Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.5 LAccepted-AOC TATA ROAD RAM BHAWAN TATA ROAD CHAIBASA CHAIBASA WEST SINGHBHUM CHAIBASA 2824 833201 | WEST SINGHBHUM | JHARKHAND | 833201 | ₹20.5 L | 1 | Accepted-AOC Lowest Bidder |
| 2 | 2₹22.4 L+₹1.9 L (9.38%)Rejected-Finance | ₹22.4 L+₹1.9 L (9.38%) | 2 | Rejected-Finance Higher rate |
| 3 | 3₹23.9 L+₹3.4 L (16.7%)Rejected-Finance | ₹23.9 L+₹3.4 L (16.7%) | 3 | Rejected-Finance Higher rate |
| 4 | 4₹24.0 L+₹3.5 L (17.2%)Rejected-Finance | ₹24.0 L+₹3.5 L (17.2%) | 4 | Rejected-Finance Higher rate |
| 5 | 5₹24.3 L+₹3.8 L (18.6%)Rejected-Finance VILL P O TIKOLA KALAN ROORKEE HARIDWAR | HARIDWAR | UTTARAKHAND | 247656 | ₹24.3 L+₹3.8 L (18.6%) | 5 | Rejected-Finance Higher rate |
Tender Value
Refer Docs
EMD Value
₹64,000
Closing Date
25 Oct 2021, 2:00 pmClosed
Executive Engineer
RWD Haridwar
Government girls Inter College including boundary wall construction gate in Bhori
2021_RES_37366_1
rwd_hdr_1199 bhori
Open Tender
Civil Works - Buildings
Item Rate
180 days
RWD Haridwar
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
Yes
Director, Horticulture and Food Processing, Uttara
₹64,000
Yes
19 Sept 2023
13 Oct 2021
26 Oct 2021
13 Oct 2021
25 Oct 2021
14 Oct 2021
Amount
Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand)
Reinforced Cement Concrete Work Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Brick work with F.P.S. bricks of class designation 75 in superstructure above plinth level upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All works above plinth level upto floor V level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
12 mm cement plaster of mix 1:6 (1 cement : 6 fine sand)
15 mm cement plaster of mix 1:6 (1 cement : 6 fine sand)
Providing and fixing M.S. Tubular frames for doors, windows, ventilatorsand cupboard with rectangular/ L-Type sections, made of 1.60 mm thickM.S. Sheet, joints mitred, welded and grinded finish, withprofiles ofrequired size, including fixing of necessary butt hinges and screws andapplying a priming coat of approved steel primerFixing with 15x3 mm lugs 10 cm long embedded in cementconcrete block 15x10x10 cm of C.C. 1:3:6 (1 Cement : 3 coarsesand : 6 graded stone aggregate 20 mm nominal size)
Finishing walls with water proofing cement paint of required shade
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture.
sign board
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Reinforcement for R.C.C. Work Using Thermo-Mechanically Treated Bars!All works upto floor-v level
Centring and shuttering for foundations, footings, bases of columns, etc. for mass concrete
Centring and shuttering Columns, Pillars, Piers, Abutments, Posts and Struts
Centring and shuttering Lintels, beams, plinth beams, girders, bressumers and cantilevers
M/s Rakesh Kumar Contractor
M/s Jogender Singh Contractor
Sanjeev Arya
MALIK CONSTRUCTION CO.
SHAMEEM CONTRACTOR
M/s Yamin Contractor
Shri Balaji Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .