| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-Finance | ₹1.3 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.4 CrRejected-Finance | ₹1.4 Cr | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Tomco Engineering (P) Ltd. L2 | NALAKATH & KATTAT INTERNATIONAL L1 |
|---|---|---|---|---|---|
| 1.00STORE ROOM FOR FOOD STORAGE AT ELEPHANT CAMP MUTHANGA UNDER ELEPHANT SQUAD AND RRT RANGE | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 8.35 | cum | 360 ₹3,006.72 | 400 ₹3,340.8 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.27 | cum | 7,959 ₹34,000.85 | 7,800 ₹33,321.6 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 13.05 | cum | 8,371 ₹1,09,241.55 | 7,500 ₹97,875 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.04 | cum | 9,996 ₹10,435.82 | 8,000 ₹8,352 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 4.64 | sqm | 964 ₹4,472.96 | 850 ₹3,944 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 450.45 | kilogram | 112 ₹50,450.4 | 98 ₹44,144.1 |
| 1.01 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 13.92 | cum | 7,945 ₹1,10,594.4 | 8,500 ₹1,18,320 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 5.39 | cum | 13,486 ₹72,689.54 | 11,500 ₹61,985 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 57 | sqm | 765 ₹43,605 | 800 ₹45,600 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
5 Mar 2026, 11:00 amClosed
CCF ETW
Office of the CCF ETW Vazhuthacaud FHQ TVM
KIIFB Projects Construction and Improvement of the Infrastructure at the Elephant Rehabilitation Centre, Muthanga, Wayanad Wildlife Division, Wildlife Circle, Palakkad - General Civil Works
2026_FD_833933_1
KFD/SFDA/ETW3-385/2026/Muthnga
Open Tender
Civil Works - Others
270 days
Muthanga Wayanad
As per Bid Document
11 documents required · 11 mandatory
₹5,900
Yes
₹50,000
Yes
2 Jul 2026
6 Feb 2026
6 Mar 2026
6 Feb 2026
5 Mar 2026
6 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1STORE ROOM FOR FOOD STORAGE AT ELEPHANT CAMP MUTHANGA UNDER ELEPHANT SQUAD AND RRT RANGE | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.003 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 1.004 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 1 | sqm | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1 | kilogram | - | - |
| 1.007 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | - | cum | - | - |
| 1.008 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 1.009 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.90 MB
BIDDOCUMENT.pdf
Tender Documents • 3.24 MB
BOQ_1402650.xls
BOQ • 0.39 MB
CORRIGENDUMNOTICE.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid