Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Hard copy not submitted. |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Copy of Experiene/Turnover and Hard copy not submitted. |
Tender Value
₹23.0 L
EMD Value
₹45,980
Closing Date
6 Aug 2026, 4:00 pmClosed
Executive Engineer PHE Division Kargil
Executive Engineer PHE Division Kargil
Laying and fitting of main/ distribution pipe line under the up-gradation/retrofitting of WSS Sapi (scheme id 8365823) (under JJM).
2026_PWD_19255_9
Short E-tender- 54 of PHE Division Kargil of 2026-27
Open Tender
Pipes and Pipe related activities
Percentage
30 days
Sapi
Refer to NIT
3 documents required · 3 mandatory
₹230
Payable To Executive Engineer PHE Division Kargil
₹45,980
20 Aug 2026
25 Jul 2026
7 Aug 2026
25 Jul 2026
6 Aug 2026
25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in bulk excavation by manual means over areas (exceeding 30cm & up to 1.5mte in depth, 1.5mtr in width as well as 10sqm on plan) including Disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed. | |||||
| 1.01 | All kind of soil 60% | 90 | Cum | 350 | ₹31,500 |
| 1.02 | Ordanary rock 20% | 30 | Cum | 550 | ₹16,500 |
| 1.03 | Hard Rock (by Chesling) 20% | 30 | Cum | 1,700 | ₹51,000 |
| 2Earth work in excavation by manual means in trenches for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: | |||||
| 2.01 | All kind of soil 60% | 660.18 | Cum | 350 | ₹2,31,063 |
| 2.02 | Ordanary rock 20% | 220.06 | Cum | 750 | ₹1,65,045 |
| 2.03 | Hard Rock (by Chesling) 20% | 220.06 | Cum | 1,800 | ₹3,96,108 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 40mm nominal size) nallah ncluding all carriage complete. | 25 | Cum | 7,500 | ₹1,87,500 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of cantering and shuttering. All work up to plinth level 1:3:6 (1: Cement: 3 coarse Sand: 6graded stone agg. 40mm nominal size) nallah ncluding all carriage complete. | 13 | Cum | 7,800 | ₹1,01,400 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_45789.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .