Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.0 LAccepted-AOC | ₹8.0 L | 1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | S Unnikrishnan L1 |
|---|---|---|---|---|
| 1.00Retarring | ||||
| 1.00 | 75.5.5.A.1pb : Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates
<br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 9 | sqm | 271.26 ₹2,441.3 |
| 1.00 | 75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates
<br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 22.8 | sqm | 352.01 ₹8,025.93 |
| 1.00 | 75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. | 2,988 | sqm | 15.26 ₹45,610.62 |
| 1.00 | 75.9.3.pb.pa : Plastic roads- Packed Bitumen Rate <br> 20mm thick Open-Graded Premix Carpet
using Bituminous (penetration grade/modified bitumen) Binder -<br> Bitumen S-65 -
Packed Bitumen and Shredded Plastic<br> <br> Providing, laying and rolling of opengraded
premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates
either using penetration grade bitumen or emulsion to required line, grade and level to
serve as wearing course on a previously prepared base, using HM Plant attached with
open pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, then
transferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2
mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hot
bitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rolling
with a. three wheel 80-100 kN static roller capacity, finished to required level and grades
to be- followed by seal coat of either Type A or Type B or Type C as per Technical
Specification Clause 508 <br> Case - I By Manual Means <br> <br> (II) Bitumen (S-65) | 2,988 | sqm | 176.95 ₹5,28,728.99 |
| 1.00 | 75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br>
A. By Manual Means <br>
Case III : Type C <br>
(II) Bitumen (S-65) | 2,988 | sqm | 69.95 ₹2,09,011.8 |
Tender Value
₹9 L
EMD Value
₹13,500
Closing Date
18 Aug 2021, 5:00 pmClosed
Assistant Engineer
Office of the Assistant Engineer LID EW Section Ayarkunnam GP
Ayarkunnam GP P No 32 Paanamkunnu Neericadu Harijan Colony Road Re Tarring
2021_LSGD_433832_1
02/2021/AE/LSGD/ARKM/21-22
Open Tender
Civil Works - Roads
90 days
Ayarkunnam GP
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,800
₹13,500
22 Jun 2026
7 Aug 2021
27 Aug 2021
7 Aug 2021
18 Aug 2021
9 Aug 2021
Amount
Retarring
75.5.5.A.1pb : Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.5.B.2pb : Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates <br> Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.3pb : Tack Coat - With Packed Bitumen Rates <br> Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.9.3.pb.pa : Plastic roads- Packed Bitumen Rate <br> 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder -<br> Bitumen S-65 - Packed Bitumen and Shredded Plastic<br> <br> Providing, laying and rolling of opengraded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, using HM Plant attached with open pugmilll.Heating of aggregate at 150 degree Celsius to 170 degree Celsius, then transferring the hot aggregate to pugmill and add shredded plastic @10.22 kg/100m2 mixing well to form a uniform thin layer of plastic over - hot aggregate and adding hot bitumen (150 to 165 degree Celsius) @ 13.578 Kg/10m2 and mix well, laying and rolling with a. three wheel 80-100 kN static roller capacity, finished to required level and grades to be- followed by seal coat of either Type A or Type B or Type C as per Technical Specification Clause 508 <br> Case - I By Manual Means <br> <br> (II) Bitumen (S-65)
75.5.12.A.3.2pb : Seal Coat - Manual Means - Type C - Bitumen S-65 - Packed Bitumen Rates <br> Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C as per Technical Specification Clause 510 <br> A. By Manual Means <br> Case III : Type C <br> (II) Bitumen (S-65)
Bidder Name
S Unnikrishnan
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_616252.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid