Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
31 Aug 2026, 3:00 pm7d left
Sudipta Bose (EE/EL)
nbdd uttarkanya
Supply and Fixing of Solar Battery and Charging Controller for Street Light in the approach road of Bolla Kali Mandir area in the district of Dakshin Dinajpur.
2026_NBDD_1038264_4
NBDD/BS/EE /NIQ-16- (EL) of 2026-2027(SL No. 01 to 10)
Open Tender
Electrical Work/ Equipment
Item Rate
120 days
Dakshin Dinajpur
Please refer Tender documents.
6 documents required · 6 mandatory
₹30,000
Yes
14 Aug 2026
14 Aug 2026
3 Sept 2026
14 Aug 2026
31 Aug 2026
14 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, installation, Testing & Commissioning of the integrated type solar PV lighting system on the existing pole structure, comprising of 30 watt, 6V Mono Passivated Emitter and Rear Contact (PERC) Solar Panel (minimum efficiency 21%), Pulse with modulation (PWM)/Maximum Power point tracking (MPPT) charge Controller in the box with a sleek appearance and a sturdy structure, is weather-proof, and is simple to install, With Lithium- Iron Phosphate Battery (LiFePO4), charging time 8-10 hours, Battery backup time 12 hours (minimum), LED fixture watt 30 watt, Input voltage: 12V DC , Operating temp range -5 0C to 50 0C, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency >85%, IP-66,IK-08, CRI >70 , under voltage and over voltage protection, Electro Magnetic Interference (EMI) Electro Magnetic Compatibility (EMC) As per CISPER 15 A, lenses for beam angle as per Illuminating Engineering Society of North America (IESNA) type I/II/III as per the width of the road and the project requirement, Correlated Colour Temperature (CCT) 5700°K (As per American National Standard Institute (ANSI Bin)) , life time (LED,Driver & electrical circuitary) of 50K hours lamp buring hours till the 70 % of initial Lumen maintained as per LM80 extrapolation IES TM-21-11 report, automatic swich on/off, Alliuminium or Acrylonitrile Butadiene Styrene (ABS body), can be installed on a pole or wall. System lumen efficacy >120 lm/Watt output. LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted.. All as per pre approved by Engineer in-charge complete in all respect i/c external connections with 1.5 sq mm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required, complete with mounting structure for the battery and accessories suitable for withstand wind storm speed as per the site location. (Thermal management: heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C). 30 Watt (System lumen efficacy >120 lm/Watt) (Make Halonix/Philips/Orient Electric/Panasonic) Submission of test report and warranty certificate from OEM for atleast 5 years is mandatory. | - | Nos. | - | - |
| 2 | Erection of RCC/ PCC pole of following length in brick ballast and ramming the foundation, finishing with 150mm thick cement concrete (1:3:6) layer on top with including excavation and refilling etc as required. Above 4.5 Meter and upto 6.5 Meter | - | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.47 MB
Tendernotice_2.pdf
PDF • 0.51 MB
BOQ_2550522.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].