| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹90.0 LAccepted-AOC | ₹90.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹92.0 L+₹1.9 L (2.16%)Rejected-AOC | ₹92.0 L+₹1.9 L (2.16%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | P P MANOJ L2 | C. H. MOHAMMED ASHARAF L1 |
|---|---|---|---|---|---|
| 1.00Construction of SWECB | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 45 | sqm | 18.51 ₹832.95 | 18.12 ₹815.4 Lowest |
| 1.00 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | 22.5 | metre | 1,809.67 ₹40,717.58 | 1,771.36 ₹39,855.6 Lowest |
| 1.00 | OD53708/2025-2026:RING BUND Putting up ring bund with earth fille gunny bags of top width 4.0m bottom width 7.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 24 | metre | 5,238.26 ₹1,25,718.24 | 5,127.35 ₹1,23,056.4 Lowest |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 132 | hour | 465.05 ₹61,386.6 | 455.21 ₹60,087.72 Lowest |
| 1.00 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 227.79 | cum | 2,562.9 ₹5,83,802.99 | 2,508.64 ₹5,71,443.11 Lowest |
| 1.01 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 20.96 | cum | 3,738.97 ₹78,376.29 | 3,659.8 ₹76,716.73 Lowest |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 316.52 | cum | 262.33 ₹83,032.69 | 256.78 ₹81,276.01 Lowest |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 95.2 | cum | 4,066.41 ₹3,87,122.23 | 3,980.31 ₹3,78,925.51 Lowest |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 94.14 | sqm | 393.21 ₹37,016.79 | 384.88 ₹36,232.6 Lowest |
Tender Value
₹84.3 L
EMD Value
₹50,000
Closing Date
19 May 2026, 6:00 pmClosed
Executive Engineer Minor Irrigation Division Kannu
Office of the Executive Engineer Minor Irrigation Division Kannur (PO) Civil station Kannur 670002
GENERAL-UDUPPA SWECB-Reconstruction of Uduppa SWECB at Kanool- Uduppa in Anthoor Municipality in Thaliparamba Constituency, Kannur District-General Civil Work
2026_Irrig_845917_2
IRR/IA/TR/5717/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
545 days
Anthoor Municipality
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
13 Aug 2026
12 May 2026
22 May 2026
12 May 2026
19 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of SWECB | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 60.1.1:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. | - | metre | - | - |
| 1.003 | OD53708/2025-2026:RING BUND Putting up ring bund with earth fille gunny bags of top width 4.0m bottom width 7.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | - | metre | - | - |
| 1.004 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | - | hour | - | - |
| 1.005 | 15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 1 | cum | - | - |
| 1.006 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 1 | cum | - | - |
| 1.007 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 1 | cum | - | - |
| 1.008 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | - | cum | - | - |
| 1.009 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1436531.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1436531.xls
BOQ • 0.31 MB
epayment.pdf
Other Document • 0.01 MB
declaration.pdf
Other Document • 0.10 MB
SBD.pdf
Tender Documents • 7.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .