Loading…
Loading…
Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.5 LAccepted-AOC | L-1 | Accepted-AOC Being 1st lowest | |
| 2 | L-2₹2.6 L+₹1,245.18 (0.48%)Rejected-AOC DHALIWAL | FATEHGARH SAHIB | PUNJAB | 140402 | L-2 | Rejected-AOC Being 2nd lowest |
Tender Value
₹2.5 L
EMD Value
₹6,000
Closing Date
18 Feb 2026, 9:00 amClosed
EE Nirmand
Executive Engineer Outer Seraj Division HP PWD Nirmand
R/R Damage on Brow to Poshna road Km 0/000 to 13/180
2026_PWD_128330_12
No PW OSDN Tender 2025 11252-57 dated 04.02.2026
Open Tender
Civil Works
Percentage
90 days
Nirmand
Please refer Tender documents.
13 documents required · 13 mandatory
₹500
₹6,000
21 Apr 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation for foundation of structures upto all depth as per drawing and technical specification clauses 305.1 including setting out, construction of shoring and bracing , removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per direction of The Engineer-In-Charge complete. | 38.72 | Cubic Metre | 398.15 | ₹15,416.37 |
| 2 | Providing and laying of boulder apron laid in wire crate with 4mm dia GI wire conforming to IS:280 and IS: 4826 in 100 mm x 100 mm mesh ( woven diagonally ) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specification including carriage of materials in all leads and lifts and as per directions of The Engineer – in – Charge complete. (Wire crate will be supplied by the department) | 111.36 | Cubic Metre | 1,800 | ₹2,00,448 |
| 3 | Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 including carriage of materials in all leads and lifts as per direction of The Engineer-In-Charge complete. | 19.2 | Cubic Metre | 1,045 | ₹20,064 |
| 4 | Earth filling in roadway behindbn abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 including carriage of materials in all leads and lifts as per direction of The Engineer-In-Charge complete. | 51.2 | Cubic Metre | 256 | ₹13,107.2 |
stage.html
html • 0.04 MB
technical_189750.pdf
techsummary_189750.pdf
finance_189750.pdf
BOQ Comparative Chart
xlsx
finsummary_189750.pdf
AOC128330_12.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_189750.xls
BOQ • 0.28 MB
SBDNo12.pdf
Tender Documents • 3.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .