Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 Cr+₹2.8 L (2.08%)Rejected-AOC | ₹1.4 Cr+₹2.8 L (2.08%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.4 Cr+₹2.9 L (2.15%)Rejected-AOC | ₹1.4 Cr+₹2.9 L (2.15%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.4 Cr+₹7.8 L (5.75%)Rejected-Finance 3 178 KERALA INDIA | PALAKKAD | KERALA | 678001 | ₹1.4 Cr+₹7.8 L (5.75%) | L4 | Rejected-Finance L4 |
| 5 | L5₹1.5 Cr+₹15.9 L (11.7%)Rejected-Finance | ₹1.5 Cr+₹15.9 L (11.7%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | AMMU INFRASTRUCTURES PVT LTD L1 | M.M.SUBAIR L3 | SANTHOSH JACK L5 | ELIAS SUNNY L2 | Rasheed L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Govt.Model Boys Higher Secondary School, Knnamkulam | ||||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 345.93 | cum | 200 ₹69,186.6 Lowest | 221.3 ₹76,554.97 | 244 ₹84,407.65 | 250 ₹86,483.25 | 229.23 ₹79,298.22 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 43.43 | cum | 6,750 ₹2,93,132.25 Lowest | 6,814 ₹2,95,911.58 | 7,535 ₹3,27,222.45 | 7,000 ₹3,03,989 | 7,058.69 ₹3,06,537.73 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 177.63 | sqm | 348.32 ₹61,870.69 | 331.5 ₹58,883.02 Lowest | 360 ₹63,945.36 | 350 ₹62,169.1 | 343.61 ₹61,034.07 |
| 1.00 | OD162368/2025-2026:supplying and fixing Ready made PVC septic tank (15 flush) sufficient thickness,cost including the material,labour charges for erection and conveyance as per the direction of the engineer at site | 1 | each | 20,282 ₹20,282 | 20,000 ₹20,000 Lowest | 21,500 ₹21,500 | 22,000 ₹22,000 | 20,008.61 ₹20,008.61 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 372.75 | sqm | 688 ₹2,56,451.31 | 655 ₹2,44,150.6 Lowest | 723 ₹2,69,497.53 | 720 ₹2,68,379.28 | 678.8 ₹2,53,022.02 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 261.78 | sqm | 909 ₹2,37,954.38 | 866 ₹2,26,698.02 Lowest | 957 ₹2,50,519.63 | 900 ₹2,35,598.4 | 897.41 ₹2,34,920.4 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 592.47 | sqm | 876 ₹5,19,006.35 | 825 ₹4,88,790.23 Lowest | 932 ₹5,52,184.84 | 900 ₹5,33,225.7 | 855.31 ₹5,06,748.08 |
| 1.01 | 2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. | 208.19 | cum | 287 ₹59,751.1 | 273.5 ₹56,940.51 Lowest | 302 ₹62,873.98 | 280 ₹58,293.76 | 283.37 ₹58,995.37 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 323.58 | metre | 205 ₹66,333.9 | 196 ₹63,421.68 Lowest | 221 ₹71,511.18 | 200 ₹64,716 | 202.99 ₹65,683.5 |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
8 Oct 2025, 11:30 amClosed
Superintending Engineer, PWD BCC Thrissur
Superintending Engineer, PWD Building Central Circle Thrissur
Items like PCC , RCC, solid blocks masonry, plastering, painting works, plumbing works , Tile flooring. pressed steel doors and windows, water supply items etc. are included in the estimate
2025_PWD_801911_1
PWD/BLDG/TR/11285/2023_5_1_1
Open Tender
Civil Works - Buildings
Item Rate
360 days
Kunnamkulam
Please refer Tender documents.
12 documents required · 12 mandatory
₹6,508
Yes
₹50,000
Yes
18 Nov 2025
25 Sept 2025
10 Oct 2025
25 Sept 2025
8 Oct 2025
25 Sept 2025
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1332148.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .