Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC GOA | SOUTH GOA | GOA | 403713 | ₹11.9 L | L1 | Accepted-AOC L1Bidder |
| 2 | L2₹12.0 LRejected-Finance HOUSE NO 195 3 NAIKWADA CANCA BARDEZ GOA | ₹12.0 L | L2 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Mehboob A Mulla L1 | I B CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding in all kinds of soilas directed in dewatering the trenches and bailing out water including removal of slush, mud etc. for any depth and disposal of pumped mud, water, slush to suitable point not forming circuit of return of pumped water to the very trench, by employing diesel generated pumpas directed by Engineer in charge. | 149.04 | Cum | 795 ₹1.2 L | 800 ₹1.2 L |
| 2.00 | Earthwork in excavation over areas in saturated soil (exceeding 0.30 m upto a depth of 0.60 m) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m disposed earth to be neatly dressed and leveled including pumping or bailing out water | 55.02 | Cum | 765 ₹42,090.30 | 795 ₹43,740.90 |
| 3.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 30.46 | Cum | 2,300 ₹70,058 | 2,350 ₹71,581 |
| 4.00 | Centering & shuttering including Strutting, Propping & removal of forms for : a) Foundations, footings, bases for columns and mass concrete. | 162.72 | Sq.m | 450 ₹73,224 | 455 ₹74,037.60 |
| 5.00 | Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto Plinth Level. | 97.07 | Cum | 7,150 ₹6.9 L | 7,205 ₹7.0 L |
| 6.00 | Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge : a) 110 mm dia | 24 | RM | 410 ₹9,840 | 470 ₹11,280 |
Tender Value
₹11.3 L
EMD Value
₹22,700
Closing Date
25 Aug 2025, 5:00 pmClosed
EE I WRD Porvorim
EE I WRD Porvorim
Repairs to the tank belonging to Naguesh Devasthan at Molebhat in V.P. Curca, Bambolim and Talaulim in St. Andre Constituency.
2025_WRD_23993_1
6-9/WDI/WRD/ASW/25-26/e-15/8
Open Tender
Miscellaneous Works
45 days
EEI WRD Porvorim Goa
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹22,700
20 May 2026
25 Jul 2025
26 Aug 2025
25 Jul 2025
25 Aug 2025
25 Jul 2025
Amount
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sq.m on plan) including disposal of excavated earth lead upto 50 m and lift upto 1.5m disposed earth to be leveled and neatly dressed including providing barricading, danger lighting guarding in all kinds of soilas directed in dewatering the trenches and bailing out water including removal of slush, mud etc. for any depth and disposal of pumped mud, water, slush to suitable point not forming circuit of return of pumped water to the very trench, by employing diesel generated pumpas directed by Engineer in charge.
Earthwork in excavation over areas in saturated soil (exceeding 0.30 m upto a depth of 0.60 m) including disposal of excavated earth lead upto 50 m and lift upto 1.5 m disposed earth to be neatly dressed and leveled including pumping or bailing out water
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete.
Centering & shuttering including Strutting, Propping & removal of forms for : a) Foundations, footings, bases for columns and mass concrete.
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggregate. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto Plinth Level.
Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the concrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge : a) 110 mm dia
I B CONSTRUCTIONS (BID ID -51795)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
Tendernotice_2.pdf
PDF • 1.09 MB
BOQ_24419.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid