EXECUTIVE ENGINEER
EXECUTIVE ENGINEER, MI DIVISION, RAMGARH
Construction Of RCC Drain With Slab From House Of Sunil Malakar To House Of Surendra Jha In Ward No. 2, Block- Ramgarh, Dist- Ramgarh.
2026_WRD_117965_1
WRD/MID/RAMGARH F2-10/2026-27 (3rd Call)
Open Tender
Civil Works
Percentage
60 days
RAMGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹49,970
27 Aug 2026
27 Aug 2026
5 Sept 2026
27 Aug 2026
3 Sept 2026
27 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I.(BCD 5.10.1) | 81.6 | M3 | 541.67 | ₹44,200.27 |
| - | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I.(BCD 5.1.1+5.1.2) | 73.44 | M3 | 167.33 | ₹12,288.72 |
| - | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume).(BCD 5.1.10) | 19.11 | M3 | 589.51 | ₹11,265.54 |
| - | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size).(BCD 5.3.1.2) | 25.47 | M3 | 4,598.23 | ₹1,17,116.92 |
| - | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size).(BCD 5.3.9.1) | 126.01 | M3 | 5,218 | ₹6,57,520.18 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete.(BCD 5.3.17.1) | 245.7 | M2 | 194.5 | ₹47,788.65 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.(BCD 5.3.17.2) | 772.8 | M2 | 372.72 | ₹2,88,038.02 |
| - | providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing exclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. TMT Fe 500 (only valid for SAIL & TATA STEEL).(BCD 5.5.4) | - | MT | 83,314.02 | - |
| - | providing Tor steel reinforcement of 10mm,12mm,& 16mm. dia bars as per approved design and drawing inclusive carriage of M.S. bars to work site, cutting, bending and binding with annealed wire with cost of the wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.(a) 10mm (TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)} | 1 | MT | 82,096.54 | ₹82,014.44 |
| - | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) | 24.48 | M3 | 55.28 | ₹1,353.25 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
TENDER_DOCUMENTS.pdf
Tender Documents • 6.42 MB
BOQ_159518.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].