| Sl No | Description | Qty | Unit | Amar Singh L2 | M/S Roop Singh Kathayat L1 |
|---|---|---|---|---|---|
| 1.00 | Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 70.87 | cum | 408.4 ₹5,209.80 | 408 ₹5,204.69 |
| 2.00 | RandomRubbleStoneMasonry laidDry, inbreastwalls, retainingwalls, etc. including supply of all material, labour, T&P and royaltiies etc. completeasper drawingand technical specificationsClauses702, 704, 1202 & 1203 of MORD Specifiction | 113.67 | Cum | 2,199.5 ₹45,003.09 | 2,198 ₹44,972.40 |
| 3.00 | Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 of MORD Specifiction | 163.7 | cum | 4,839.6 ₹1.4 L | 4,839 ₹1.4 L |
| 4.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and
technical specifications Clauses 702, 704, 1202 & 1203 of MORD
Specifiction | 47.42 | cum | 4,114.6 ₹35,120.58 | 4,113 ₹35,106.92 |
| 5.00 | Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 150 mm x 150 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 | 50.63 | cum | 1,763.2 ₹16,068.75 | 1,763 ₹16,066.92 |
| 6.00 | Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | 50 | cum | 1,048.7 ₹9,438.30 | 1,048 ₹9,432 |
Tender Value
Refer Docs
EMD Value
₹33,000
Closing Date
6 Apr 2026, 1:00 pmClosed
Zonal Manager
PLOT NO. 56/1 LANE C-11, TURNER ROAD, DEHRADUN (UTTARAKHAND)
Restoration work of L057-NarsinghDanda to Bhageena Bhandari
2026_CCUK_147128_1
UT-04-46 (Aapda)
National Competitive Bid
CIVIL
90 days
CHAMPAWAT
As per technical bid
3 documents required · 3 mandatory
₹5,900
Zonal Manager, NPCC LTD
₹33,000
15 Apr 2026
28 Mar 2026
6 Apr 2026
28 Mar 2026
6 Apr 2026
28 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. | 1 | cum | - | - | Item1 | |
RandomRubbleStoneMasonry laidDry, inbreastwalls, retainingwalls, etc. including supply of all material, labour, T&P and royaltiies etc. completeasper drawingand technical specificationsClauses702, 704, 1202 & 1203 of MORD Specifiction | - | Cum | - | - | Item2 | |
Cement plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all material, labour, T&P etc. required for proper completion of the work. as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 of MORD Specifiction | 1 | cum | - | - | Item3 | |
Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and
technical specifications Clauses 702, 704, 1202 & 1203 of MORD
Specifiction | - | cum | - | - | Item4 | |
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 150 mm x 150 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 | - | cum | - | - | Item5 | |
Hand Packed stone filling in back of wallls including cost of all materials, royality, T&P etc. complete as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) | - | cum | - | - | Item6 |
stage.html
html • 0.04 MB
technical_228776.pdf
techsummary_228776.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
SBD.pdf
Tender Documents • 1.30 MB
BOQ_228776.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid