| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 CrAccepted-AOC AK PO GHANTAPADA TALCHER ANGUL ODISHA | TALCHER | ANGUL | ODISHA | ₹2.6 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹3.3 Cr+₹73.0 L (28.1%)Rejected-Finance 205 SANDI SANDI CHITARPUR HAZARIBAG JHARKHAND 829150 | RAMGARH | JHARKHAND | 829150 | ₹3.3 Cr+₹73.0 L (28.1%) | L2 | Rejected-Finance As per Approved TCR |
| 3 | L3₹3.4 Cr+₹81.8 L (31.5%)Rejected-Finance AT SANDI RAJRAPPA PROJECT RAMGARH JHARKHAND 829150 | RAMGARH | RAMGARH | JHARKHAND | 829150 | ₹3.4 Cr+₹81.8 L (31.5%) | L3 | Rejected-Finance As per Approved TCR |
| 4 | Rejected-Technical | - | - | Rejected-Technical As per Approved TCR |
| 5 | Rejected-Technical | - | - | Rejected-Technical As per Approved TCR |
Tender Value
₹3.5 Cr
EMD Value
₹4.4 L
Closing Date
30 Mar 2026, 5:00 pmClosed
Staff Officer (Civil) Rajrappa Area
Office of the Staff Officer (Civil)GM Unit Rajrappa Area
Construction of wind breaking structure at Rajrappa Siding under Rajrappa Washery Project
2026_CCL_356671_1
CCL/Rajrappa/GM Unit/Civil/NIT/25-26/39
Open Tender
Civil Works - Others
Percentage
365 days
Rajrappa Area
As per NIT
6 documents required · 6 mandatory
₹4.4 L
10 Sept 2026
14 Mar 2026
31 Mar 2026
14 Mar 2026
30 Mar 2026
14 Mar 2026
14 Mar 2026 - 23 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 2,301.52 | cum | 188.45 | ₹4,33,721.44 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-Ill) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 152 | cum | 5,167.75 | ₹7,85,498 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 521.68 | cum | 7,365.5 | ₹38,42,434.04 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | 87.84 | cum | 8,441.35 | ₹7,41,488.18 |
| 5 | Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 50 | cum | 8,797.65 | ₹4,39,882.5 |
| 6 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement Mortar 1:6 (1 cement : 6 coarse sand). | 267.06 | cum | 5,322.15 | ₹14,21,333.38 |
| 7 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in:Cement mortar 1:6(1 cement: 6 coarse sand) | 356.08 | cum | 6,494.75 | ₹23,12,650.58 |
| 8 | 12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) | 6,250 | Sqm | 217.7 | ₹13,60,625 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 50,472.01 | kg | 75.85 | ₹38,28,301.96 |
| 10 | Finishing walls with water proofing cement paint of required shade :New work (Two or more coats applied @ 3.84 kg/10 sqm) | 6,250 | Sqm | 74.7 | ₹4,66,875 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.19 MB
BOQ_369529.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .