Loading…
Loading…
Tender Value
₹26.8 L
EMD Value
₹2.7 L
Closing Date
1 Jul 2026, 2:00 pm7d left
Similar tender results from the same govt authority in the past 3 years.
Dinesh kumar
Office EO NP saiyadraza chandauli
WD no.7 me kali mata mandir parisar me rcc slab v rangai potai karya
2026_DOLBU_1162654_1
Letter No.417 Date 19.06.2026
Open Tender
Civil Works
30 days
Chandauli
WD no.7 me kali mata mandir parisar me rcc slab v rangai potai karya
3 documents required · 3 mandatory
₹2,700
Office EO NP saiyadraza chandauli
₹2.7 L
22 Jun 2026
22 Jun 2026
1 Jul 2026
22 Jun 2026
1 Jul 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts.D6 | - | Cum | - | - |
| 2 | Earth in cutting for embankment in ordinary soil excavation to done from of regular pits not exceeding 1/2 m , in depth and work embankment to be in 20 cm .layers including ramming and dressing the surface to required levels and slopes and also including 1.5 M .lift and 30 M .lead the from cutting to be used in making embankment or to be deposited as spoil banks with in 30 m distance as directed by the engg. in charge. S.O.R.253 | 1 | Cum | - | - |
| 3 | Providing and laying cement concrete 1:6:12 (1 cement: 6 fine sand : 12 graded brick aggregate 40 mm. Nominal size) including supply of all materials, labour and T & P etc. required for propercompletion of the work and curring complete, also including cost of form work in foundation and floors. SOR-273 | 1 | Cum | - | - |
| 4 | Concrete with 4 cm guage brick ballast , sand of 1.25 FM and cement in proportion of 4:2:1 in foundation nd under floors including supply of all materials labour tools and plants etc. required for proper completion of work SI. 273 | 1 | Cum | - | - |
| 6 | R.C.C. work in 1:2:4 with cement , coarse sand & stone ballast for slab etc all comp. Si no 284 | - | Cum | - | - |
| 7 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | 1 | Qtl | - | - |
| 8 | M-150 brick work in 1:4 cement and sand of 1.25 fineness modulous mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work. SOR 305 | - | Cum | - | - |
| 9 | 12mm thick plaster with cement & fine sand of 1.25 F.M. mortar in 1:4 including supply of all materials labour and T&P etc. required for proper completion of work SI no-584 | - | sqm | - | - |
| 10 | Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | - | kg | - | - |
| 11 | water proof wall putty two coats | - | Cum | 1 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.04 MB
NIT.pdf
Tender Documents • 2.02 MB
BOQ_2179270.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid