Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC 17 01 DISTRICT TREASURY THAMARASSERY | KOZHIKODE | KERALA | 612906 | L1 | Accepted-AOC lowest bid | |
| 2 | L2₹4.6 L+₹58,949.44 (14.7%)Rejected-AOC 1003 SUB TREASURY DEVIKULAM | L2 | Rejected-AOC second lowest | |
| 3 | Rejected-Technical PERAMBRA KERALA | - | Rejected-Technical THIRD LOWEST |
Tender Value
₹4.2 L
EMD Value
₹10,569
Closing Date
30 Sept 2023, 6:55 pmClosed
Assistant Executive Engineer
KyIP(O,M) Subdivision, Peruvannamuzhi, PIN - 673 528
Rectification works to RBMC by raising the height of canal
2023_Irrig_602436_1
IRR/PI/EST/4342/2023_5_8_7
Open Tender
Civil Works - Canal
Item Rate
90 days
Maruthonkara
Please refer Tender documents.
7 documents required · 7 mandatory
₹935
Yes
₹10,569
Yes
31 May 2025
13 Sept 2023
4 Oct 2023
13 Sept 2023
30 Sept 2023
13 Sept 2023
13 Sept 2023 - 28 Sept 2023
Amount
CANAL LINING
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge25 mm average thickness
RAJAN
C K AMMED
Bidder Name
RAJAN
JIMMI DAVID
C K AMMED
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_896074.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .