Loading…
Loading…
Tender Value
₹33.1 L
EMD Value
₹33,100
Closing Date
2 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief officer Nagarpalika Dhanera
Providing Constructing C.C Road / Fixing Paving Block and Fixing and Instalaltion RCC Benches with Interlocking Block for Various Areas at Dhanera Nagar Palika Grant: - UDP-88-2023-24 (Saving) / Professional Tax , Land Revenue and Education Cess Grant:- 2024-25 Saving and 2025-26 / Nirmal Gujarat -2-2025-26.
278540
Tender Notice 2025-26
Open
Civil - All
Banaskantha
3 documents required · 1 mandatory · 2 optional
₹1,770
Yes
Chief officer Nagarpalika Dhanera
₹33,100
Yes
19 Feb 2026
19 Feb 2026
19 Feb 2026
2 Mar 2026
19 Feb 2026
No. But may be estimated
more or less quantities
In Figure in Words
Box cutting the road surface to proper slope and camber for making a
base for road work including removing the excavated stuff and depositing Rupees Two Hundred Fifteen Paise SixtyTwo
on the road side slope as directed upto 50Mt.lead. (Mannually) Only
Box cutting the road surface to proper slope and camber for making a
base for road work including removing the excavated stuff and depositing
2.0 159.00 109.08 Rupees One Hundred Nine Paise Eight Only Cu.M
on the road side slope as directed upto 50Mt.lead. (Machinery)
Providing and laying W.B.M of B.T.M.C metal of size 45mm to 63mm size
including 20% Gritt (Stone scrinning) & stone dust as filler including Rupees One Thousand Nine Hundred
spreading watering & consolidation by vibratory roller 80KN to 100KN SixtyTwo Paise FourtyThree Only
static weight.
Providing & laying cement concrete 1:4:8( 1: cement 4 :coarse sand 8 :
Rupees Two Thousand Seven Hundred
4.0 284.00 Crushed Stone Aggregates 40mm nominal size ) and curing complete 2780.37 Cu.M
Eighty Paise ThirtySeven Only
exculding cost of form work in (a) Foundation and Plinth
Providing and casting in situ ordinary cement concrete M200 for CC
wearing coat including compaction and finishing by trimix process Rupees Four Thousand Nine Hundred
including and filling in joints with bitumen etc complete as directed by FiftySix Paise Seven Only
Engineer in Charge.
Filling available excavated earth (excluding rock) in trenches, plinth, sides
Rupees One Hundred ThirtySix Paise
6.0 34.00 of foundations etc. in layers not exceeding 20 cm. In depth consolidating 136.92 Cu.M
NinetyTwo Only
each deposited layer by ramming and watering.
Providing and fixing pre-cast Rubber Dye / steel Dye inter locking
concrete block 60mm thick with grade of concrete M300 pnumatic
compressed / vibrated mechanically and as per approved design Rupees Seven Hundred One Paise Ninety
Confirming to IS 15658 : 2006 including 35 mm Sand layer for levelling Only
and filling the joint with sand in proper line and level as per guidlines of
IRC : SP 63-2018 etc. Complete
Providing and fixing pre-cast concrete kerb stone of gray cement based
concrete block 30cm length,30cm height and 15cm thick of M200 grade
Rupees Four Hundred Two Paise FiftyFive
8.0 494.00 concret as per approved design and including excavation for fixing in 402.55 Rmt
proper line and level,filling the joint with C:M 1:3 (1cement:3fine sand) etc
Renovation of manhole by increasing the height at top including cost of
excavation, refitting of C. I. manhole frame and cover curing etc. complete
incl. all carting and providing of materials which is required for the purpose
Rupees Three Thousand Three Hundred
9.0 9.00 (except manhole frame and cover) For all type manhole by providing RCC 3374.00 No.
SeventyFour Only
1:2:4 Partition walls with required reinforcement 25 cm thick and circular
opening with 500mm clear dia and 0.40 mt. av. ht.
Finishing wall with weather proof exterior emulsion paint on wall surface
(two coats) to give an required shape even shade after thoroughly
10.0 106.20 73.83 Rupees SeventyThree Paise EightyThree Only Sq.Mt
brushing the surface to remove all dirt, and remains of loose powdered
materials.etc complete
Wall Painting (color, line, shape, form, and texture) Paint keeps out
moisture, preventing mold or mildew from building up a visual art, which is
Rupees Seven Hundred Six Paise ThirtyNine
11.0 210.00 characterized by the practice of applying paint, pigment, color or other 706.39 Sq.Mt
medium to a solid & painting that is applied to a wall surface
Providing & fixing Precast Cement Concrete Benches Exposed Texture
finish Grade of Concrete M250 including with bollt on surface ,all labour
loading ,unloading ,to be written nece writing in bench ( word in wood Rupees Four Thousand Two Hundred
texture paint) given by engineer in charge etc complete as directed. (Size FourtyTwo Only
of Bench L-1500mm ,Height - 890mm Width -450mm with leg size 100mm
x 100mm thick)
In Words Rupees ThirtyThree Lakh Eight Thousand FourtyTwo Paise EightyNine Only
I/We am/are willing to carry out the work at ………………………………………………………………………% above/below
Percent (should be written in figures and words ) of the estimated rates mentioned above. Amount of my/our tender works out as under:-
* Estimated amount * Estimated amount
Put to tender................................... Rs. ………………….. Put to tender......................................... Rs. …………………..
Deduct : ............................% below Rs. ………………….. Add ……............................... % above Rs. …………………
Net.................................................. Rs. ………………….. Total ...................................................... Rs. …………………
In words …………………………………………............................................................. In words …………………………………………........................................................................
* (Please strike out whicheve is not applicable).
Note 1- All work shall be carried out as per Public Works Department Handbook and other specifications of Division or as directed.
Note 2- All the columns is Schedule should be filled in ink and the total of the entries in the last column should be struck by the contractor under his signature.
Note 3- Rates quoted include clearance of site (prior commencement of work and at itscolose) in all respects and hold good for work under all conditions, site, moisture, weather etc.
Note 4- To be continued on additional sheets, if found necessary.
Note 5- Above Schedule-B Amount is without GST but GST18% will be charged on the bill generated.
Chief Officer
Signature of the contractor: Dhanera Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1-NIT.pdf
2-SBD.pdf
3.Schedule B.pdf
5-Road Work Specification (Booklet).pdf
7.Govt GR.pdf
Download all tender documents and submit your bid