| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC KOOTTUPURAKKAL | L1 | Accepted-AOC accepted | |
| 2 | L2₹10.7 L+₹828.59 (0.08%)Rejected-AOC KOOTAPPURAKKAL HO POTTA KUMBALACODE PO PAZHAYANNUR 680587 THRISSUR | PAZHAYANNUR | THRISSUR | KERALA | 680587 | L2 | Rejected-AOC rejected | |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
Tender Value
₹10.7 L
EMD Value
₹26,700
Closing Date
11 Jul 2019, 6:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Minor Irrigation Sub Division, Wadakkanchery
SDRF - 2018-2019 - Desilting of Choolipadam check dam in Pazhayannur Grama Panchayath
2019_Irrig_283231_1
AEE/MIWKY/ET/08/2019-20 dt.25.06.2019
Open Tender
Civil Works - Others
Item Rate
120 days
Choolipadam
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,600
online
₹26,700
12 Oct 2022
25 Jun 2019
16 Jul 2019
25 Jun 2019
11 Jul 2019
25 Jun 2019
Amount
Scheme 1-Desilting of thodu and formation of bund -U/S near ch.38m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 2-Desilting of thodu and formation of bund -U/S near ch.114m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 3-Desilting of thodu and formation of bund -U/S near ch.190m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 4-Desilting of thodu and formation of bund -U/S near ch.266m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 5-Desilting of thodu and formation of bund -U/S near ch.342m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 6-Desilting of thodu and formation of bund -U/S near ch.418m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 7-Desilting of thodu and formation of bund -U/S near ch.494m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 8-Desilting of thodu and formation of bund -U/S near ch.570m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 9-Desilting of thodu and formation of bund -U/S near ch.646m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 10-Desilting of thodu and formation of bund -U/S near ch.722m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 11-Desilting of thodu and formation of bund -U/S near ch.798m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 12-Desilting of thodu and formation of bund -U/S near ch.874 m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 13-Desilting of thodu and formation of bund -U/S near ch.950m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 14-Desilting of thodu and formation of bund -U/S near ch.1026m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 15-Desilting of thodu and formation of bund -D/S near ch.38m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 16-Desilting of thodu and formation of bund -D/S near ch.114 m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 17-Desilting of thodu and formation of bund -D/S near ch.190m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 18-Desilting of thodu and formation of bund -D/S near ch.266m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Scheme 19-Desilting of thodu and formation of bund -D/S near ch.320m.
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od40070/2018_2019/IA : Formation of embankment using available excavated earth in required level and width as directed by the Engineer in charge.
Maintenance of Shutters
60.8 : Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
60.4 : Locking Arrangements - Supplying and Fixing lock and locking arrangements with suitable chain hooks,and padlock of 65mm size.
13.59 : Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
K.M.ABBAS
Bidder Name
MUHAMMEDBASHEER.KA
K.M.ABBAS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_385456.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .