Tender Value
₹42.4 L
EMD Value
₹43,000
Closing Date
13 Jul 2026, 6:00 pmClosed
Executive Engineer, Surendranagar Irrigation Division, Surendranagar
Restoration and Strengthening component of overflow and non overflow section of wadhwan bhogavo- 1 (Nayka) Irrigation Scheme for the year 2026-27
318182
06 of 2026-27
Open
Civil Works - Others
Lump-sum
Surendranagar
6 documents required · 5 mandatory · 1 optional
₹1,500
Executive Engineer, Surendranagar Irrigation Division, Surendranagar
₹43,000
26 Jun 2026
26 Jun 2026
26 Jun 2026
13 Jul 2026
26 Jun 2026
1. The bill of Quantities shall be read in conjunction with the Instructions to
Bidder,ConditionsofContract,TechnicalSpecificationsandDrawings.
2. The quantities given in the Bill of Quantities are estimated and provisional,
andare given to provide a common basis for bidding. The basis of payment will
be theactual quantities of work ordered and carried out, as measured by the
Contractorand verified by the Engineer and valued at the rates and prices
tendered in thepriced Bill of Quantities, where applicable, and otherwise at
such rates and pricesasthe Engineermayfixwithin the termsofthe Contract.
3. TheratesandpricestenderedinthepricedBillofQuantitiesshall,exceptionsofareasi
tisotherwiseprovidedundertheContract,includeallconstructionalplant,layout,su
pervision,materials,erection,maintenance,insurance,profit,taxes and duties,
together with all general risks, liabilities and obligations set outorimpliedin the
4. TheratesandpricesshallbequotedentirelyinIndianCurrency.
5. A rate or prices shall be entered against each item in the Bill Quantities,
whetherquantities are stated or not. The cost of Items against which
Contractor has failedto enter a rate or price shall be deemed to be covered by
other rates and pricesenteredin theBillofQuantities(in case ofItemrate
6. The whole cost of complying with the provisions of the Contract shall be
includedin the items provided in the priced Bill of Quantities, and where no
Items areprovided the cost shall be deemed to be distributed among the rates
and pricesenteredforthe relateditems ofWork.
7. Generaldirectionand descriptionsofwork and materialsarenot
necessarilyrepeatedorsummarizedintheBillofQuantities.Referencestothereleva
ntsections of the contract documentation shall be made before entering rates
orpricesagainst eachiteminthe BillofQuantities.
8. Themethodofcompletedworkofpaymentshallbeinaccordancewiththespecificati
on for this work. For building works specifications forbuildingare tobe
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerrorspursuantto
Clause29oftheInstructionstoBidder.
10. Rock is defined as all materials which, in the opinion of the Engineer,
requiredblasting,ortheuseofmetalwedgesandsledgehammers,ortheuseofcompr
essed air drilling for its removal, and which cannot be extracted by rippingwith
attract orofatleast150kw withasinglerearmountedheavy duty ripper.
BILL OFQUANTITIES
(A) Percentage Rate Tender (Up to INR 50 Cr.)
Item DescriptionofItem(withbriefs Quantity Unit RateIn Amount
No pecification and referenceto figures
book ofspecifications)
Attached Separately In
I/We am/are willingtocarryouttheworkat…......................%above/below
percent(Shouldbewritteninfiguresandwords)oftheestimatedratementionedabove.
Amountofmy/ourtender works out asunder.
Estimated amount put totender Estimated amount put totender
Deduct………%below Add………%Above
Inwords Inwords
(B) For Item Rate Tender (For above INR 50Cr.):
Item Description ofItem(with Quantity Unit Rate Amount
No briefspecificationandrefe
rencetobookofspecificat Infigur InWor
(A) Total TenderedAmount
(B)Rebateonabovetenderedamount(ifany)%(infigure)………………………………
(C)NetTenderedAmount(A-B)(infigure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed
bytheEngineer-In-Charge for which no extra payment shall bemade.
2 Thelabourcesswillbedeductedasperprevailingrulesi.e. 1%oftheworkdone.
3 GSTandIncometaxTDSwillbedeductedatasourcewhilemakingpaymentsofbills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken
asperGovt. G.R. NO.: MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R.
R.C.C. items where there is a change as per actual mix design the cost of
differenceofcementconsumptionhavebeendeductedfromtherateoforiginalitemattherateo
finput rate mentioned in all thetender.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01- TITLE PAGE.pdf
02- E TENDER NOTICE.pdf
03- Invitation For Bid P 1 to 6.pdf
04- SECTION-1 Instruction to Bidders P 7 to 27.pdf
05- SECTION-2 Qualification Informataion P 28 to 35.pdf
06- SECTION-3 Conditions of Contract P 36 to 63.pdf
07- SECTION-4 Contract Data P 65 to 74.pdf
08- SECTION-5 Tech Specification.pdf
09- SECTION-6 Form of Bids P 145 to 147.pdf
10- SECTION-7 BOQ P 148 to 150.pdf
11- SECTION-7 BOQ Schedule-B.pdf
12 SECTION-8 TO 10 Forms Drawing P 152 to 166.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .