Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAccepted-AOC 1002 SUB TREASURY PEERUMEDU | IDUKKI | KERALA | 685501 | ₹7.6 L | L1 | Accepted-AOC Lowest Bidder |
| 2 | L2₹8.4 L+₹80,461.49 (10.6%)Rejected-AOC 1002 SUB TREASURY PEERUMEDU | IDUKKI | KERALA | 685501 | ₹8.4 L+₹80,461.49 (10.6%) | L2 | Rejected-AOC L2 |
| 3 | L3₹8.5 L+₹86,564.51 (11.4%)Rejected-AOC | ₹8.5 L+₹86,564.51 (11.4%) | L3 | Rejected-AOC L3 |
| 4 | L4₹8.6 L+₹99,649.81 (13.1%)Rejected-AOC KARAPPURACKAL HPC VANDIPERIYAR | DHARMAPURI | TAMIL NADU | 635106 | ₹8.6 L+₹99,649.81 (13.1%) | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Manikandan K V L4 | AL AMANA L1 | DESIGN TECH ENGINEERS AND CONTRACTORS L2 | Bobby Kurian L3 |
|---|---|---|---|---|---|---|---|
| 1.00PROTECTION WALL | |||||||
| 1.00 | 11.1.1.1:Excavation for Structures <br> Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. <br> I. Ordinary soil <br> (i) Upto 3 m depth | 52 | cum | 797.73 ₹41,485.15 | 705.33 ₹36,679.98 | 280 ₹14,561.12 Lowest | 805 ₹41,863.22 |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br> I. P.C.C grade M 10 <br> (i) Nominal mix 1:3:6 | 8.67 | cum | 7,624.24 ₹66,079.29 | 6,741.19 ₹58,425.89 Lowest | 6,800 ₹58,935.6 | 7,688 ₹66,631.9 |
| 1.00 | OD215442/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness | 182.22 | cum | 3,523.71 ₹6,42,104.53 | 3,115.58 ₹5,67,733.45 Lowest | 3,648 ₹6,64,753.15 | 3,557 ₹6,48,170.77 |
| 1.00 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204<br> For height upto 5 m <br> III. R.C.C grade M 20 | 9.86 | cum | 8,857.43 ₹87,351.97 | 7,831.55 ₹77,234.75 Lowest | 8,000 ₹78,896 | 8,951 ₹88,274.76 |
| 1.00 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.27 | tonne | 85,484.42 ₹23,337.25 | 75,583.57 ₹20,634.31 | 88,000 ₹24,024 | 8,543 ₹2,332.24 Lowest |
Tender Value
₹10.2 L
EMD Value
₹25,394
Closing Date
25 Aug 2025, 6:00 pmClosed
Assistant Engineer
O/o Assistant Engineer,LIDEW Section,Peermade
PEERMADE GRAMAPANCHAYATH-CHIDHAMPARAM FHATHIMA NAGAR PROTECTION WALL (53/2025) -DR PROTECTION WALL
2025_LSGD_787207_3
1/AE/LIDEW/PMD/2025-26
Open Tender
Civil Works - Roads
Item Rate
LID EW SECTION PEERMADE
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹25,394
Yes
14 Aug 2026
18 Aug 2025
27 Aug 2025
18 Aug 2025
25 Aug 2025
18 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1294620.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .