Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-Finance | ₹1.7 L | L1 | Accepted-Finance Qualified |
| 2 | L3₹1.7 L+₹9,397 (5.68%)Accepted-Finance | ₹1.7 L+₹9,397 (5.68%) | L3 | Accepted-Finance Qualified |
| 3 | L4₹2.0 L+₹35,209 (21.3%)Accepted-Finance | ₹2.0 L+₹35,209 (21.3%) | L4 | Accepted-Finance Qualified |
| 4 | L5₹2.2 L+₹50,284 (30.4%)Accepted-Finance | ₹2.2 L+₹50,284 (30.4%) | L5 | Accepted-Finance Qualified |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
11 Aug 2026, 6:00 pmClosed
DFO, Rajouri
DFO OFFICE RAJOURI
Construction of Entry Gate along with Display Board at Nambal (Budhal) under CAPEX 2026-27 Kandi Range of Rajouri Forest Division
2026_FD_319676_2
e-NIT 21 of 2026-27 dated 05-08-2026
Open Tender
Civil Works
Percentage
90 days
Nambal
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
DFO, Rajouri
₹5,000
14 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
11 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc.(not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqmon plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soiL. | 9.74 | Cum | 354.68 | ₹3,454.58 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed | 2.32 | Cum | 3,645.61 | ₹8,457.82 |
| 4 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 grade stone aggregate 20 mm nominal size ) and curing complete. | 18.59 | Sqm | 416.5 | ₹7,742.74 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 2.72 | Cum | 6,591.25 | ₹17,928.2 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete. | 11.15 | Sqm | 286.35 | ₹3,192.8 |
| 7 | Steel work welded in built up sections/framed work, including cutting,
hoisting, fixing in position and applying a priming coat of approved steel
primer using structural steel etc. as required.
In gratings, frames, guard bar, ladder, railings, brackets, gates and
similar works. | 1,304.75 | Kg | 134.38 | ₹1,75,332.31 |
| 8 | Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel works. | 36.25 | Sqm | 131.85 | ₹4,779.56 |
| 9 | Carving of logo and nomenclature of the park in the colurful texture as directed by engineer in charge. (INCLUDING COST OF PLANKS ON TOP OF GATE) | 1 | L/s | 20,000 | ₹20,000 |
| 10 | carriage of material Sand M.T 30km HL 900M | 2.27 | Cum | 1,463.71 | ₹3,322.62 |
| 11 | carriage of material bajri M.T 30km HL 900M | 4.53 | Cum | 1,463.74 | ₹6,630.74 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_1059672.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .