| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | ₹2.7 L | L1 | Accepted-AOC 1st lowest bidder |
| 2 | L2₹3.5 L+₹80,150 (30.1%)Rejected-AOC | ₹3.5 L+₹80,150 (30.1%) | L2 | Rejected-AOC 2nd lowest bidder |
| 3 | L3₹3.8 L+₹1.1 L (41.3%)Rejected-AOC | ₹3.8 L+₹1.1 L (41.3%) | L3 | Rejected-AOC 3rd lowest bidder |
| 4 | Rejected-Technical 159 GALI NO 3 NEW 367 SHIBBAN PURA GHAZIABAD UP 201009 | GHAZIABAD | UTTAR PRADESH | 201009 | - | - | Rejected-Technical The supporting documents and credentails not submitted as per NIT |
Tender Value
₹5.0 L
EMD Value
₹9,916
Closing Date
19 Sept 2023, 6:00 pmClosed
Executive Engineer (C)
Executive Engineer(C) BSNL Civil Division, Main T.E. Building, Avas Vikas, Haldwani
External AR and MO to Telephone Exchange Building, Almora in Nainital BA
2023_BSNL_167254_1
22/NIT/EE(C)/BSNL/HLW/2023-24
Open Tender
Civil Works
Item Rate
61 days
Almora
Please refer to DNIT
12 documents required · 12 mandatory
₹590
Yes
AO (Cash, BSNL, O/o GMT, Nainital BA
₹9,916
Yes
Haldwani
6 Oct 2023
11 Sept 2023
21 Sept 2023
11 Sept 2023
19 Sept 2023
11 Sept 2023
15 Sept 2023
Amount
Sub-Head : Dismantling and Demolishing
Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Sub-Head : Finishing
12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand)
Finishing walls with Acrylic Smooth exterior paint of required shade :
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm).
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete.
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade :
One or more coats on old work.
Finishing walls with Acrylic Smooth exterior paint of required shade :
Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm) on existing cement paint surface).
Old work (One or more coat applied @ 0.90 ltr/10 sqm).
Sub-Head : Repairs to Buildings
Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground , all complete as per directions of Engineer-In-Charge.
With cement mortar 1:4 (1 cement : 4 fine sand).
Renewing glass panes, with putty and nails wherever necessary including racking out the old putty:
Float glass panes of nominal thickness 5 mm (weight not less than 12.5kg/sqm).
Sub-Head : Conservation of Heritage Buildings
Providing and fixing double scaffolding system for repair works on the exterior/interior side or as required, upto four storey height made with bamboos 1.50 m c/c horoizontal and vertical bamboos along with challies tied with ropes & wires with suitable climbing ladders and working platforms, including, maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding all complete as per direction of Engineer-in-Charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for execution of all items for such works.
AMIR AHAMED
HARISH TRADERS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .