Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-AOC | L1 | Accepted-AOC accepted | |
| 2 | L2₹46.0 L+₹12.4 L (37.0%)Rejected-AOC AMRITPUR PO INS CHILKA DIST KHURDA ODISHA 752037 | KHORDHA | ODISHA | 752037 | L2 | Rejected-AOC Rejected |
Tender Value
₹55.1 L
EMD Value
₹55,120
Closing Date
24 Feb 2026, 5:00 pmClosed
SE R.W.DIVISION-II,BHADRAK
O/o the SE R.W.DIVISION-II,BHADRAK
Construction of Boundary Wall, Approach Road of R.I. Office cum Residence building at Narasinghpur in Dist of Bhadrak for the year 2025-26.
2026_CERWI_126205_2
SE/BDK-II/TCN-28/2025-26
Open Tender
Civil Works - Buildings
Percentage
180 days
Bhadrak
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹55,120
Yes
26 Sept 2026
17 Feb 2026
25 Feb 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
17 Feb 2026 - 24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Single Under ream Pile File foundation with RCC -M20 using 12mm size black hard granite chips including cost of boring but excluding cost of MS/Tor steel and labour charges for cutting, bending and binding of steel etc complete.(300mm dia 4.0 Mt Length) | 79 | Nos | 5,543.86 | ₹4,37,964.94 |
| 2 | Earth work in excavation in foundation in hard soil including earth mixed boulder(except sheet rocks and boulder requiring blasting) with all leas and lifts including dressing and levellingthe bed and depositing the excavated earth at places away fro the work site with all leads and lifts including all cost of all labour ,T & P & dewatering if required for the work etc.complete as per the specification and direction ofthe Enginer-in charge . | 52 | cum | 276.9 | ₹14,398.8 |
| 3 | Providing , Filling manually with approed quality in foundation & plinth with sand well watered & rammed in 22.5 cm (9”) thick layers including watering and ramming with cost , conveyance royalty, taxes of the materials and labour T&P required for the work etc. complete as per specification and direction of Engineer-In-Charge. | 219.95 | cum | 1,028.6 | ₹2,26,240.57 |
| 4 | Providing Cement concrete (1:3:6 ) using 40mm. size hard crusher broken grinite metal of approved quality from approved quarry in foundation and plinth including hoisting , lowering , laying in layers not exceeding 0.15mt. in thick , compacting , water curing with all cost, carriage, royalty, all taxes, labour & T. & P. etc. complete as per specification and direction of E.I.C. | 34.35 | cum | 8,364.3 | ₹2,87,313.7 |
| 5 | Cement concrete (1:2:4) with 12mm hard granite chips(Crusher broken) per 1 cum. | 58.5 | cum | 10,350.06 | ₹6,05,478.51 |
| 6 | Fly ash brick masonry in cement mortar ( 1:6 ) having a crushing strength of not less than 75kg/cm2 including all necessary projections ,splays, cutting, circular moulding , curbelling , champering , watering , curing after immerging the bricks in nwater for six hours before use etc with all cost of materials,all materials for scafolding upto 5 mtr height , carriage, royalty,all taxes , labour, & T.&P. etc. complete, as per specification and direction of E.I.C.A) Foundation & plinth | 62.56 | cum | 6,180.1 | ₹3,86,627.06 |
| 7 | B) Super structure ( I ) Ground floor | 102.38 | cum | 6,213.4 | ₹6,36,127.89 |
| 8 | R.C.C. of M-20 grade with 20mm down graded size H G chips of approved quality and from approved quarry for cement work including hoisting, lowering , laying in position in layers with proper packing and ramming by means or vibrator slope and level including cost , curring for conveyance , royalties and taxes of all materials and all labour T &P required for the work etc. complete as per specification and direction of Engineer-In-Charge. A) Pile Cap | 8.53 | cum | 8,999.4 | ₹76,764.88 |
| 9 | B) Coulmn & beam | 22.56 | cum | 16,489.5 | ₹3,72,003.12 |
| 10 | C ) Lintel( I ) Ground floor | 7.31 | cum | 13,303.1 | ₹97,245.66 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.97 MB
Tendernotice_2.pdf
PDF • 7.34 MB
BOQ_581684.xls
BOQ • 1.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .