Loading…
Loading…
Tender Value
₹4.4 L
EMD Value
₹8,720
Closing Date
8 Sept 2026, 6:00 pm
EXEN REW BARAMULLA
EXEN REW BARAMULLA
Filling of graveyard at bagna ward 7 under ADP(DDC) grants for year 2026-27,P/H Bagna noorkhah Block Bijhama
2026_RDPR_322277_11
207/Xen/Rew/Bla/2026-27 Dated 25/08/2026
Open Tender
Civil Works
Percentage
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹8,720
25 Aug 2026
25 Aug 2026
9 Sept 2026
25 Aug 2026
8 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited
layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 0.2 | cum | - | - |
| 2 | Earth for an average lead of 5 Km and h/l by 50 mts (65)% qty | - | cum | 1 | - |
| 3 | Add for singn board and photographs | - | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1079886.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].