Tender Value
₹46.4 L
EMD Value
₹46,500
Closing Date
7 Sept 2026, 6:00 pm
Executive Engineer
Construction of Canal Syphon, HR cum Fall Structures at Ch.620m of Pigut RBMC, Netrang Di.Bharuch
337605
18 of 202627
Open
Civil - All
Works
Narmada
8 documents required · 8 mandatory
₹1,500
EXECUTIVE ENGINEER IRRIGATION PROJECT DIVISION NO.4, RAJPIPLA
₹46,500
24 Aug 2026
24 Aug 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender ( Upto INR 50 Cr.)
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to figures
book of specifications)
1 Clearing the canal Banks outer and
inner Slopes by Jungle Cutting,
removing Vegetation, Ghabajaria,
Trees etc. along with burning it's and 26400.00 Sqmt. 10.30
carrying away as and where required
and as directed etc. completed by
2 Dismantling the CC (Lining) including
disposing off the dismentalled materials
as directed etc complete 7.5cm. 2418.00 Sqmt. 86.50
3 Clearing the silt from the canal/drain
bed by a digging the same to the
required bed level and gradient
including depositing the excavated
earth regularly in spoil bank for
utilizing the same preparing the banks
after breaking clods as and where
directed for all leads and lifts G-1(A) a
For Canals Between 21 to 250 Cusec.
& 0 to 1.5 m lift.
4 Earth work in embankment using
selected soil, soft & hard murrum
excavated from approved borrow area /
village tanks etc. Including conveying,
spreading in uniform layers, breaking 725.40 Cmt. 110.80
clods and dressing to the designed
canal section etc. with lead upto 2 Km
and all lifts (for canals having capacity
up to 300 Cusec) ( By Machinery ).
5 Compaction for making embankment
for canal by laying in regular layers of
15 cm in thickness including breaking
clods to 25 mm size incl. light rolling 929.70 Cmt. 27.70
by suitable rollers with slight watering
to facilitate rolling and dressing the
side slopes etc.
Trimming of the canal section manually
6 for preparing subgrade for laying
cement concrete lining in all sorts of
soil and murrum including watering
and compacting bed etc. complete.
7 Providing and laying plain/reinforced
cement concrete lining of M 15 (MSA
20 mm) in bed, side slopes and
curvature including batching, mixing,
transporting, placing, vibrating, smooth 2340.00 Sqmt. 327.90
finishing, curing including dewatering
where required. (MACHINERY
BASED by "FLORI" - WITHOUT
PAVER, WATER CURING) 7.5 cm
thick lining in Bed / Slope.
8 Providing and filling the polysulphide
joint sealant of the approved make in
the expansion and contraction joints in
the c.c. lining including clearing the
joints with air water jet.
9 Dismantling the existing stone masonry
including sorting out and stacking the
useful material and removing the debris
and making good the damages etc.
complete as directed. In Cement Mortar
10 Dismantling the existing foundation
concrete including sorting out the
dismentalled stuff and stacking the
useful material, removing the debris
and making good the damages etc.
complete as and where directed.
Cement Concrete
11 Dismantling the R.C.C. work and
disposing off the stuff including
stacking of the useful materials etc. 1.28 Cmt. 1732.80
complete as directed. Light
Reinforcement (Main bar upto 16mm
12 Dismentalling the existing R.C.C. pipes
of the following diameter including
sorting out and stacking of the useful 10.00 Rmt. 577.60
materials including refilling the
trenches etc. complete as directed. NP2
450 mm to 600 mm dia
13 Dismentalling the existing R.C.C. pipes
of the following diameter including
sorting out and stacking of the useful 20.00 Rmt. 866.40
materials including refilling the
trenches etc. complete as directed. NP2
650 mm to 900 mm dia
14 Excavation for foundation in all sorts of
soil including yellow sandy gravelly 323.60 Cmt. 107.80
soils, soft & hard murrum etc. in dry
condition including depositing the
excavated stuff in uniform layers in
banks or as and where directed etc.
complete for lead up to 500m and all
lift. (BY MACHINERY) including
15 Providing & Laying in position
"NOMINAL MIX" cement concrete
using cement, sand and crushed
aggregate by mass and machine mix for
C.C./R.C.C work incl. necessary
formworks centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc
complete Without Dewatering and
excluding cost of steel reinforcement.
(A) For Foundation concrete / General
purpose (c) C. C. Nominal Mix, M-15
16 Providing & Laying in position with
Batch Mix Plant & Transit Mixer
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate for
C.C./ R.C.C work including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc
complete without dewatering and
excluding the cost of steel
reinforcement. (A) For Footing of
column / Abutment / Pier / Bottom slab
of barrel / Plinth course / Coping /
Approach Slab etc. (f) Concrete grade
M-25 and MSA-40 mm
17 Providing & Laying in position with
Batch Mix Plant & Transit Mixer
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate for
C.C./ R.C.C work including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc
complete without dewatering and
excluding the cost of steel
reinforcement. (E) For Column / Beam
/ Solid Slab of Road Bridge / Barrel /
Cutoff wall etc. M-25 and MSA-20 mm
18 Providing & Laying in position with
Batch Mix Plant & Transit Mixer
"DESIGN MIX" cement concrete using
cement sand and crushed aggregate for
C.C./ R.C.C work including necessary
formwork, centering, scaffolding,
compaction by vibrator, curing as
directed with all lead & lift etc
complete without dewatering and
excluding the cost of steel
reinforcement. (B) For Pier and
Abutments / Wing wall / Head wall /
Return wall / Dowel wall etc. (i)
Concrete grade M-20 and MSA-20 mm
19 Providing & Placing in position
reinforcement bars including cutting,
bending, welding joints where 9.10 MT 82019.00
necessary, hooking etc. complete as per
drawing for all lead and lifts. TMT /
20 Providing and fixing in position
(different diameter) I.S., NP-3 class
reinforced pipe with caulking the joints
with cement mortar 1:1 proportion,
using jute string soaked in cement
slurry, finishing joints and laying pipes
to the designed grade and levels, curing
etc. complete for all leads and lifts. NP-
3 class 600 mm dia. Pipe.
21 Providing and fixing in position (
different diameter ) I.S.,NP-3 class
reinforced pipe with caulking the joints
with cement mortar 1:1 proportion,
using jute string soaked in cement
slurry, finishing joints and laying pipes
to the designed grade and levels, curing
etc. complete for all leads and lifts.NP-
3 class 600 mm dia. Pipe.
22 Providing and fixing in position
mm wide steps (for ladder) of 28 mm
diameter bars at a spacing of 30 cm c/c No. of
with M.S. bar 40x40x6 mm size angle steps
including painting the same with three
coats of paint etc. complete. As
directed & as per drawing.
23 Providing and fixing steel grill over
canal syphon well as directed etc. 1768.80 Kg 67.90
complete as per drawing.
24 Back filling the foundation trenches
around the structures etc with selected
excavated stuff including watering,
ramming, compacting etc. complete.
25 Earth work in embankment using
selected soil, soft & hard murrum
excavated from approved borrow area /
village tanks etc. Including conveying,
spreading in uniform layers, breaking
clods and dressing to the designed
canal section etc. with lead upto 2 Km
and all lifts (for canals having capacity
up to 300 Cusec) ( By Machinery )
26 Providing and fixing in position 1.80 m
high above finished ground level canal
data boards of standard size 1.20m x
0.90m with M.S. angle 40mm x 40mm
x 6mm with 3mm thick iron plate in
1:5:10 proportion concrete block size
40cm x 40cm x 75cm including
painting existing data on the board etc.
complete as directed.
27 Providing and laying plain/reinforced
cement concrete lining of M 15 (MSA
20 mm) in bed, side slopes and
curvature including batching, mixing,
transporting, placing, vibrating, smooth
finishing, curing including dewatering
where required. (MACHINERY
BASED by "BATCH MIX PLANT &
TRANSIT MIXER" - WITHOUT
PAVER MEMBRANE CURING)
10cm thick lining in Bed / Slope.
28 Providing and laying 230 mm thick
pucca rubble pitching in cement mortar
in 1:5 proportion with the surface 266.20 Sqmt. 767.80
pointed with cement mortar of 1:3
proportion including curing etc
complete for all lead and lifts.
29 Manufacture, supply and erection of
vertical gate considering gate leaf,
stiffeners, rubber seal, embedded parts
as shown in drawings including cost if
materials, fabrication, painting, erection
in position with all accessories second
stage concreting etc complete as per
drawings and specifications. Gate Size
- Open Type Gate -0.80X0.80
I/We/am/are willing to carryout the work at… ................. % above/below percent (Should
Be written in figures and words) of the estimated rate mentioned above. Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book In In
of specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)………………………………
(C)Net Tendered Amount (A-B) (in figure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. as stated in S.O.R .therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Sign Of Contractor Deputy Executive Engineer Executive Engineer
Dholi Irrigation Subdivision Irrigation Project Division No.4
Rajpardi Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP Pigut RBMC 620CSY Fall.pdf
BOQ Pigut RBMC 620m CSY.pdf
Technical Specifications Pigut RBMC 620 CSY.pdf
Nit syphon 2.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].