| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.5 LAccepted-AOC 41 7TH AVENUE ASHOK NAGAR CHENNAI 600 083 | CHENNAI | TAMIL NADU | 600083 | ₹77.5 L Quoted ₹93.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.3 Cr+₹34.7 L (37.0%)Rejected-Finance TC 22 3018 S R A111 SASTHAMANGALAM P O THIRUVANANTHAPURAM 10 | THIRUVANANTHAPURAM | KERALA | ₹1.3 Cr+₹34.7 L (37.0%) | L2 | Rejected-Finance financially disqualified |
| Sl No | Description | Qty | Unit | EC SOLUTIONS L2 | ENSYS TECHNOLOGIES (I) PVT.LTD L1 |
|---|---|---|---|---|---|
| 1.00PART A- SITC OF 100 KG/HR INCINERATOR AND ACCESSORIES | |||||
| 1.01 | Installation and Commissioning of Effluent Treatment Plant of 10 KLD capacity for Incinerator for treating the scrubbed water | 1 | NOS | 6,50,000 ₹6,50,000 Lowest | 7,85,000 ₹7,85,000 |
| 1.02 | Supply and Installation of online stack gas emission monitoring system designed as CPCB guidelines | 1 | NOS | 8,50,000 ₹8,50,000 Lowest | 8,74,000 ₹8,74,000 |
| 1.03 | Supply, Erection and Commissioning of 100 Kg/Hr Capacity Diesel fired Incinerator with advanced air pollution control devices including the material transportation and unloading in accordance with the particulars equipment requirements and technical specification etc. | 1 | NOS | 51,00,000 ₹51,00,000 | 44,65,800 ₹44,65,800 Lowest |
| 1.04 | CIVIL WORKS | 1 | NOS | - | - |
| 1.05 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 4 | cum | 16,120 ₹16,120 | 7,000 ₹7,000 Lowest |
| 1.06 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 18 | cum | 13,140 ₹13,140 | 11,250 ₹11,250 Lowest |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1.8 | cum | 21,960 ₹21,960 | 17,640 ₹17,640 Lowest |
| 1.08 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 150 | sqm | 63,000 ₹63,000 Lowest | 1,12,500 ₹1,12,500 |
| 1.09 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.
All wiork upto plinth level | 9.48 | cum | 1,27,980 ₹1,27,980 | 1,13,570.4 ₹1,13,570.4 Lowest |
Tender Value
₹83.4 L
EMD Value
₹50,000
Closing Date
28 Mar 2026, 5:00 pmClosed
Director
Regional Cancer Centre Medical College campus Medical college PO
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 100 KG/HR CAPACITY CONTROLLED AIR DIESEL-FIRED SOLID WASTE INCINERATOR AND CONNECTED WORKS
2026_RCC_847702_1
RCC/ENG-M/2025-26/E-111
Open Tender
Miscellaneous Works
Item Rate
90 days
RCC-TVM
Please refer Tender documents.
17 documents required · 17 mandatory
₹2,500
Yes
₹50,000
Yes
21 Aug 2026
16 Mar 2026
30 Mar 2026
16 Mar 2026
28 Mar 2026
16 Mar 2026
16 Mar 2026 - 28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A- SITC OF 100 KG/HR INCINERATOR AND ACCESSORIES | |||||
| 1.01 | Installation and Commissioning of Effluent Treatment Plant of 10 KLD capacity for Incinerator for treating the scrubbed water | 1 | NOS | - | - |
| 1.02 | Supply and Installation of online stack gas emission monitoring system designed as CPCB guidelines | 1 | NOS | - | - |
| 1.03 | Supply, Erection and Commissioning of 100 Kg/Hr Capacity Diesel fired Incinerator with advanced air pollution control devices including the material transportation and unloading in accordance with the particulars equipment requirements and technical specification etc. | 1 | NOS | - | - |
| 1.04 | CIVIL WORKS | 1 | NOS | - | - |
| 1.05 | Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 4 | cum | - | - |
| 1.06 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | 18 | cum | - | - |
| 1.07 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 1.8 | cum | - | - |
| 1.08 | Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 150 | sqm | - | - |
| 1.09 | Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge. Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.
All wiork upto plinth level | 9.48 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.32 MB
BOQ_1432694.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .