| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹18.0 L+₹48,765.82 (2.79%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹23.6 L+₹6.1 L (34.9%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Suprasad Chandran L1 | CUBIX INFRASTRUCTURES L2 | saaj constructions L3 |
|---|---|---|---|---|---|---|
| 1.00CIVIL | ||||||
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.32 | cum | 13,055 ₹30,313.71 Lowest | 13,382.41 ₹31,073.96 | 13,200 ₹30,650.4 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 29.64 | cum | 13,738 ₹4,07,153.11 Lowest | 14,084.38 ₹4,17,418.77 | 13,900 ₹4,11,954.3 |
| 1.00 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 26.1 | sqm | 1,029 ₹26,856.9 Lowest | 1,056.73 ₹27,580.65 | 1,100 ₹28,710 |
| 1.00 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 104.43 | sqm | 778 ₹81,243.43 Lowest | 799.34 ₹83,471.88 | 800 ₹83,540.8 |
| 1.00 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 170.92 | sqm | 982 ₹1,67,843.44 Lowest | 1,007.16 ₹1,72,143.79 | 1,000 ₹1,70,920 |
| 1.01 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 4.47 | cum | 7,814 ₹34,920.77 Lowest | 8,010.55 ₹35,799.15 | 7,900 ₹35,305.1 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 3,689.08 | kg | 114 ₹4,20,555.01 Lowest | 117.79 ₹4,34,536.62 | 200 ₹7,37,815.8 |
| 1.01 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 161.68 | sqm | 350 ₹56,588 Lowest | 360.21 ₹58,238.75 | 500 ₹80,840 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 226.54 | sqm | 377 ₹85,405.58 Lowest | 387.43 ₹87,768.39 | 500 ₹1,13,270 |
Tender Value
Refer Docs
EMD Value
₹43,823
Closing Date
8 Oct 2026, 3:00 pmClosed
HOD (SD-Mktg and Proj.)
KEL MAMALA KOCHI
MLA-SDF- Neyyattinkkara LAC- Civil and Electro Mechanical Works of Vijnjana Pradhayini Library, Thiruvananthapuram District
2026_KEL_875215_1
KRO/ BDC/2459/2026
Open Tender
Civil Works - Others
Item Rate
KEL MAMALA KOCHI
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,950
₹43,823
Yes
9 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
8 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CIVIL | |||||
| 1.001 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.32 | cum | - | - |
| 1.002 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 29.64 | cum | - | - |
| 1.003 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 26.1 | sqm | - | - |
| 1.004 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 104.43 | sqm | - | - |
| 1.005 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 170.92 | sqm | - | - |
| 1.006 | 50.6.2.2:Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 ( 1 cement : 6 coarse sand) etc complete | 4.47 | cum | - | - |
| 1.007 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 3,689.08 | kg | - | - |
| 1.008 | 50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete | 161.68 | sqm | - | - |
| 1.009 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 226.54 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1485916.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .