Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAdmitted-Finance GAT NO 304 VILLAGE KONDHAPURI TALUKA SHIRUR VILLAGE KONDHAPURI PUNE MAHARASHTRA 412209 | PUNE | MAHARASHTRA | 412209 | ₹3.6 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BURCKHARDT COMPRESSION INDIA PVT LTD L1 |
|---|---|---|---|---|
| 1.00Laying and Jointing PVC Pipe. Heading | ||||
| 1.01 | Design, Fabrication/ Manufacture, Test, Trials and commissioning of Co2 and H2 Compressor repair and test facility for Upgradation of Sax Department at Naval Dockyard, Visakhapatnam as specified at Para 1 of Part II of RFP. | 1 | Job | 2,75,00,000 ₹3,24,50,000 Lowest |
| 1.02 | Standard Accessories, if any (Refer to Para 13 of Part II) | 1 | No | - |
| 1.03 | Two years Operation & Maintenance spares (Refers to Para 14 of Part II) | 1 | No | 5,50,000 ₹6,49,000 Lowest |
| 1.04 | Special Maintenance Tools and test equipment, if any (Refers to Para 15 of Part II) | 1 | No | 2,00,000 ₹2,36,000 Lowest |
| 1.05 | Technical Literature / certificates / documentation (Refers to Para 16 of Part II) | 1 | No | 1,25,000 ₹1,47,500 Lowest |
| 1.06 | Acceptance, Testing, Trials and Commissioning charges (Refers to Para 17 of Part II) | 1 | No | 21,25,000 ₹25,07,500 Lowest |
| 1.07 | Training, if any (Refers to Para 19 of Part II) | 1 | No | - |
| 1.08 | Any other item such as transportation, insurance, freight, packing etc | 1 | No | 3,25,000 ₹3,83,500 Lowest |
Tender Value
Refer Docs
EMD Value
₹7.8 L
Closing Date
31 Jul 2020, 10:00 amClosed
DIRECTOR GENERAL
DIRECTOR GENERAL NAVAL PROJECTS, NAVAL BASE POST, NAVAL BASE, VISAKHAPATNAM -14
PROCUREMENT, INSTALLATION, TRIALS AND COMMISSIONING OF CO2 AND H2 COMPRESSOR REPAIR TEST FACILITY FOR UP-GRADATION OF SAX DEPARTMENT AT ND (V)
2020_NAVY_352059_1
DG/0991/DGNP(V)/GP4/TOKEN 03 OF 2020-21
Single
Miscellaneous Goods
Supply
425 days
NAVAL DOCKYARD, VISAKAPATNAM
AS PER TENDER DOCUMENT
5 documents required · 5 mandatory
₹500
DGNP (V)
₹7.8 L
Yes
PD AND CWE EQPT 2, CONFERENCE HALL, DGNP, VISAKHAP
30 Sept 2020
12 Jun 2020
1 Aug 2020
12 Jun 2020
31 Jul 2020
7 Jul 2020
12 Jun 2020 - 22 Jun 2020
23 Jun 2020
Laying and Jointing PVC Pipe. Heading
Design, Fabrication/ Manufacture, Test, Trials and commissioning of Co2 and H2 Compressor repair and test facility for Upgradation of Sax Department at Naval Dockyard, Visakhapatnam as specified at Para 1 of Part II of RFP.
Standard Accessories, if any (Refer to Para 13 of Part II)
Two years Operation & Maintenance spares (Refers to Para 14 of Part II)
Special Maintenance Tools and test equipment, if any (Refers to Para 15 of Part II)
Technical Literature / certificates / documentation (Refers to Para 16 of Part II)
Acceptance, Testing, Trials and Commissioning charges (Refers to Para 17 of Part II)
Training, if any (Refers to Para 19 of Part II)
Any other item such as transportation, insurance, freight, packing etc
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .