Tender ID
Tender Value
₹12.4 L
EMD Value
₹13,000
Closing Date
11 Feb 2026, 6:00 pmClosed
Executive Engineer, Panchayat (R&B) Division, Tapi
Reti Kankar 2025-26 Const. of Samajik Shed in Hanuman chauk at Village Vadoli Ta.Nizar Dist.Tapi.
271303
26 OF 2025-26
Open
Civil Works - Buildings
Works
Tapi
6 documents required · 6 mandatory
₹900
Yes
Executive Engineer, Panchayat (R&B) Division, Tapi-Vyara
₹13,000
Yes
30 Jan 2026
30 Jan 2026
30 Jan 2026
11 Feb 2026
30 Jan 2026
It. Rate In
Specification and reference to book of Quantity Unit Amount
No. Figures
specifications)
1 Boring holes 1.20 m deep in ordinary soil (for 8.00 Nos 1561.19
cast in situ piles) and getting out the soil and
disposal of the surplus excavated soil as
directed within a lead of 50 Meter for
following diameter of pipes.(iii) 300 mm
2 Providing and laying controlled cement 0.85 Cum. 4649.51
concrete M-200 for R.C.C. bored piles of
1.20 Mt. diameter including ramming,
vibrating, curing and finishing complete
3 Filling in foundation and plinth with murrum 50.20 Cum. 296.30
including watering ramming and
consolidating etc. complete
4 Providing and laying controlled cement 3.35 Cum. 8871.33
concrete M.200 and curing complete
excluding the cost of formwork and
reinforcement for reinforced concrete work in
(D) Columns, Pillars posts and struts upto
floor two level.
5 Providing and laying controlled cement 7.12 Cum. 6375.70
concrete M.200 and curing complete
excluding the cost of formwork and
reinforcement for reinforced concrete work in
(C) Slabs, landing, shelves, Balconies
Lintels, Beams, Girders and Cantilever upto
floor two level
6 Providing and laying cement concrete 1:2:4 27.00 Cum. 3786.47
(1- Cement : 2- Coarse sand : 4- graded
stone aggregates 20 mm nominal size) and
curing complete excluding cost of formwork
in (A) Foundation and Plinth (more than
7 Brick work using common burnt clay building 15.63 Cum. 4121.55
brick having crushing strength not less than
35 kg/sq. cm. in foundation and plinth in
cement mortar 1:6 ( 1 Cement: 6 fine sand)
(B) Convention
8 Providng TMT bars renforcement of FE 3359.92 kg 77.29
500/500D for R.C.C. work including bending
binding and placing in position complete for
all floor.
9 Steel work, welded in built up sections 29.40 Qui 9908.67
framed work including cutting, hoisting, fixing
in position and applying a priming coat of red
lead paint. (D) In trussses and trussed
purlins, upto 25 M. span and 15 M. ovarall
10 Providing corrugated G.I. sheet of class-3 235.55 Sqmt 734.19
roofing fixed with glavanished iron J or L
Hooks, Bolts and nuts 8mm diameter with
bitumen and G.I. limpet washer or G.I. limpet
washer. filled with white lead complete
excluding the cost of purlins, Rafters and
Trusses.(1) 0.80 mm thick sheet.
11 Providing 20mm thick cement plaster in 147.60 Sqmt 238.41
single coat on single or half brick walls for
interior plastering upto floor two level and
finished even and smooth in (iii) Cement
mortar 1:6 (1- cement:6-sand)
12 Providing and laying polished Kota stone 184.62 Sqmt 1015.82
slab flooring over 20mm (Average) thick
base of cement mortar 1:6 (1-cement : 6-
coarse sand) or L.M. 1.1.5 (1-Lime putty :1.5 -
coarse sand) laid over and jointed with grey
cement slurry mixed with pigment to match
the shade of slab including rubbing and
polishing etc. complete. (A) 25mm thick
13 Finishing wall with water proofing cement 147.60 Sqmt 117.41
paint of on wall surface ( Two coats) to give
an approved brand manufacture and of
requred shape even shade after throughtly
brushing of loose powered materials.
I / Weam / are willing to carryout the work at…………………. % above/ below percent (Should Be
written in figures and words) of the estimated rate mentioned above Amount of my / our tender
works out as under.
*Estimated amount put to tender *Estimated amount put to tender
Deduct ……. % below Rs…………………… Add ………........% Above
Net Rs. …………………….… Total Rs. ………….……........
In words ………………….……………………………. In words ………………….……………………
*( please strike out whichever is not applicable)
1 The Contractor shall exhibition board with detailed specification and details of works directed
by the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt G.R.: PRC-10/2017 Cement Consumption/16/C Date: 11/05/2017 as stated in S.O.R.
therefore in R.C.C. items where the reisa change as per actual mix design the cost of
difference of cement consumption have been deducted from the rate of original item at the
rate of input rate mentioned in all the tender.
Executive Engineer
Signature of the contractor Panchayat (R & B) Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD_ Vadoli Samajik Shed.pdf
BOQ_Vadoli Hanuman Chauk Shed.pdf
Specification_Vadoli Hanuman chauk shed.pdf
GRs - SBD with Index.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .