shuttering including strutting, etc. and removal of form for:Well steining
26.32.1 : Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).12 mm average thickness.
13.65.1 : Painting with black anti- corrosive bitumastic paint of approved brand and manufacture to give an even shade:Two or more coats on new work
od144737/2024_2025 : Labour charges for engaging skilled labour for plumbing works other than works that described in the schedule as per direction of engineer in charge.
Santhi constructions
KURIAN KOSHY
Bidder Name
Santhi constructions
Anup Kareem
KURIAN KOSHY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .