| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | L1 | Accepted-AOC L1 bidder accepted | |
| 2 | L2₹7.1 L+₹9,546.84 (1.36%)Rejected-AOC | L2 | Rejected-AOC L2 bidder rejected | |
| 3 | L3₹7.1 L+₹10,735.29 (1.53%)Rejected-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L3 | Rejected-AOC L3 bidder rejected |
Tender Value
₹8.4 L
EMD Value
₹20,965
Closing Date
21 Sept 2023, 3:00 pmClosed
Assistant Executive Engineer
MI Sub Division Aluva
Annual maintenance
2023_Irrig_603090_1
IRR/IA/TR/3182/2023_5_1_1/1
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Kalady
Please refer Tender documents
10 documents required · 10 mandatory
₹1,850
Yes
₹20,965
Yes
11 Oct 2023
15 Sept 2023
23 Sept 2023
15 Sept 2023
21 Sept 2023
15 Sept 2023
15 Sept 2023 - 21 Sept 2023
Amount
Appendics-A- Suction Pit Cleaning
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
OD4554/2023-2024:Supplying and fixing plastic mesh 25x25x2mm for trash rack to to fixing GI pipe frames including cost and conveyance of all materials and labour charges etc complete
60.4:Locking Arrangements - Supplying and Fixing lock and locking arrangements with suitable chain hooks,and padlock of 65mm size.
OD4555/2023-2024:Labour engaged for clearing blocks in siphons , removal of obstructions and waste etc in canal during the entire periods of water distribution
Appendics-2- Canal Rectification works
15.2.2:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand)
10.1:Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
60.2.1:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
50.18.8.9.1:Providing and fixing PVC pipes, fittings including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes with one step PVC solvent cement and testing of joints complete as per direction of Engineer-in-Charge. Concealed work, including cutting chased and making good the wall etc. 110 mm pipe 6kgf/cm2
2.10.1.2:Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil. and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m:Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm dia
OD12693/2023-2024:Supplying and laying 160mm dia PVC pipes (6kg/cm2)and specials, solvent cement from the stacking places of work site, lowering in to trenches already made, placing in position aligning the pipe to lines and levels and jointing the pipes and specials with solvent cement and testing the pipe line with water to the required test pressure including hire charges for all tools testing equipments cost and conveyance of water etc complete.
60.4:Locking Arrangements - Supplying and Fixing lock and locking arrangements with suitable chain hooks,and padlock of 65mm size.
E V POLLY
DAISY JOSE
Bidder Name
DAISY JOSE
E V POLLY
WILSON THOMAS
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_897751.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .