| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAccepted-AOC | ₹1.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 L+₹5,087 (3.40%)Accepted-AOC | ₹1.5 L+₹5,087 (3.40%) | L2 | Accepted-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| Sl No | Description | Qty | Unit | KA JOSEPH L1 | Biju Mathew L3 | Jyothi K P L2 |
|---|---|---|---|---|---|---|
| 1.00Working charges | ||||||
| 1.00 | 15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road | 125 | sqm | 137 ₹17,125 | 263.34 ₹32,917.5 | 37 ₹4,625 Lowest |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 125 | cum | 349 ₹43,625 Lowest | 405.34 ₹50,667.5 | 490 ₹61,250 |
| 1.00 | 100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals. | 150 | metre | 11 ₹1,650 | 69.44 ₹10,416 | 2 ₹300 Lowest |
| 1.00 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 250 | metre | 55 ₹13,750 Lowest | 63.51 ₹15,877.5 | 90 ₹22,500 |
| 1.00 | 100.98.1008:Engaging Coolie. | 8 | no | 719 ₹5,752 | 641.18 ₹5,129.44 | 450 ₹3,600 Lowest |
| 1.01 | OD167407/2024-2025:Taking interconnection from the existing 63-90mm pvc/HDPE line with the newly laid PVC/HDPE line using suitable specials such as Tee, Saddle... including earth work excavation in all kind of soil and cost of special.(TEE connection only) | 2 | 1 nos | 1,760 ₹3,520 | 1,230.49 ₹2,460.98 Lowest | 1,250 ₹2,500 |
| 1.01 | OD167405/2024-2025:Shifting existing house connection/Tap connection towards the new line including all earth work excavation and cost of materials. Average distance 3m | 2 | no | 2,005 ₹4,010 | 1,401.7 ₹2,803.4 | 750 ₹1,500 Lowest |
| 1.01 | 100.32.1:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 25mm Single Acting Air Valve. | 1 | no | 146 ₹146 | 102.49 ₹102.49 | 50 ₹50 Lowest |
| 1.01 | OD207020/2024-2025:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm. | 1 | no | 966 ₹966 | 675.76 ₹675.76 | 450 ₹450 Lowest |
Tender Value
₹2.3 L
EMD Value
₹5,808
Closing Date
15 May 2025, 1:00 pmClosed
AEE
Office of the Assistant Executive Engineer,PH SUB DIVISION, EDATHUA
DEPOSIT-Deposit Work 2024-25- Veeyapuram G.P RWSS to Veeyapuram Laying new 90 mm PVC line from Palayathil Colony Jn. to Anganvady No. 142 in ward No. 2 of Veeyapuram G.P.-Pipeline
2025_KWA_763749_1
02/AEE/EDVA/2025-26/28555
Open Tender
Civil Works - Water Works
Item Rate
90 days
Veeyapuram
Please refer Tender documents.
5 documents required · 5 mandatory
₹555
₹5,808
18 Sept 2025
9 May 2025
17 May 2025
9 May 2025
15 May 2025
9 May 2025
9 May 2025 - 14 May 2025
Amount
Working charges
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.8.2:Fencing 1.50m high with two rows of casuarina poles (girth 15cm to 24cm) tied with coir yarn on vertical casuarina pole (girth 15cm to 24cm) fixed at 1.5m intervals.
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
100.98.1008:Engaging Coolie.
OD167407/2024-2025:Taking interconnection from the existing 63-90mm pvc/HDPE line with the newly laid PVC/HDPE line using suitable specials such as Tee, Saddle... including earth work excavation in all kind of soil and cost of special.(TEE connection only)
OD167405/2024-2025:Shifting existing house connection/Tap connection towards the new line including all earth work excavation and cost of materials. Average distance 3m
100.32.1:Conveying and fixing C. I. Single Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 25mm Single Acting Air Valve.
OD207020/2024-2025:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Single Orifice, Small Orifice Type S1, Size 25mm.
Material Cost
100.98.213:Supply of PVC Pipe, 6kg/cm2, 90mm Dia.
OD198953/2024-2025:Cost of PVC Specials (3% of Cost of Pipe)
Jyothi K P (BID ID -2211802)
Biju Mathew (BID ID -2211956)
Bidder Name
Jyothi K P
KA JOSEPH
Biju Mathew
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1243900.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .