| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-Finance | ₹10.5 L | L1 | Accepted-Finance LOWEST |
| 2 | L2₹12.2 L+₹1.7 L (16.2%)Rejected-Finance | ₹12.2 L+₹1.7 L (16.2%) | L2 | Rejected-Finance SECOND LOWEST |
| Sl No | Description | Qty | Unit | J S Subhash Chandra Babu L1 | RAJESH.P.L L2 |
|---|---|---|---|---|---|
| 1.00Renovation of pond | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 69 | cum | 364.04 ₹25,118.76 Lowest | 422 ₹29,118 |
| 1.00 | OD47792/2026-2027:Dry rubble masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of materials labour charge etc.complete as per direction of departmental officer in charge. up to plinth level . | 142.6 | cum | 4,041.39 ₹5,76,302.21 Lowest | 4,694 ₹6,69,364.4 |
| 1.00 | OD83227/2026-2027:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level | 25.76 | cum | 8,262.99 ₹2,12,854.62 Lowest | 9,598 ₹2,47,244.48 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 9.66 | cum | 10,083.5 ₹97,406.61 Lowest | 11,713 ₹1,13,147.58 |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 27.6 | sqm | 849.68 ₹23,451.17 Lowest | 1,000 ₹27,600 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 947.79 | kilogram | 113.77 ₹1,07,830.52 Lowest | 132 ₹1,25,108.81 |
| 1.01 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 25 | hour | 349.69 ₹8,742.25 Lowest | 406 ₹10,150 |
Tender Value
₹10.6 L
EMD Value
₹26,560
Closing Date
15 Jul 2026, 6:00 pmClosed
Leejiaraju
Office of aee ulloor zonal
Ksmart File No 4978273-2026- Omanakulam Side wall construction Balance work
2026_LSGD_859457_1
AEE/KZTM/DB/T04/2026-27
Open Tender
Civil Works - Others
Item Rate
Cheruvaykkal Ward
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,500
Yes
₹26,560
Yes
15 Sept 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
15 Jul 2026
7 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Renovation of pond | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | - | cum | - | - |
| 1.002 | OD47792/2026-2027:Dry rubble masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of materials labour charge etc.complete as per direction of departmental officer in charge. up to plinth level . | 1 | cum | - | - |
| 1.003 | OD83227/2026-2027:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level | - | cum | - | - |
| 1.004 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.005 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | - | sqm | - | - |
| 1.006 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 0.6 | kilogram | - | - |
| 1.007 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | - | hour | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1453204.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
Tendernotice_2.pdf
PDF • 0.18 MB
Tendernotice_3.pdf
PDF • 0.24 MB
pree.pdf
Tender Documents • 0.25 MB
viewsbd.pdf
Tender Documents • 1.74 MB
affi.pdf
Tender Documents • 0.23 MB
form.pdf
Tender Documents • 0.24 MB
BOQ_1453204.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .