| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance | -0.87% | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 CrAdmitted-Finance | +4.89% | ₹1.7 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.8 CrAdmitted-Finance | +10.51% | ₹1.8 Cr | L3 | Admitted-Finance |
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
11 Aug 2026, 6:00 pmClosed
Executive Engineer
KDA Kota
CIVIL WORK
2026_UITKo_581125_1
NIT 17/2026-27 (29)
Open Tender
Civil Works
Percentage
240 days
Kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
6000 Secrectry KDA, 2000 MD
₹3.2 L
Yes
19 Aug 2026
8 Aug 2026
12 Aug 2026
8 Aug 2026
11 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 130 | Cum | 632 | ₹82,160 |
| 2Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202. | |||||
| 2.1 | BY MECHANICAL MEANS | - | - | - | - |
| 2.2 | Prestressed/reinforced cement concrete grade M-20 & above. | 50 | Cum | 478 | ₹23,900 |
| 3 | Construction of embankment with approved Material obtained from borrow-pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of Table 300-2 including cost of compensation for earth taken from private land with lead upto 1 km as per MoRTH Specification : Clause No. 305. | 675 | Cum | 58 | ₹39,150 |
| 4 | Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion
complete.[MoRTH specification : Clause 401]. By mechanical means. For Grading-III Material Plant Mix Method | 281.25 | Cum | 845 | ₹2,37,656.25 |
| 5 | Providing, laying, spreading and compacting crushed graded stone aggregate as per table 400-10 & 400.11 to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), as per design mix, carriage of mixed material by tipper to site, laying in uniform layers in motor grader/F.E. loader/ paver finisher, in subbase/base course on a well prepared under -base and compacting with vibratory roller to achieve the desired density including lighting, guarding, barricating and maintenance of diversion, etc. (MoRTH Specification : Clause 406) with all lead & lift | 281.25 | Cum | 1,147 | ₹3,22,593.75 |
| 6Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. Rubble Stone Masonry in Cement Mortar | |||||
| 6.1 | Rubble Stone Masonry in Cement Mortar | 187.5 | Cum | 195 | ₹36,562.5 |
| 7 | Carriage of material from quarry / crusher to work site including loading, unloading and stacking all complete. Earth, Sand, Lime, Morrum manure or sludge for 10 KM | 675 | Cum | 79.55 | ₹53,696.25 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.97 MB
Special_Condition_29.pdf
Tender Documents • 0.52 MB
BOQ_1032656.xls
BOQ • 0.40 MB
Corrigendum_17.pdf
PDF • 0.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].