| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.6 LAccepted-Finance | ₹38.6 L | L1 | Accepted-Finance 1 Lowest |
| 2 | L2₹40.8 LRejected-Finance | ₹40.8 L | L2 | Rejected-Finance 2 Lowest |
| 3 | L3₹41.4 LRejected-Finance | ₹41.4 L | L3 | Rejected-Finance 3 Lowest |
| Sl No | Description | Qty | Unit | K.MURALEEDHARAN L2 | S Mohana Kumar L1 | D.JOHN L3 |
|---|---|---|---|---|---|---|
| 1.00Appendix 1. Initial rectification work | ||||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 10 | cum | 2,340.16 ₹23,401.60 | 2,066.31 ₹20,663.10 | 2,377.56 ₹23,775.60 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 10 | cum | 5,051.97 ₹50,519.70 | 4,460.77 ₹44,607.70 | 5,132.71 ₹51,327.10 |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 5,220 | sqm | 11.08 ₹57,837.60 | 9.78 ₹51,051.60 | 11.25 ₹58,725 |
| 1.00 | OD220371/2025-2026:Close graded premix surfacing / Mixed Seal Surfacing -Providing, laying and rolling of close graded premix surfacing material 20mm thickness composed of 11.2mm to 0.9mm Type A aggregate using penetration grade bitumen using VG 30 to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying & rolling with a three wheel 8 to 10KN static roller & finishing to required level & grade as per technical specification clause 509 of MORD (usage of bitumen is 55kg/10m2) by manual means. | 5,220 | sqm | 259.42 ₹13.5 L | 229.06 ₹12.0 L | 263.56 ₹13.8 L |
| 2.00Appendix -2. Premansoon work | ||||||
| 2.00 | OD220378/2025-2026:Lifting conveying and fixing old . RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete | 2.5 | cum | 2,931.1 ₹7,327.75 | 2,588.1 ₹6,470.25 | 2,977.95 ₹7,444.88 |
| 2.00 | OD220372/2025-2026:Engaging wood cutter for cutting the branches of trees. | 30 | each | 1,141.36 ₹34,240.80 | 1,007.8 ₹30,234 | 1,159.6 ₹34,788 |
| 2.00 | OD220377/2025-2026:Hire Charges for wood cutting equipment's , pulleys etc. | 30 | Day | 1,082.59 ₹32,477.70 | 955.9 ₹28,677 | 1,099.89 ₹32,996.70 |
| 2.00 | OD220373/2025-2026:Clearing chocked up side drain by manual means and depositing the waste material for a minimum distance of 5Km lorry conveyance as per clause 305. etc complete. | 20.07 | cum | 431.93 ₹8,670.99 | 381.39 ₹7,656.40 | 438.84 ₹8,809.71 |
Tender Value
₹45.6 L
EMD Value
₹50,000
Closing Date
3 Feb 2026, 2:00 pmClosed
Executive Engineer
PWD Roads Division Thiruvananthapuram
GENERAL-RM 2025-26-RC - 2 Phase 2--One year running contract for various PWD roads under Roads section Aryanad in RVM district - 5 road stretches for a length of 16-24km - General Civil Work
2026_PWD_831510_1
PWD/RB/TR/12281/2024_5_1_1/1
Open Tender
Civil Works - Roads
360 days
PWD roads under Roads section Aryanad
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
7 Feb 2026
28 Jan 2026
5 Feb 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
Appendix 1. Initial rectification work
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD220371/2025-2026:Close graded premix surfacing / Mixed Seal Surfacing -Providing, laying and rolling of close graded premix surfacing material 20mm thickness composed of 11.2mm to 0.9mm Type A aggregate using penetration grade bitumen using VG 30 to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying & rolling with a three wheel 8 to 10KN static roller & finishing to required level & grade as per technical specification clause 509 of MORD (usage of bitumen is 55kg/10m2) by manual means.
Appendix -2. Premansoon work
OD220378/2025-2026:Lifting conveying and fixing old . RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
OD220372/2025-2026:Engaging wood cutter for cutting the branches of trees.
OD220377/2025-2026:Hire Charges for wood cutting equipment's , pulleys etc.
OD220373/2025-2026:Clearing chocked up side drain by manual means and depositing the waste material for a minimum distance of 5Km lorry conveyance as per clause 305. etc complete.
OD220376/2025-2026:Engaging tipper
OD220374/2025-2026:Engaging excavator
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
Preventive maintenance work
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
OD220370/2025-2026:Filling up potholes with bituminous ready mix compound(25kg bag) and compacting by ramming to get a compact surface including of cost of materials, laying charges,transportation to site etc. complete.Rate isarrived for a bag of 25kg
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD220369/2025-2026:Close graded premix surfacing / Mixed Seal Surfacing -Providing, laying and rolling of close graded premix surfacing material 20mm thickness composed of 11.2mm to 0.9mm Type A aggregate using penetration grade bitumen using VG 30 to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying & rolling with a three wheel 8 to 10KN static roller & finishing to required level & grade as per technical specification clause 509 of MORD (usage of bitumen is 55kg/10m2) by manual means.
OD220419/2025-2026:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork)
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete <br> For grading II- 13 mm (Nominal size) Material
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1397140.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
preliminaryagreement1.pdf
Tender Documents • 0.06 MB
viewsbd12281.pdf
Tender Documents • 1.65 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
BOQ_1397140.xls
BOQ • 0.31 MB
EPAYMENTFORM1.pdf
Tender Documents • 0.05 MB
AffidavitForm1.pdf
Additional Documents • 0.03 MB
integrity_pact.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid