Tender Value
Refer Docs
Closing Date
27 Oct 2021, 6:00 pmClosed
Executive Engineer PHE Mech. Division Rajouri
Executive Engineer PHE Mech. Division Rajouri
Repairing of different capacities of Transformer and stabilizer installed at various pumping station of Kalakote.
2021_PHE_144296_1
e-NIT PHE/MDR/71 of 2021-22 DATED 16-10-2021
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
RAJOURI
Please refer Tender documents.
3 documents required · 3 mandatory
₹250
Executive Engineer PHE Mech. Division Rajouri
Exempted
RAJOURI
1 Nov 2021
18 Oct 2021
28 Oct 2021
19 Oct 2021
27 Oct 2021
19 Oct 2021
23 Oct 2021
Amount
Repairing of 100KVA transformer installed at pumping station Beragoa by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 8 nos HV coils. P/F of 01 nos LV coils. Providing fitting of 1 nos LV bushes 2 no HV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and P/Filling 50 ltr of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 100 KVA volt. Stabilizer installed at Pumping Station Sarotha Old , job includes disconnecting of incoming and outgoing power cables. Dismantling of the stabilizer by lifting of transformer assembly from the oil tank with the help of chain pulley block and manual labour. Complete rewinding of 1 No. main coil by using superior quality of material and as per its original design, replacement of 2 Nos. rotary switches, connecting the taps of the coil to their respective rotary switches, checking and repairing of its internal control wiring, Assembling the voltage stabilizer after filling of fresh transformer oil 45 ltrs. to top up the level. Making of power connections after proper thimbling. Complete job includes cost of material, labour charges and carriage/shifting charges of stabilizer from station to workshop and then back to site and testing the voltage stabilizer.
Providing & fitting of 50 HP star delta oil immersed double contact starter and aluminium LT cable at pumping station Panjah Kalakote. Job involves removing the damaged/burnt out starter from the panel board after disconnecting the electrical cables. Providing of new 50 HP starter & fitting it on the panel board with the help of fasteners. Reconnecting the electrical cables to the starter after cutting their overheated /damaged ends and thimbling them properly and testing it on full load, job also involves calibration of its overload protection according to its load. Providing & fitting of 3.5 core Aluminium cable of 185 mm sq.-18 mtr by way of removing the damaged/burnt out cable from Transformer to Busbar fuse system and LT pole to main switch. Providing and fitting of new cables from LT pole to main switch after proper thimbling. Complete job includes the cost of material, labour charges and carriage charges at site. Complete job includes the cost of material, labour charges and carriage charges at site.
Providing & fitting 3.5 core Aluminium cable of 185 mm sq.-12 mtr. at pumping station Brehvi Dug Well. Job involves removing the damaged/burnt out cable from Transformer to Bus bar fuse system to LT pole. Providing and fitting of new cables from LT pole to main switch after proper thimbling. Complete job includes the cost of material, labour charges and carriage charges at site.
Repairing of 100 KVA volt. Stabilizer installed at Pumping Station Glaan, job includes disconnecting of incoming and outgoing power cables. Dismantling of the stabilizer by lifting of transformer assembly from the oil tank with the help of chain pulley block and manual labour. Complete rewinding of 1 No. main coil by using superior quality of material and as per its original design, replacement of 3 Nos. rotary switches, connecting the taps of the coil to their respective rotary switches, checking and repairing of its internal control wiring, Assembling the voltage stabilizer after filling of fresh transformer oil 38 ltrs. to top up the level. Making of power connections after proper thimbling. Complete job includes cost of material, labour charges and carriage/shifting charges of stabilizer from station to workshop and then back to site and testing the voltage stabilizer.
Repairing of 100KVA transformer installed at pumping station Sarotha Old by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 7 nos HV coils. P/F of 01 no LV coils. Providing fitting of 2 nos LV bushes 1 no HV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and P/Filling 40 ltr. of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 63KVA transformer installed at pumping station Tattapani by way of dismantling of transformer extracting of all the damaged coils , cleaning and flushing of the oil tank by using chemical to all the carbon deposit. P/F of 7 nos HV coils. P/F of 01 nos LV coils. Providing fitting of 3 nos LV bushes with metal parts, P/F gasket, nut /bolts, tapes and sundry items. Heat treatment of transformer oil and P/Filling 45 ltr of transformer oil. Assembling of transformer and testing on full load. Complete job includes cost of material, labour charges and carriage/shifting charges of transformer from station to workshop and then back to site.
Repairing of 100 KVA volt. Stabilizer installed at Bore Well Badanoo, job includes disconnecting of incoming and outgoing power cables. Dismantling of the stabilizer by lifting of transformer assembly from the oil tank with the help of chain pulley block and manual labour. Complete rewinding of 1 No. main coil by using superior quality of material and as per its original design, replacement of 3 Nos. rotary switches, connecting the taps of the coil to their respective rotary switches, checking and repairing of its internal control wiring, Assembling the voltage stabilizer after filling of fresh transformer oil 55 ltrs. to top up the level. Making of power connections after proper thimbling. Complete job includes cost of material, labour charges and carriage/shifting charges of stabilizer from station to workshop and then back to site and testing the voltage stabilizer.
GANPATI ELECTRICAL AND MECHANICAL WORKS
N B Engineering and Electric Works
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .