Loading…
Loading…
Tender Value
₹4.9 L
EMD Value
₹9,792
Closing Date
1 Sept 2026, 6:00 pm7d left
Executive Engineer Rew Baramulla
REW BARAMULLA
Construction of RCC Culvert at different spots at Tarzoo C Sopore Baramulla, Block Sopore, under PRI, FY 2026-27
2026_RDPR_320712_20
198 Xen/Rew/Bla/2026-27 Dated 12/08/2026
Open Tender
Civil Works
Percentage
45 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Baramulla
₹9,792
12 Aug 2026
12 Aug 2026
2 Sept 2026
12 Aug 2026
1 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | - | cum | 479.3 | - |
| 2 | Providing /laying of stone soling handpacked under floors and foundation trenches including dressing, watering, compacting incl. plum and all carriage up to site of work complete job | - | cum | 1,200 | - |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:2:4 (1 Cement : 2 coarse sand : 4 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete. | - | cum | 6,591.25 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for:columns pillars abutments etc | - | sqm | 286.35 | - |
| 5 | Providing and laying in position reinforced cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work up to plinth level: 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 crushed graded stone aggregate 20 mm nominal size ) excld. carriage of all materials involved complete Raft | - | cum | 7,788.4 | - |
| 6 | Steel reinforcement in RCC work including cutting fixing complete FE500 TMT Bars | - | kg | 123.5 | - |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for-Slab, Suspended Floors etc | - | sqm | 718.2 | - |
| 8 | Carriage of Materials Sand/Aggregate for an avg lead of 25kms by MT | - | cum | 460.41 | - |
| 9 | Providing /Fixing CIB including Photographs of work before, during & after execution of work complete job/railing/plaster and any unforseen item dewatering as per requirement | - | Job | 12,000 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_1067363.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].