Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical HPSEBL THALOUT | Accepted-Technical Qualifying the criteria |
| 2 | Accepted-Technical R O VPO DAULATPUR CHOWK TEHSIL GHANARI DISTRICT UNA HP | UNA | HIMACHAL PRADESH | 174301 | Accepted-Technical Qualifying the criteria |
| 3 | Accepted-Technical VILLAGE GHAMRADA P O SOLDHA TEHSIL SADAR DISTRICT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | Accepted-Technical Qualifying the criteria |
Tender Value
₹3.8 Cr
EMD Value
₹7.5 L
Closing Date
11 Aug 2026, 10:30 amClosed
Executive Engineer
HPPWD Division Baijnath
Construction of Main building including Water Supply and Sanitary installation, Septic tank and Rain water harvesting system
2026_PWD_140295_1
PWD/BD/NIT/2026-27-6525-74 dated 29.07.2026
Open Tender
Civil Works
Percentage
Baijnath
Mentioned in the SBD
14 documents required · 14 mandatory
₹7,000
₹7.5 L
24 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
11 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in earthwork in hilly areas in all heights and depths, in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hard rock. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution, etc. and to protect stability of hill side. Rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited). All earth work in cutting/excavation, including rock excavation shall be carried out true to lines, grades, side slopes, width, camber, super-elevation and levels as shown on the drawings or as directed by the Engineer-in-charge, in conformity with the requirement of technical specification clause 1603.1 and 1603.2 to achieve designed formation width including hauling and stacking of material useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified manner,up to all leads & lift and finishing of the road to specified dimensions or as directed by the Engineer-in charge for smooth riding. Any loss to the public and private property during the course of excavation shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all cases. The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 1,860.85 | Per Cubic Meter | 153 | ₹2,84,710.05 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains etc in all kind of soil including dressing of sides and ramming of bottoms, lift upto any height including getting out the excavated soil and disposal of surplus excavated soil asdirected, within any lead from the edge of excavation. All kind of soil complete and as per the entire satisfaction and direction of Engineer-in-Charge. The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 1,027.27 | Per Cubic Meter | 240.45 | ₹2,47,007.07 |
| 3 | Supplying and filling in plinth with sand under floors,including watering, ramming, consolidating and dressing complete. The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 64.94 | Per Cubic Meter | 2,641.6 | ₹1,71,545.5 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for : in foundation,. Footings bases of columns etc.for mass concrete and removal of form including carriage of material in all leads and lifts and other incidentials complete The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 148.51 | Per Square Meter | 228.1 | ₹33,875.13 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for : Coulmns, Pillers, Piers, Abutments, Posts and struts complete The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 961.92 | Per Square Meter | 519.4 | ₹4,99,621.25 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for : Suspended floors, roofs, landings, balconies and removal of form including carriage of material in all leads and lifts and other incidentials complete The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 1,398.02 | Per Square Meter | 496.5 | ₹6,94,116.93 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for : Lintels, beams, plinth beams, girders, bressumers and cantilevers complete and removal of form including carriage of material in all leads and lifts and other incidentials complete The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 1,124.54 | Per Square Meter | 409.9 | ₹4,60,948.95 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for : Edges of slabs and breaks in floors and walls under 20 ( twenty )cm wide. and removal of form including carriage of material in all leads and lifts and other incidentials complete The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 503.28 | Per Square Meter | 128.1 | ₹64,470.17 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for : Stairs, (excluding landings) except spiral-staircases complete and removal of form including carriage of material in all leads and lifts and other incidentials complete The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 43.47 | Per Square Meter | 456.6 | ₹19,848.4 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for : vertical and horizental fins individually or forming box louvers band, facias and eves boards.complete and removal of form including carriage of material in all leads and lifts and other incidentials complete The rate including hauling / carriage of materials from various location by all mode of transporation in all leads, lifts and other incidental complete in all respect and entire satisification of Engineer-in-Charge. The rates are inclusive all taxes levy by the Govt. time to time excluding GST. | 261.22 | Per Square Meter | 578.3 | ₹1,51,063.53 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
Tendernotice_2.pdf
PDF • 1.19 MB
BOQ_208092.xls
BOQ • 0.51 MB
SBD.pdf
Tender Documents • 4.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .